North Central Railway Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
North Central Railway - NCR Tender
Electrical Goods and Equipments
Machinery and Tools
Ireps
Opening Date13 Jan 2025
Closing Date12 Feb 2025
Tender Amount₹ 20,00,00,000 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 20,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Smps Based Ips
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
50235555B-STORES/NORTH CENTRAL RLYTender No
50235555BTender Authority
North Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
PL Code : 5690N001 Supply installation Testing and commissioning of SMPS based Integrated power supply (IPS) s
ystem, as per RDSO spec. No. RDSO/SPN/165/2023 (ver.4.0) amendment 1.0 along with surge protection d
evice, Status monitoring panel, spares, tool kit, LMLA Battery consisting of 55 plus 5 cells ( cells as per RDS
O spec. IRS:S-88/2004 ) along with battery stand. The configuration of IPS should be as per NCR/ HQ Drawi
ng No. TYP/2017/0002-06 for EI station up to 04 lines with block panel and LC gate. This includes transport
ation to consignee depot from consignee depot to site , installation and commissioning of Integrated power
supply system after duly filing pre commissioning check list jointly by RDSO approved vendor and Railway r
epresentative. [ Warranty Period: 48 Months after the date of delivery ] ]
SSE/SIG/C/ALD, NCR Uttar Pradesh 4.00 Numbers
Consignee SSE/SIG/Const/MTJ, NCR Uttar Pradesh 23.00 Numbers
SSE/SIG/RRI/GMC, NCR Uttar Pradesh 30.00 Numbers
UVAM Item ref. ( Item Id :- 3100065 - SMPS Based Integrated Power Supply (IPS) , Sub Item
Id:-3100065001 - SMPS Based Integrated Power Supply (IPS) )
-
-
-
... More
PL Code : 5690N002 Supply, Installation Testing and Commissioning of SMPS based Integrated power supply syste
m (IPS ), as per RDSO spec. No. RDSO/SPN/165/2023 (ver.4.0) amendment 1.0 along with surge protection
device, status monitoring panel, spares, tool kit, LMLA Battery consisting of 55 plus 5 cells ( cell as per RDS
O spec. IRS-S-88/2004) along with battery stand. The configuration of IPS Should be as per NCR/HQ drawin
g No. TYP/2017/0002-08 for EI station up to 6 lines with Block panel and LC gate. This include transportatio
n to consignee depot to site ,installation and commissioning of Integrated Power Supply system after duly fi
lling Pre commissioning checklist jointly by RDSO approved vendor and Railway representative. [ Warrant
y Period: 48 Months after the date of delivery ] ]
10.00 NumbersConsigneeSSE/SIG/C/ALD, NCR Uttar Pradesh
SSE/SIG/Const/MTJ, NCR Uttar Pradesh 2.00 Numbers
UVAM Item ref. ( Item Id :- 3100065 - SMPS Based Integrated Power Supply (IPS) , Sub Item
Id:-3100065001 - SMPS Based Integrated Power Supply (IPS) )
Inspection Details Product Inspection:Stage 1: Inspection of Batteries. (100% of PO Qty )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%