If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Muzaffarnagar Development Authority Tender
Civil And Construction
Eprocure
Opening Date27 Oct 2020
Closing Date21 Nov 2020
Tender Amount₹ 5,97,000
Costs
EMD
₹ 60,000Document Cost
₹ 778Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_UPMDA_525334_8Bid Award Id
ViewTender No
3468/MDA/CD/2020 Dt. 23-10-2020 SBTender Authority
Muzaffarnagar Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
M-150 Brick Work in 1:4 one cement and four fine sand of 1.25 FM mortar in foundation and plinth including supply of all materials, labour , T&P etc. required for proper completion of the work. SI No. 305
46
-
3800
Cement Concrete with 2 cm gauge stone grit, approved coarse sand, cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. SI No. 279(a)
3
-
5050
12mm thick plaster with cement and fine sand mortar in 1:4 over brick work minimum thickness not to be less than 1cm including supply of all materials, labour, T&P etc. required for proper completion of the work.[S.I.no. 584].
81
-
140
Conrete with 4cm guage brick ballast, Fine sand of 1.25 FM and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work (SI No. 273)
14
-
2600
M.S.or iron work in MS Grills/ Stair case railings/ gates/ racks etc. wrought to required form i/c supply of steel bolts, nuts, wastage etc & their fixing required for proper completion of the work. [SI No.502(A)]
57
-
59.5
Painting or varnishing work in small areas or new wood work with one coat(upto one squre metre) of ready mixed paint and two coats of approved superior quality paint or Varnish including supply of all Materials,labour,tools & plants etc. required for proper completion of the work.Paint to be used should confirm the ISI no.103-1950. [SI No.641+642]
2
-
82
Construction of granular sub-base (GSB) by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheeled roller to achieve the desired density, complete as per clause 401
15
-
2357
Supply and Laying of 80mm thick coloured ISI marked I shaped mechanically compressed interlocking cement concrete paver blocks with top layer of minimum 5mm thickness O.P.cement having plan dimension 200x(160+120mm) , smooth high gloss finish, skid resistant manufactured from rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver blocks shall not be less than 40Mpa and weight 4.5 kg per no. confirming to IS:15658-2006 including cost of all materials, labour, T&P etc., laying with a blanket layer of 4.00 cm thick fine sand including leveling and dressing surface up to required level and slope filling joints with fine sand including all required for proper completion of the work as directed by the Engineer-in- charge.
148
-
740
Finishing wall with water proof cement paint of approved make & quality on new wood with two coats to given an even shade including supply of all material, labour, tools and plant etc. required for completion of the work. [SI No.660]
81
-
48
HORTICULURE WORK
-
-
-
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure of sludge in the ratio of 2:1 by volume (2parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) Flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge of extra good earth if needed to be paid for separrately) holes 60cm dia, and 60cm deep. & 45cm dia, and 45cm deep (DSR-Hort/2018/2.14.12)
60
-
9
Supply and stacking at site different varienty flowering and ormamental plants an polythene bag well developed multi branched plants including royalty and carriage.
72
-
80
A- Ashok pandula (DSR-Hort/2018/7.76)
72
-
180
B- Ficus benjamina green (DSR-Hort/2018/7.27)
16
-
400
C- washington (DSR-Hort/2018/7.89)
-
-
-
Supply and stacking at site dump manure from badli or others approved source, including carraige upto 1km (manure measure in stack will be reduced by 8% for payment) (Based on DSR-Hort/2018/2.4.2)
9
-
219.9
Maintinance of plants by providing malies including watering weeding, hohing prunning and raining antetermite treatment removal of grass water and word etc. as direction of incharge of work i/c all T&P for 12 month. (Based on DSR-Hort/2018/2.42.3)
160
-
98.2