North Central Railway Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

North Central Railway - NCR Tender

Works
Machinery and Tools
Ireps
Opening Date15 Dec 2023
Closing Date10 Jan 2024
Tender Amount₹ 1,68,05,906.15 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Repairing Of Track Machine By Cutting, Welding And Grinding Of Assemblies And Sub- assemblies As Per Schedule Of Work At Tmd/jhs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Refilling of nitrogen gas in different type of accumulators (20Lt) scope of work will cover following 04 items. .1-Before filling of nitrogen the contractor has to check the condition of valve, bladder etc. of accumulator. 2- Proper document of genuineness of nitrogen gas will be submitted by the contractor. 3- Any wastage of gas due to above reason only contractor will be responsible. 4- Contractor has to fill the nitrogen gas as per prescribed pressure @ 201bar . -5All equipment & T&P which is required for refilling shall be arranged by the contractor. 6-After refilling the contractor will have to check the same with machine in charge that there is no leakage and pressure is up to the mark. 7 - Duly nitrogen fill accumulator shall be inspected by SSE/TMD /JHS for any leakage and correctness of N2pressure.

8

3110

24886.24

... More
Refilling of nitrogen gas in different type of accumulators(10Lt) scope of work will cover following items-1-Before filling of nitrogen the contractor has to check the condition of valve, bladder etc. of accumulator.2- Proper document of genuineness of nitrogen gas will be submitted by the contractor. 3-Any wastage of gas due to 05 above reasononly contractor will be responsible.4-Contractor has to fill the nitrogen gas as per prescribed pressure@ 01bar. 5-All equipment &T&P which is required for refilling shall be arranged by the contractor. 6-After refilling the contractor will have to check the same with machine incharge that there is no leakage and pressure is up to the mark. 7-Duly nitrogen fill accumulator shall be inspected by SSE/TMD/JHS for any leakage and correctness of N2pressure.

8

1689

13518.8

... More
Refilling of nitrogen gas in different type of accumulators (2.5/1Ltr) scope of work will cover following items. 1.- Before filling of nitrogen the contractor has to check the condition of valve, bladder etc. of accumulator. 2- Proper document of genuineness of nitrogen gas will be submitted by the contractor. 3- Any 06 wastage of gas due to above reason only contractor will be responsible. 4- Contractor has to fill the nitrogen gas as per prescribed pressure @ 20bar . -5 All equipment & T&P which is required for refilling shall be arranged by the contractor. 6-After refilling the contractor will have to check the same with machine in-charge that there is no leakage and pressure is upto the mark. 7 - Duly nitrogen fill accumulator shall be inspected by SSE/TMD /JHS for any leakage and correctness of N2pressure.

8

859

6879.68

... More
Providing & fixing of laminated glass sheet on window in replacement where broken to pay actual quantity done. Scope of work will cover cutting grinding of glass as per actual profile on machine but quantity of glass shall be calculated sq/rectangle dimensions.

400

350

140180

... More
Cleaning & Overhauling of water radiator. Scope of work will cover following items- 1- Dismantling 08 of all fitting of radiator. 2- Taking out the radiator from machine. 3- Cleaning of fins externally. 4- Cleaning of cooling tubes with chemical internally. -5 Attending leakage if any. 6- R eplacing top and bottom gaskets. 7- R eplacing cap. 8- R efitting on machine and complete assembling. 8- Gaskets and nut bolts shall be provided by contractor if required for replacement of defective ones.

45

10849

488245.5

... More
Repairing of seat. Scope of work will cover following items. .1 R eplacement of Rexene, cushion for 09 sitting side and back rest, foam and cloth for astar and spring. 2. Welding and repairing adjusting system. 3. P ainting the seats. 4 Openiig and re--xxig.. Stet box top side (size-9Sq feet area will be treated as one unit) seat fitting with Rexene and foam wooden box repair and inside, outside painting.

45

2473

111304.8

... More
a)Repairing and reconditioning of cabin floor work as under- A) Removing and dismantling of cabin 10 decayed floor after opening of fitted items on floor. B) Repairing and replacing the rusty pipe structure of floor by gas cutting then fitting new pipe by welding and grinding the surface area as per proper size as required. C) Fitting of all opened items as originally fitted in the cabin. D) Reinforcing the cabin floor structure, additional MS pipe supports to sturdy the floor structure so it can provide strong grip to floor ply.

