New Okhla Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
New Okhla Industrial Development Authority Tender
Civil And Construction
Road Construction
Eprocure
Opening Date28 Jan 2025
Closing Date10 Feb 2025
Tender Amount₹ 5,97,36,860
Costs
EMD
₹ 11,95,000Document Cost
₹ 5,310Tender Fee
Refer Documents
Summary
Strengthening Of Road (p/l Dbm Bc And Road Widening From Harola Chowk To Sector-56 T-point On 24.00 Mtr. Wide Road On Zonal Road No.-3), Noida
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_NOIDA_999092_1Tender No
40/DGM/SM/WC-I/2024-25Tender Authority
New Okhla Industrial Development Authority ViewPurchaser Address
-Website
http://https://www.noidaauthorityonline.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. The contractor has to defect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge.
5140
144
744940.2
... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
62
923
57252.04
... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
2686
120
323797.3
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
56206
82
4654418.86
... More
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/ cum.Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level
1383
7912
10942738.56
... More
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
2837
335
951955.35
... More
Providing wall putty on new surface with approved quality material of berger/JK/Birla of similar make 2 coats.
4965
63
312795
... More
Painting with synthetic enamel paint of approved brand and ... Two or more coats on new work
4965
77
384539.25
... More
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres.
13850
82
1140963
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front and loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per Clause 401.
1834
4093
7507479
... More
Providing, Laying, Spreading and compacting graded stone aggregate to wet mix macadam specification including premixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver ir/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
928
4458
4137024
... More
Providing and applying tack coat with bitumen pressure distributor at the rates of 0.50 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
45765
32
1475921.25
... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site , laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled , vibratory and tandem rollers to achieve the dsired compaction as per MORTH specification clause No. 505 complete in all respects.
504
10237
5159599.2
... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level adn alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
1667
11438
19068479.6
... More
Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineerin- charge. (Old CC paver blocks shall be supplied by the department free of cost).
6212
241
1502993.4