Muzaffarnagar Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Muzaffarnagar Development Authority Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date3 Sep 2024
Closing Date12 Sep 2024
Tender Amount₹ 1,95,33,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of un-reinforced dowel jointed at expansion and construction joint only, plain Cement Concrete pavement, thickness as per design, over prepared sub base with 43 grade cement and any other type as per clause 1501.2.2 (1:1.5:3) coarse and fine aggregates confirming to IS: 383 maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weight batcher using approved mixed design, laid in approved fixed side from work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the framework as per drawing) spreading the concrete with shovels. rakes compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 including cost of polythene sheet and dowel bars and also including complete shifting of materials and concrete etc. New Item - 9/road

637

4650100

7300

... More
Supply and Laying of 80mm thick ISI marked I shaped/other approved shaped mechanically compressed interlocking cement concrete paver blocks with top layer of minimum 5 mm thickness of O.P. cement having plan dimension 200x(160+120mm), smooth high gloss finish, skid resistant manufactured from rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver blocks shall not be less than 40Mpa and weight 4.5 kg per no. confirming to IS:15658-2006 including cost of all materials, labour, T&P etc., laying with a blanket layer of 4.00 cm thick local sand including leveling and dressing surface up to required level and slope filling joints with local sand i/c all required for proper completion of the work as directed by Engineer-in- charge and as per drawing & technical specification of clause 1504.

705

578100

820

... More
Cement Concrete with 2 cm gauge stone grit, approved coarse sand, cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. SI No. 279(a)

2

11500

5750

... More
(B) Construction of Drains and Culverts

-

-

-

... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 M lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches. (S.I. No. 251a)

280

25200

90

... More
Concrete with 4 cm gauge brick ballast, fine sand of 1.25 FM and cement in proportion of 12:6:1 in foundation and under floors i/c supply of all materials, labour, T&P etc. required for proper completion of the work. (SI No.273 )

93

277605

2985

... More
M-150 Brick Work in 1:4 one cement and four coarse sand mortar in foundation and plinth including supply of all materials, labour , T&P etc. required for proper completion of the work. SI No. 305(a)

202

947380

4690

... More
Cement Concrete with 2 cm gauge stone grit, approved coarse sand, cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. SI No. 279(a)

13

74750

5750

... More
12mm thick plaster with cement and coarse sand mortar in 1:4 over brick work minimum thickness not to be less than 1cm including supply of all materials, labour, T&P etc. required for proper completion of the work.[S.I.no. 584-a].

879

145035

165

... More
R.C.C Work with cement, approved coarse sand & 2cm. gauge approved stone grit in proportions of 1:1.5:3 in SLABS excluding supply of reinforcement & its bending, but i/c its fixing & binding the same with 24 B.W.G. G.I. binding wire & including necessary centering & shuttering etc. & supply of all materials, labour,Tools & plants etc. required for proper completion of the work i/c cost of binding wire.The rate excludes making of drip course which shall be paid extra.[SI.No.284(A)]

10

74000

7400

... More
M.S. (tor steel or plain) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend, hooks and authorized overlapping shall be measured and including cost of binding wire. [SI.No.504]

12

82980

6915

... More
(C) Laying of Sewer Line

-

-

-

... More
Excavation of following depth for laying of sewer line (loam, clay or sand) including dressing leveling, refilling of trench in 20cm layer watering, ramming and removal of surplus earth and other dismantle material upto a distance of 50M from the centre of trench as directed by E/I

-

-

-

... More
(a) 0.0-1.5m B.G.L

744.6

159344

214

... More
(b) 1.5-3.0m B.G.L

56.7

13948

246

... More
Providing and Fixing open timbering in both sides trenches for the following depth consisting of 40mm thick approved country wood planks for poling boards 125mm x75mm Indian sall wood waller and 100mm dia sall ballies for struts at 1.5mtr. c/c distance including removal after laying sewer line as directed by E/I.

-

-

-

... More
0.0-3.0m BGL

375

118500

316

... More
Supply of 350 mm dia pipe NP-2 all complete

-

-

-

... More
Cartage upto100Km including loading and unloading is 15% extra to SOR rates, So rate=1090.00+1090.00*15% =1253.50

584

732044

1253.5

... More
Carting and laying of following dia R.C.C. hume pipe & colors from store to the site of work, lowering them into trenches true to alignment caulking the joints with spun yarns soaked with bitumen and jointing with 1:2cement and coarse sand mortal including excavation of earth below invert level of pipe, cost of all jointing, materials, testing etc. all complete but excluding excavation & refilling of trenches from ground level to invert level of pipe as directed by E/I

-

-

-

... More
A-350mm dia NP-2

-

-

-

... More
(i) 0.0-1.5m B.G.L

500

316000

632

... More
(ii)1.5-3.0m B.G.L

84

56532

673

... More
Concrete with 4 cm gauge brick ballast, fine sand of 1.25 FM and cement in proportion of 10:5:1 in foundation and under floors including supply of all materials, labour, T&P etc. required for proper completion of the work. (SI No.274 )

74.46

233804

3140

... More
Construction of brick masonary Manhole of internal size ( 1.00mx1.20mx3.00m) including supply of all material, labour, T&P etc. Complete in all respect as per direction of Engg in-charge.

