New Okhla Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
New Okhla Industrial Development Authority Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date4 Dec 2024
Closing Date16 Dec 2024
Tender Amount₹ 95,33,715
Costs
EMD
₹ 1,91,000Document Cost
₹ 2,832Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NOIDA_980141_1Bid Award Id
ViewTender No
18/DGM/SM/WC-7/ET/2024-25Tender Authority
New Okhla Industrial Development Authority ViewPurchaser Address
-Website
http://https://www.noidaauthorityonline.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying C.C. parement of mix M 25with ready mixed concrete from batching plant .the ready mixed concrete shall be laid and finished with screed board vibrator vacuum dewatering process and finally finished , vacuum dewatering procees and finally finished by floating brooming with wire brush etc. complete as per specifications and directions of engineer-in-charge ( the panel shuttering work shall work shaal be paid for separately (note:- cement content considered in this item is @ 330 kg/cum.Excees/less cement used as per design mix is payable /recoverable saperately. ready desige mix is payable / recoverblre seperateiy).
543
8141
4421024.55
... More
P/F Plain non-asbestos cement sheet strip in joints pavements/terrazo flooring 100mm wide and 6mm thick (based on item no 11.13.1/P-639/DAR-2016 Vol-1).
1828
50
92862.4
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
7260
92
670388.4
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand).
207
5214
1079463.6
... More
12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand)
1062
176
187729.74
... More
Neat cement punning
1062
39
41556.06
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 4.1.3 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)(4.1.3).
30
6753
202603.5
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibrator roller to achieve the desired density, complete as per clause 401
74
4093
302919
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m, as directed by engineer-in-charge. The Contractor has defect different utilities like sewer line, water supply line, electric cable, telephone cable , gas pipe line etc, using utility decteting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-charge.
180
136
24480
... More
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres.
360
82
29656.8
Evaluation Notes How It Works ?