North Central Railway Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

North Central Railway - NCR Tender

Works
Transportation and Logistics
Furnitures and Fixtures
Ireps
Opening Date2 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 10,01,06,238.93 
Notes
Download

Costs

Summary

Complete Furnishing Activities Of Gscn, Gs, Slr And Gscz Coaches During Poh /ss-ii/ss-iii Of Icf & Lhb Type Of Bg Coaches

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour cost for replacement/ repair of PVC sheet in POH coaches as per scope of work (inclusive of all taxes).

-

-

4

... More
Labour cost for replacement /repair of body side windows, door windows & lavatory windows as per scope of work (inclusive of all taxes).

17660

153

2706571.6

... More
Labour cost for replacement / repair of luggage rack as per scope of work (inclusive of all taxes)

2230

102

227839.1

... More
Labour cost for replacement /repair of emergency windows as per scope of work (inclusive of all taxes).

2649

204

541270.17

... More
Complete new Ceiling fitment in each lavatory including moulding, cutting of slot and striping work as per scope of work (inclusive of all taxes)

1766

286

505482.18

... More
Labour cost for furnishing activities in POH/SS- II/SS-III coaches as per scope of work (inclusive of all taxes).

883

4232

3736891.32

... More
Complete repair of Long Seat (Long seat and backrest, middle berths, side upper berths, Upper berth for passenger compartment and disable compartment) for all type of coaches. As per scope of work (inclusive of all taxes).

39735

393

15638503.95

... More
Complete repair of Single side lower and backrest turn-over seats, for all type of coaches. As per scope of work (inclusive of all taxes).

13245

196

2606351.1

... More
Sewing of seat cover for Long Seat (Long seat and backrest, middle berths, side upper berths, and Upper berth for passenger compartment and disable compartment) for all type of coaches as per scope of work (inclusive of all taxes).

30022

42

1272632.58

... More
Sewing of seat cover for Single side lower and backrest turn-over seats, for all type of coaches as per scope of work(inclusive of all taxes)

15011

26

401844.47

... More
Strip and refitment of fall plate or sliding/rolling door/rolling shutter or foot step 10 assembly strip, repair and refitment with welding work or ventilator stripping, refitment and cleaning from both side (outer and inner) including change of damaged rubber items as per Scope of work (inclusive of all taxes) 11

4415

186

821410.75

... More
Seat bracket strip & fitment as per scope Of work (inclusive of all taxes).

3532

61

218136.32

... More
Replacement of turn over holding device including seat adjustment/ levelling of turn over as per scope of work (Inclusive of all taxes)

3322

63

211511.74

... More
Strip and refitment of Seat and Berth (Lower, Upper /MiddIe /Side Upper/Turnover/ Lower seat/ Attendant Seat/ Attendant Backrest/ Single side seat/ backrest) in BG coaches as per scope of work (inclusive of all taxes).

52980

184

9759445.8

... More
Stripping of overhead water tank of BG Coaches as per scope of work (inclusive of all taxes).

3532

794

2807127.64

... More
Repair & testing of overhead water tank of BG Coaches as per scope of work (inclusive of all taxes).

4415

826

3649262.4

... More
Overhead Water tank fitting on BG Coaches aS per scope of work (inclusive of all taxes). 4

3532

286

1010540.52

... More
Plumbing work of BG Coaches as per scope of work (inclusive of all taxes)

3532

413

1459704.96

... More
Stripping of under slung water tank for BG coaches as per scope of work (inclusive of all taxes).

552

699

386068.8

... More
Repair & testing of under slung water tank for BG coaches as per scope of work (inclusive of alltaxes).

772

731

564478.68

... More
Under slung water tank fitting on coach for BG coaches as per scope of work (inclusive of all taxes).

552

635

350967.12

... More
Stripping of old bio-tank from incoming coaches as per scope of work (inclusive of all taxes).

6534

138

906396.48

... More
Cleaning and Complete Repair of old bio-tank including conversion of P Trap to S Trap/Modified S Trap as per scope of work (inclusive of all taxes)

6534

554

3625977.96

... More
Installation and commissioning of bio digester tanks as per scope of work (inclusive of all taxes) 4

6534

1387

9065271.6

... More
To Empty bio-tanks before condemnation as per scope of work (inclusive of all taxes).

552

238

131607.84

... More
Cold water high pressure jet washer for cleaning of bio tanks Make- Karcher, Comac, IPC as per scope of work (inclusive of all taxes).

1

353588

353588.28

... More
Manufacturing, assembly, supply & commissioning of Roller blinds in windows of 1st AC LHB coaches as per scope of work (inclusive of all taxes).

148

2799

414254.96

... More
Work of Supply of flexible ducting for LHB Lavatory. As per scope of work (inclusive of all taxes).

176

1843

324515.84

... More
Labour cost for repair/ fitment of Aluminum ducting as per scope of work (inclusive of all taxes)

176

455

80212

... More
Dismantling, Repair and fitment of UIC vestibules of ICF/LHB type coaches as per scope of work (inclusive of all taxes).

3312

533

1766124

... More
Provision of Venturi system in LHB coaches GIS per scope of work (inclusive of all taxes).

883

659

582735.85

... More
Dismantling, Repair and fitment of body side doors of ICF/LHB type coaches as per scope of work (inclusive of all taxes).

8168

638

5212980.96

... More
Dismantling, Repair and fitment of Luggage/Sliding doors (ICF/LHB type) of SLR/SLRD/VPH/RS/ DEMU/DHMU/MEMU coaches as per scope of work (inclusive of all taxes).

1766

847

1495943.28

... More
Labour cost for Overhauling of vestibule sliding door and their mounting mechanism As per scope of work (inclusive of all taxes).

618

1263

780941.88



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.