10

1314

13144.3

... More
b)Fixing a new compressed chequered board of 19 mm thick water proof on the cabin floor and fixing by self threading bolt properly in both cabin.

150

321

48256.5

... More
c)Fixing a new aluminium chequered plate with aluminium strip by self threading screw at all corners & joints of floor

200

253

50736

... More
Replacing of conveyor belts of different sizes as per schedule of work on BCM. (Material will be provided by Railways) [Schedule of work annexed as Ann-A]

16

20938

335022.08

... More
Dismantling and assembly of ascending /descending trough from and on to BCM as per schedule of work. (2jobs each machine) [Schedule of work annexed as Ann-B]. All material and consumables required for repair of trough shall be provided by the contractor.

8

18081

144650.88

... More
Dismantling and assembly of corner roller, connecting elbow, turret gearbox, Arch plate and connecting chain as per Schedule of work. [Schedule of work annexed as Ann-C]

4

28394

113579.32

... More
Dismantling , assembly and fixing of rollers , support rings and fixing of scud plate by re-drilling and threading on main conveyor as per schedule of work [Schedule of work annexed as Ann-D]

4

25042

100169.92

... More
Repairing by fabrication of damaged hood assembly as per schedule of work. [Schedule of work annexed as Ann-E]

4

14632

58530.36

... More
Repairing of Parent Bore for corner roller no.1 of Ascending Side Trough as per schedule of work. [Schedule of work annexed as Ann-F]

6

10772

64634.46

... More
Repairing of parent Bore for corner roller no.3 of Descending side Trough as per schedule of work. [Schedule of work annexed as Ann-G]

6

9214

55284.6

... More
Repairing of Parent Bore for corner roller no.5 of Descending Side Trough as per schedule of work. [Schedule of work annexed as Ann-H]

8

13318

106547.36

... More
Repairing of Lifting unit complete as per schedule of work of BCM. [Schedule of work annexed as Ann-I]

4

18123

72495.6

... More
Repairing of extra lifting cylinder by making the bore oversize with provision of oversize piston rod, gland to suit the bore as per schedule of work. [Schedule of work annexed as Ann-J]

8

7529

60238

... More
Dismantling three major parts of the descending trough including taking out 2 guide rods, replacing seals of 2 no . chain tensioning cylinders &, replacing bushes after machining etc as per need & assembling the same as per schedule of work. [Schedule of work annexed as Ann-K]

4

7922

31691.32

... More
Repairing by cutting, grinding, surface preparation and welding of 20mm plate in flapper system of excavating unit in FRM machine at TMD shop floor as per schedule of work(one job equals to one cutter unit) (Schedule of work annexed as Ann-L]. All material required for the repair shall be provided by the contractor.

8

100377

803016

... More
Dismantling & fixing of excavating conveyor belt by providing lateral support small link plates complete as per schedule of work. One Job each machine (both side) [Schedule of work annexed as Ann-M]

4

169680

678720

... More
Providing & fixing of metlon / taflan sheet on excavating conveyor by necessary drilling, cutting etc as per schedule of work of FRM. Two Job each machine [Schedule of work annexed as Ann-N]

6

35517

213103.02

... More
Providing & fixing of metlon/taflan sheet by necessary drilling, cutting etc in Main conveyor belt as per schedule of work of FRM.One Job each machine [Schedule of work annexed as Ann-O]

3

45128

135386.46

... More
Dismantling & fixing of MAIN conveyor belt and Transfer conveyor (if provided on machine) by providing lateral support BIG link plates complete as per schedule of work. One Job each machine [Schedule of work annexed as Ann-P]

4

167072

668289.6

... More
Repairing of different drive shaft of FRM by cutting/surface preparation/providing new sprockets over both ends as per schedule of work [Schedule of work annexed as Ann-Q]

24

15229

365517.12

... More
Dismantling, assembly and fixing of rollers, support ring and fixing of scud plate by re-drilling and threading on waste conveyor as per schedule of work. [Schedule of work annexed as Ann-R]

8

22115

176925.84

... More
Removing & providing new rubber over belt drive drum on m/c as per schedule of work on BCM/FRM. [Schedule of work annexed as Ann-S]