30

1128570

37619

... More
Addition/Substaction in brick masonary Manhole internal size (1.00mx1.20mx3.00m) for Regulating shaft.

36

-278172

7727

... More
Construction of brick masonary Chamber of internal size 0.60mx0.60mx1.50m including supply of all material, labour, T&P etc. Complete in all respect as per direction of Engg in-charge.

12

244764

20397

... More
Addition/Substaction in brick masonary Chamber internal size (0.60mx0.60mx1.50m) for Regulating shaft.

14.4

-71553

4969

... More
(D)Construction of Septik Tank-Soak Pit

-

-

-

... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 M lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 M from the foundation trenches. (S.I. No. 251a)

123.56

11120

90

... More
Concrete with 4 cm gauge stone ballast, coarse sand and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials, labour, T&P etc. required for proper completion of the work. (SI No.273 )

9.86

47806

4850

... More
M-150 Brick Work in 1:4 one cement and four coarse sand mortar in foundation and plinth including supply of all materials, labour, T&P etc. required for proper completion of the work. SI No. 305(a)

24.26

113797

4690

... More
20mm thick plaster in 1:2 consisting of one part of cement and two part of approved coarse sand laid in panels finished with 3mm floating coat of neat cement or cement mixed with marble dust in ratio 5:1 including supply of all material, labour tools & plants etc. required for proper completion of the work. SI No.597

62.8

14444

230

... More
Cement Concrete with 2 cm gauge stone grit, approved coarse sand, cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. SI No. 279(a)

4.2

24150

5750

... More
R.C.C Work with cement, approved coarse sand & 2cm. gauge approved stone grit in proportions of 1:1.5:3 in SLABS excluding supply of reinforcement & its bending, but i/c its fixing & binding the same with 24 B.W.G. G.I. binding wire & including necessary centering & shuttering etc. & supply of all materials, labour,Tools & plants etc. required for proper completion of the work i/c cost of binding wire.The rate excludes making of drip course which shall be paid extra.[SI.No.284(A)]

12.33

91219

7400

... More
R.C.C Work with cement, approved coarse sand & 2cm. gauge approved stone grit in proportions of 1:1.5:3 in LIGHTER BEAM excluding supply of reinforcement & its bending, but i/c its fixing & binding the same with 24 B.W.G. G.I. binding wire & including necessary centering & shuttering etc. & supply of all materials, labour,Tools & plants etc. required for proper completion of the work i/c cost of binding wire.The rate excludes making of drip course which shall be paid extra.[SI.No.285+(284a-284)]

1

7700

7700

... More
M.S. (tor steel or plain) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend, hooks and authorized overlapping shall be measured and including cost of binding wire. [SI.No.504]

16

110640

6915

... More
Additional Cost for the acessories as pipes for inlet/ out let, vent pipe cowel and foot steps etc.

1

50000

50000

... More
(E) Laying of Water Supply Distrubution Line

-

-

-

... More
Excavation of earth in ordinary soil (loam, clay or sand) to give 1 mt. Cover from top of the pipe including lift upto 1.5 mt. and lead upto 50 mt. from center of trenches and refilling of earth in 20 cm. layers with watering and ramming etc. complete.

292

55480

190

... More
Supply and laying of following sizes pipes for distribution system conforming to latest/ relevant I.S. Specifications with all jointing materials and specials conforming to latest /relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete as per instructions of Engineer -in -charge.

-

-

-

... More
110 mm dia HDPE Pipe PE-100 PN-6

434

140182

323

... More
140 mm dia HDPE Pipe PE-100 PN-6

100

47100

471

... More
160 mm dia HDPE Pipe PE-100 PN-6

50

30900

618

... More
Making of ferrule/FCV connection in all sizes of pipeline with saddle piece, service connections, fittings, and fixing of brass ferrule of 15 mm size/FCV including tapping the main and cost of bailing out of water. The above work includes necessary dismantling and reinstatement of CC/Bitumenous/BOE/CC Tile/Kuchcha road, excavation including stacking of servicable material and disposal of unservicable material within municipal /village habitation limits as per direction of E/I. It also includes supply, carting, laying & jointing/fitting of necessary length of PE-80, PN-12.50 20mm dia OD MDPE pipe and G.I. Pipe medium quality upto 10 m length, HDPE/G.I. specials & fittings as required to complete the work (for PVC/HDPE/ DI/AC dia of existing pipe ) 1 No. HDPE adapter and 1 No. tap/stop cock 15 mm dia with 1 no. G.I. union along with all labour, T&P etc. required for proper completion of work. The work also includes supply, filling, collection and submission of all necessary documents required for FHTC work.

