New Okhla Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

New Okhla Industrial Development Authority Tender

Works
Civil And Construction
Eprocure
Opening Date25 Oct 2021
Closing Date1 Nov 2021
Tender Amount₹ 1,54,16,259 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in Truck will be reduced by 20% for payment).

228

-

368.2

... More
Cleaning and Sweeping of Lawn / Garden area /Toilet area and keep it neat and clean by mechanized method / manually, remove litter,debries, picking of leaves, papers, plastic bottles etc. including disposal of collected waste in dustbin / designated place, as per direction of officer -in- charge (All T & P, materials / articles shall be provided by the contractor.) (7713.00 x 24 Month)

185112

-

2.61

... More
Tractor With Trolly Including P.O.L & Driver 05 Nos x 24 Month

120

-

1600

... More
Providing & Planting of seasonal seedlings in parks including Supply of seasonal seeldlings , labour , watering etc. Complete as per officer incharge

48000

-

2.56

... More
B Part Green Belt

-

-

-

... More
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliages, creepers etc. including hoeing, weeding, pruning, replacement of plants, gap filling, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the Department & Cost /Supply lawn mover and brush cutter with fuel and other T & P material/articles shall be provided by the contractor.) and as per direction of officer in charge. (10.59 x 24 Month)

254.16

-

11885.6

... More
Providing profuse watering arrangements at site to Make available RH pipe/Canvas Pipe & T&P Repairing of Submersible Pumps, DG. Set etc. in the process of watering as per direction of the in charge of work.Avarage 03 Nos Irrigation per month/acre total irrigation=36 Nos (Maintenance of Park/Master Green ) (10.59 x 24 Month)

254.16

-

6399

... More
Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 05 k.m.lead complete (Cattle manure measured in Truck will reduced by 8% for Payment).

254

-

221.25

... More
Tractor with trolley including P.O.L & Driver (5 x 24 Month)

120

-

1600

... More
C Part RSP

-

-

-

... More
Complete maintenance of shrubs (outside garden features), jobs like making of basin at regular interval,application of fertilizer, manure & spray of insectcide etc, (excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge(RSP) Cost of 1200 Nos. Shrub (5200 x 24 Month)

124800

-

8.56

... More
Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 05 k.m.lead complete (Cattle manure measured in Truck will reduced by 8% for Payment).

312

-

221.25

... More
Providing and wartering of plants through water tanker of Horticulture features i.e. tree, shrubs, hedge/edge, ground cover, Road Side Plantation ,Centrell Verge etc. at the site of work. Water tanker having 5000 lit. capacitywith one labour for watering i/c cost of water, filling of tanker, wartering at site with all leads and lifts as per direction of officer-in-charge.

748

-

537

... More
Tractor with trolley including P.O.L & Driver (5 x 24 Month)

120

-

1600

... More
D Part CIVIL

-

-

-

... More
M-150 Brick work in 1:4 one cement and 4 Coarse sand 2.20 F.M. mortar in in superstructure including necessary cutting & moulding of brick as required thickness of walls of 1 brick thick. (SOR-20, I.No.-310/P-19)

27.36

-

5230

... More
Reinforced cement concrete work with cement approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools &plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SOR-20, I.No.-283/P-17)

7.73

-

7800

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars

597.24

-

89.8

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers

53

-

426.85

... More
Washed stone grit plaster on exterior walls of height upto 10 m. above level in two layers, under layer 12 mm cement plaster 1:4 (1 Cement : 4 C. Sand) furrowing the under layer with scratching tool, applying cement sullary on the under layer @ 2 Kg of cement per square meter, top layer 15 mm cement plaster 1:½:2 (1 Cement : ½ C. Sand : 2 stone chipping 10 mm nominal size) in pannels with groove alround as per approved pattern i/c scrubbing and washing, the top layer with brushes and water to expose the stone chipping, complete as per specification and direction of Engineer-in-charge (Payment for Providing grooves shall be made separately)

216.97

-

556.39

... More
Forming groove of uniform size in the top layer of washed stone grit plaster as per approved pattern using wooden battens, nailed to the under layer, including removal of wooden battens, repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge : 15 mm wide and 15 mm deep groove.

321.68

-

33.01

... More
Steel work welded in built up sections/framed work i/c hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

4567.88

-

73.5

... More
Providing & fixing precast M-25 grade cement concrete railing (factory made) using the latest vibro compaction technique accurately and providing appropriate reinforcement with circular spacers etc. complete as per direction of Engineer incharge (Cement concrete for fixing of railing to be paid separately). AOR

315

-

888.32

... More
12 mm cement plaster of mix 1:4 (1 Cement : 4 C. Sand).

249.55

-

179.22

... More
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)

249.55

-

117.85

... More
Excavation in foundation in ordinary soil (Loam, Clayor Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. (SOR-20, I.No.-251/P-23)

57.86

-

95

... More
Concrete with 4 Cm gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20, I.No. 275, P-17)

62.91

-

3580

... More
M-150 Brick work in 1:4 one cement and 4 Coarse sand 2.20 F.M. mortar in foundation and plinth including supply of all materials, labour and T & P etc. requried for proper completion of the work. (SOR-20, I.No.-305a/P-19)

24.95

-

4950

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to thr required line and cuvature jointed with cement mortar 1 : 3 (1 Cement : 3 C. Sand) i/c making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm) i/c making drainage opening wherever required complete etc. as per direction of E/I (length of finished kerb eddeging shall be measured for pament). (Precast C. C. kerb stone shall be approved by Engineer-in-charge).

16.27

-

6920.96

... More
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. : Red sand stone.

361.62

-

733.91

... More
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete, on 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Dark shade using ordinary cement.

159.58

-

695.48

... More
Cement concrete with 4 Cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20, I.No. 279a, P-17)

2.71

-

7000

... More
Painting with synthetic enamel paint of approved brand and manufacture of required color to give an even shade, one or more coats on old work

567.24

-

50.72

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work

413.48

-

77.45

... More
Total

1

-

1

... More
GST 12 %

1

-

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.