2

45087

90175.46

... More
Repairing of distributor chute by cutting, welding, grinding as per schedule of work of BCM and FRM [Schedule of work annexed as Ann-T]

16

16900

270407.36

... More
Dismantling , assembly and fixing of rollers , support ring and fixing of scud plate by re-drilling and threading on distributor conveyors as per schedule of work (2 jobs each machine) [Schedule of work annexed as Ann-U]

16

22583

361336.48

... More
Cutting, surface preparation, fabrication by providing MS sheet, angles chequer plate for machines stairs/ladder as per schedule of work. [Schedule of work annexed as Ann-V]

4

3540

14161.16

... More
Repairing of central plough by cutting, removing, grinding, Providing and fixing of wear strip in BCM as per schedule of work. [Schedule of work annexed as Ann-W]

4

37036

148145.96

... More
Repairing by dismantling, cutting, grinding, surface preparation, providing and fixing of wear strip and repairing of cutting chain frame for run way of excavating chain in FRM as per schedule of work. 4 job in one machine. [Schedule of work annexed as Ann-X]

16

26812

428994.4

... More
Repairing of duct unit as under by attending Original base floor bottom of LHS & RHS cutter unit damaged portion size 2910x400x8 mm and welding new plates in shape and size as per schedule(one side duct unit will be treated as one job) [Schedule of work annexed as Ann-Y]

8

9057

72459.92

... More
Repairing of duct unit as under by attending Cutter unit side damaged wear strip size 2910x275x6mm= 2no. cutting by gas cutter & then grinding welding new side wall in same size and also drilling as per wear plates holes. (Both side duct repair will be treated as one job) [Schedule of work annexed as Ann-AA]

4

16102

64408.84

... More
Disassembly, assembly of cutting chain guide , arch , guide upper and lower etc by fixing all accessories as per schedule of work. (Both side unit will be counted one job) [Schedule of work annexed as Ann- AC]

4

29001

116006.72

... More
Dismantling, providing and fixing of long pin bolts, bushes and welding by aligning as per schedule of work. [Schedule of work annexed as Ann-AD] both side units shall be treated as 1 job.

4

26018

104072.04

... More
Repairing of Side plough by cutting, removing, grinding, Providing and fixing of wear strip in FRM as per schedule of work. [Schedule of work annexed as Ann-AJ]

8

18857

150861.68

... More
Repairing/replacement of measuring & front rod bush: (i) The measuring and front rod shall be 42 dismantled with proper working tools taking full precautions. (ii) Dismantled parts shall be inspected by SSE/JE TMD for its reusability. (iii) P. B. Bushes shall be replaced after machining/matching with OD of measuring & front rods to get sliding clearance. (iv) Repaired measuring and front rod assembly shall be inspected by SSE/JE TMD for its proper functioning. (v) All material including semi finished bush will be provided by Railway

10

7306

73069.1

... More
Providing & Fixing of rubber beading with lock as per sample for all glass panes for the machine 43 after removing old glass panes and beads to the nos. of glasses to be fixed are 19Nos. wth app .Length of bead 200 feet . Scope of work will cover removal of all glasses of machine after cleaning glass panes, new rubber beading shall be used for fixing the same. Rubber beading shall be used as per approved sample.

3000

23

69780

... More
Repairing of machine door of both cabin (including bearing 6201- Qty -08 nos) As per schedule of work [Schedule of work annexed as Ann-AK]

30

4367

131016.6

... More
Repairing of Tamping unit slding assembly for WST/UNI/ VPR with replacement of sliding P.B. Bush-8nos. as per schedule of work [Schedule of work annexed as Ann-AL]

2

51553

103107.26

... More
Taking out and fixing of tamping unit to and from machine as per schedule of work (each set of CSM/ DUO/UNI-3S5 consist of two bank and T. Exp/UNI-4S5 consist of four banks). [Schedule of work annexed as Ann-AM]

12

14067

168810.96

... More
Repainting of the whole machine, all type tampers and DGS with two coats of synthetic enamel burger paint golden, yellow, smoke grey black, aluminium as required on one coat of primer paint with suitable 47 puttee for smooth surface after scraping the old paints, writing work on sides, front rear in block letter in blue, black, red or any other colour as per specimen.(As per schedule of work) [Schedule of work annexed as Ann-AP] In case of Dynamic Express machines the tamper portion and the Dynamic track stabilizer portion will be traeted as 2 separate units for payment purpose.

