New Okhla Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
New Okhla Industrial Development Authority Tender
Civil And Construction
Eprocure
Opening Date29 Nov 2021
Closing Date29 Nov 2021
Tender Amount₹ 1,50,76,492
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,310Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NOIDA_643158_1Bid Award Id
ViewTender No
38/D(H)/DD(H)-I/2021-2022Tender Authority
New Okhla Industrial Development Authority ViewPurchaser Address
-Website
http://https://www.noidaauthorityonline.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing profuse watering arrangements at site to Make available RH pipe/Canvas Pipe & T&P Repairing of Submersible Pumps, DG. Set etc. in the process of watering as per direction of the in charge of work.Avarage 03 Nos Irrigation per month/acre total irrigation=36 Nos
16.14 x 24 = 387.36
-
-
6399
... More
Cleaning and Sweeping of Lawn / Garden area /Toilet area and keep it neat and clean by mechanized method / manually, remove litter,debries, picking of leaves, papers, plastic bottles etc. including disposal of collected waste in dustbin / designated place, as per direction of officer -in- charge
(All T & P, materials / articles shall be provided by the contractor.)
65318.58/5 x 24= 313529.18
-
-
2.61
... More
Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/edge bed watering, manureing and applying insecticides and fungicides etc.(excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge.
3200 x 24 = 76800
-
-
9.5
... More
Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 15 k.m.lead complete (Cattle manure measured in Truck will reduced by 8% for Payment).
-
-
221.25
... More
Supplying and stacking of good earth at site including royalty and carriage upto 15 km lead complete (earth measured in Truck will be reduced by 20% for payment).
-
-
368.2
... More
Providing & Planting of seasonal seedlings in parks including Supply of seasonal seeldlings , labour , watering etc. Complete as per officer incharge
-
-
2.56
... More
Tractor with trolley including P.O.L. & Driver
-
-
1600
... More
Cleaning Jungles including uprooting of rank vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of rubbish upto distance of 50 meters out side the periphery of area cleared. (Grass Only) For Sharivan
190000 x 4 time x 2 year= 1520000
-
-
1.5
... More
Part -B, Civil
-
-
-
... More
M-150 Brick work in 1:4 one cement and 4 Coarse sand 2.20 F.M. mortar in in superstructure including necessary cutting & moulding of brick as required thickness of walls of 1 brick thick. (SOR-20, I.No.-310/P-19)
-
-
5230
... More
Reinforced cement concrete work with cement approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools &plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SOR-20, I.No.-283/P-17)
-
-
7800
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars (AOR)
-
-
89.8
... More
Washed stone grit plaster on exterior walls of height upto 10 m. above level in two layers, under layer 12 mm cement plaster 1:4 (1 Cement : 4 C. Sand) furrowing the under layer with scratching tool, applying cement sullary on the under layer @ 2 Kg of cement per square meter, top layer 15 mm cement plaster 1:½:2 (1 Cement : ½ C. Sand : 2 stone chipping 10 mm nominal size) in pannels with groove alround as per approved pattern i/c scrubbing and washing, the top layer with brushes and water to expose the stone chipping, complete as per specification and direction of Engineer-in-charge (Payment for Providing grooves shall be made separately). (AOR)
-
-
556.39
... More
Forming groove of uniform size in the top layer of washed stone grit plaster as per approved pattern using wooden battens, nailed to the under layer, including removal of wooden battens, repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge : 15 mm wide and 15 mm deep groove. (AOR)
-
-
33.01
... More
Steel work welded in built up sections/framed work i/c hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (AOR)
-
-
91.98
... More
Providing & fixing precast M-25 grade cement concrete railing (factory made) using the latest vibro compaction technique accurately and providing appropriate reinforcement with circular spacers etc. complete as per direction of Engineer incharge (Cement concrete for fixing of railing to be paid separately). AOR
-
-
888.32
... More
Cement Concrete with 2 Cm guage approved stone ballast, corse sand and cement in the proportion of 4:2:1 i/c supply of all materials, labours, Tools & Plants etc. required for proper completion of the work. SOR- 279A/P-17
-
-
7000
... More
12 mm cement plaster of mix 1:4 (1 Cement : 4 C. Sand).(AOR)
-
-
179.22
... More
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (AOR)
-
-
117.85
... More
Excavation in foundation in ordinary soil (Loam, Clayor Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. (SOR-20, I.No.-251/P-23)
-
-
95
... More
Concrete with 4 Cm gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20, I.No. 275, P-17)
-
-
3580
... More
M-150 Brick work in 1:4 one cement and 4 Coarse sand 2.20 F.M. mortar in foundation and plinth including supply of all materials, labour and T & P etc. requried for proper completion of the work. (SOR-20, I.No.-305a/P-19)
-
-
4950
... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to thr required line and cuvature jointed with cement mortar 1 : 3 (1 Cement : 3 C. Sand) i/c making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm) i/c making drainage opening wherever required complete etc. as per direction of E/I (length of finished kerb eddeging shall be measured for pament). (Precast C. C. kerb stone shall be approved by Engineer-in-charge). (AOR)
-
-
6920.96
... More
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. : Red sand stone. (AOR)
-
-
733.91
... More
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete, on 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Dark shade using ordinary cement. (AOR)
-
-
695.48
... More
Cement concrete with 2 Cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20, I.No. 279a, P-17)
-
-
7000
... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work. (AOR)
-
-
77.45
... More
12% GST
-
-
1615338.44
Evaluation Notes How It Works ?