20

97202

1944051.2

... More
Repainting of the whole machine BCM/FRM with two coats of synthetic enamel burger paint 48 golden, yellow, smoke grey black, aluminium as required on one coat of primer paint with suitable puttee for smooth surface after scraping the old paints, writing work on sides, front rear in block letter in blue, black, red or any other colour as per specimen. (As per schedule of work)[Schedule of work annexed as Ann-AQ]

4

170104

680419.2

... More
Repainting of the whole machine BRM /set of SQRS,(02 Portals per set) T-28 (02 machines per 49 set) with two coats of synthetic enamel burger paint golden, yellow, smoke grey black, aluminium as required on one coat of primer paint with suitable puttee for smooth surface after scraping the old paints, writing work on sides, front rear in block letter in blue, black, red or any other colour as per specimen. (As per schedule of work) [Schedule of work annexed as Ann-AR]

10

46662

466624.2

... More
Replacement of M.S sheet over roof on anywhere on track machine as per schedule of work.

100

148

14892

... More
Roof rubber beading as per sample make EPDM rubber. As per drawing and specification attached.

100

531

53199

... More
Providing and fixing of Curtain. The curtain cloth is to be stitched as per required size and fixed to windows/doors

800

285

228680

... More
20 mm pipe of steel/Aluminum for curtains.

200

20

4002

... More
20 mm PC brackets of steel/Aluminum for curtains.

50

18

917

... More
Providing and fixing steel tool box for machine, size 1525x 460x550 mm out of MS Steel 1.6mm 55 thick with angle supported 25x25 x4mm making provision of 8 Drawers , four Drawers with lock left side and four Drawers right side and mid-box with separate open-able size 605x460x550mm with locking arrangement and top with 3 separate 4" cushioned. 40 densities with 6mm ply sitting arrangement

10

26036

260362.1

... More
Providing and fixing of the rubber beed to the doors of width 25 mm and 1.95 mts length to the doors of track machines with all contractors' men, material, lead, lift, tool & plant etc., as per the instructions of engineer-in charge at site .

30

862

25866.6

... More
Replacement of Aluminum Jaali in both cabin as per schedule of work.

100

170

17017

... More
Supply and filling up of AC gas to air conditioner of machine as per schedule of work.

100

1720

172069

... More
Removing, cleaning and fixing of pneumatic tank to machines. Scope: The work involves removal of removal of Pneumatic tank, cleaning and re-fixing of Pneumatic tank. If the condition of existing pneumatic tank is unusable, then fixing it with new pneumatic tank supplied by Railway.

50

1004

50249.5

... More
Draining of fuel tank, cleaning of diesel tank with lint free cloth and makingof new gaskit for its cover and refilling of diesel into tank.

35

1573

55067.95

... More
Supply and fitment of seat cover of sofa cloth for working cabin, operating seat with back rest cover, head rest cover and tool box seat cover of various track machine.

100

1950

195000

... More
Broken bolts removal by drilling/welding duly clean the thread by tap.

200

650

130000

... More
Supply and fixing of half thread Hex bolt M 12x65 mm of make Unbrako LPS or own make for FRM machine

6000

15

91800

... More
Supply and fixing of Nylock nut 12 mm of make Unbrako LPS or own make for FRM machine

6000

6

37500

... More
Repairing of Buffers by Cutting , grinding , welding with providing plates and overhauling.

8

4480

35843.6

... More
Draining, cleaning and filling of Hydraulic Tank as per scope of work.

30

2524

75733.8

... More
Repair /Overhaul of machine Bogie for CSM/UNI/DUO/ DGS//3X,HOT 3X, MFI as per schedule of work.

50

21164

1058200

... More
Repairs/Overhauling of Machine Driving Bogie for BCM etc as per Schedule of work.

4

27066

108266.72

... More
Repairing of driving bogie of FRM as per schedule of work.

4

50074

200297.2

... More
Repairing of running bogie of FRM as per schedule of work.

2

33949

67899.4

... More
Dismantling & fixing cordon shafts as per schedule of work. Scope: The work involves removal of Cordon shaft, cleaning and refixing of Cordon Shaft. If the condition of existing cordon is unuseable, then fixing it with new cordon shaft supplied by Railway.

100

555

55541

... More
Supply and fixing of Retro reflective prismatic stickers (letters, numbers) on trackmachines of repeated brand (3M) approved by Engineer-incharge for clear visibility including night times and as directed by Engineer-in-charge at TMD/JHS including lead, lift, comsumables.

200

852

170516

... More
Repairing of third rail of UNI-3S machine by dismantling and assembling as per schedule of work

6

6390

38343.48

... More
Inspection/Replacement/Fitment of various Hydraulic Pumps as per schedule of work

150

1289

193437

... More
Inspection/Replacement/Fitment of various Hydraulic Motors as per schedule of work

150

727

109165.5

... More
Replacement of Hydraulic Cylinder seals as per Schedule of work. a) For track lifting cylinder, lining 77 cylinder, support cylinders, rail clamp cylinders, Hyd. brake cylinders,satellite lateral movement cylinder, screen tilting cylinders, hood cylinders, cutter bar cylinders, rope cylinders, ballast distribution cylinders,distribution conveyor in & out cylinders, extra lifting cylinders, hook in out cylinder, Unimat T/U in out cylinders, Unimat T/U radial cylinders, Unimat Lifting unit forward reverse cylinder, all DGS cylinders, etc as per Schedule of work

100

919

91930

... More
Supply of AIR UNLOADER VALVE SIZE 1/2" PL Part No:90200 TVS PT. NO. 301940 [ACCEPTABLE MAKE: PLASSER or TVS only]

20

1530

30600

... More
Fixing or replacement of various pneumatic valves at TMD JHS with all contractor's men, Tools & plants as directed by Engineer-in-charge.

20

146

2936

... More
Supply of VALVE OEM:PL Part No:90344 SUBSTITUTE SCHRADER NO.90338H/A53014TF [ACCEPTABLE MAKE: PLASSER or SCHRADER only]

40

2986

119440

... More
Fixing or replacement of various pneumatic valves at TMD JHS with all contractor's men, Tools & plants as directed by Engineer-in-charge.

40

146

5872

... More
Supply of PNEUMATIC VALVE PL Part No: G53014-TF [ACCEPTABLE MAKE: PLASSER or SCHRADER only]

30

2986

89580

... More
Fixing or replacement of various pneumatic valves at TMD JHS with all contractor's men, Tools & plants as directed by Engineer-in-charge.

30

146

4404

... More
Supply of AIR WATER SEPERATOR' SIZE 1/4" PL. PART 90181A SCHRADER PART NO.S-3334 OF301760. [ACCEPTABLE MAKE: PLASSER or SCHRADER only]

30

1676

50280

... More
Fixing of AIR WATER SEPERATOR

30

146

4404

... More
Supply of PNEUMATIC VALVE PART NO:G53024-YTF [ACCEPTABLE MAKE: PLASSER or SCHRADER only]

30

4637

139110

... More
Fixing or replacement of various pneumatic valves at TMD JHS with all contractor's men, Tools & plants as directed by Engineer-in-charge.

30

146

4404

... More
Supply of AIR OILER SIZE 1/2" PL Part No:90180 SCHRADER PART NO.S-3487 OF 250440 [ACCEPTABLE MAKE: PLASSER or SCHRADER only]

30

2184

65520

... More
Fixing of Air oiler

30

146

4404

... More
Supply of STOP COCK OEM:PL PART NO.: HY152.01-H Make: Plasser

50

2812

140600

... More
Fixing or replacement of various pneumatic valves at TMD JHS with all contractor's men, Tools & plants as directed by Engineer-in-charge.

50

146

7340

... More
Supply of PNEUMATIC CYLINDER Part No: PN1Z-G.35/12/50 [Acceptable Make: PLASSER or SCHRADER only]

20

3260

65200

... More
Replacement of Defective Pneumatic cylinders with new cylinders in all Track machines with all contractor's men, tools & Plants etc., as directed by Engineer-in-Charge.

20

232

4641.8

... More
Supply of PNEUMATIC CYLINDER Part No: PN2Z-G.35/12/50 [Acceptable Make: PLASSER or SCHRADER only]

20

2820

56400

... More
Replacement of Defective Pneumatic cylinders with new cylinders in all Track machines with all contractor's men, tools & Plants etc., as directed by Engineer-in-Charge.

20

232

4641.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.