-

-

-

... More
a)Size of pipe line 63 mm to 110 mm

224

744800

3325

... More
Supply and fixing of 110mm dia CI Sluice valve complete in all respect. (DSR-18.31.1.1)

2

8195

4097.9

... More
Supply and fixing of 110mm dia CI Air valve complete in all respect.(DSR-18.59.3)

2

16428

8214.1

... More
Constructing masonary chamber 90x 90x100cm complete in all respect. (DSR-18.34.1)

4

47140

11785

... More
(F) Construction of Boundary Wall

-

-

-

... More
Excavation in foundation in ordinary soil (loam,clay or sand) including lift upto 1.50 and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30M from the foundation trenches. SI No.251(a)

658

59220

90

... More
Conrete with 4cm guage brick ballast, Fine sand of 1.25 FM and cement in 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work (SI No. 275)

80

265200

3315

... More
RCC work with cement, approved coarse sand, 2cm gauge approved stone grit in proportion of 1:1.5:3 for raft and footings excluding supply of reinforcement and its bending, but i/c its fixing and binding the same with 24 BWG GI binding wire and including necessary centering and shuttering etc. & i/c supply of all materials, labour, T&P etc. required for proper completion of work including cost of binding wire. Rate excludes making of drip course which shall be paid extra. SI No.289

66

416460

6310

... More
RCC work with cement, approved coarse sand, 2cm gauge approved stone grit in proportion of 1:1.5:3 for columns and T-beam excluding supply of reinforcement and its bending, but i/c its fixing and binding the same with 24 BWG GI binding wire and including necessary centering and shuttering etc. & i/c supply of all materials, labour, T&P etc. required for proper completion of work including cost of binding wire. Rate excludes making of drip course which shall be paid extra. SI No.289

61

475800

7800

... More
RCC work with cement, approved Coarse sand and 20mm stone grit in proportion of 1:1.5:3 in lighter beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost of binding wire. SI No.285+[284(a)-284] So Rate= 7200 + (7400-6900) = 7700

36

277200

7700

... More
M.S.(Tor steel or plain) in plain work such as RCC or RB work including bending for proper shape and inclding supply of steel and its wastage, bend, hooks and authorized overlapping shall be measured and including cost of binding wire . (S.I No. 504)

128

885120

6915

... More
M-150 class brick work in 1:6 cement and fine sand of 1.25 FM mortar in foundation and plinth including supply of all material labour, tools and plants etc. required for proper completion of the work. SI No. 303

210

858900

4090

... More
M-150 class brick work in 1:6 cement and fine sand of 1.25 FM mortar in super structure including supply of all material labour, T&P etc. required for proper completion of the work. SI No. 303+309+310

216

978480

4530

... More
Cement Concrete with 2 cm gauge stone grit, approved coarse sand, cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. SI No. 279a

7

40250

5750

... More
12 mm thick plaster with cement and coarse sand 1:4 over brick with minimum thickness not to be less than 1 cm including supply of all materials, labour, tools and plants etc. required for proper completion of the work. SI No. 584a

2625

433125

165

... More
Add for extra labour and materials for plaster over rough face of one brick wall. SI No. 596

1250

25000

20

... More
Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. (S.I No. 660+661)

2769

229827

83

... More
M.S or iron work in heavy size such as tursses, built up gates, record racks, gates etc, including rivetting or welding where necessary, positioning or wrought to required form and position including supply of steel and its wastage including cost of bolts, nuts it required for and welding, grinding and making holes as required for completion of the work. SI No. 503

3

18450

6150

... More
Painting or varnishing work in small areas or new wood/steel work with one coat (up to one square meter) ready mixed priming paint and one coat or approved superior quality ready mixed paint or varnish including supply of all materials, labour, tools and plants etc. required for proper completion of the work. Paint to be used ISI marked. SI No. 641+642

10

1040

104

... More
(G) Construction of Parks Wall

-

-

-

... More
Excavation in foundation in ordinary soil (loam,clay or sand) including lift upto 1.50 and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30M from the foundation trenches. SI No.251(a)

120

10800

90

... More
Conrete with 4cm guage brick ballast, Fine sand of 1.25 FM and cement 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work (SI No. 275)

20

66300

3315

... More
RCC work with cement, approved Coarse sand and 20mm stone grit in proportion of 1:1.5:3 in lighter beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost of binding wire. SI No.285+[284(a)-284] So Rate= 7200 + (7400-6900) = 7700

10

77000

7700

... More
M.S.(Tor steel or plain) in plain work such as RCC or RB work including bending for proper shape and inclding supply of steel and its wastage, bend, hooks and authorized overlapping shall be measured and including cost of binding wire . (S.I No. 504)

8

55320

6915

... More
M-150 class brick work in 1:6 cement and fine sand of 1.25 FM mortar in foundation and plinth including supply of all material labour, tools and plants etc. required for proper completion of the work. SI No. 303

70

286300

4090

... More
M-150 class brick work in 1:6 cement and fine sand of 1.25 FM mortar in super structure including supply of all material labour, T&P etc. required for proper completion of the work. SI No. 303+309+310

73

330690

4530

... More
Cement Concrete with 2 cm gauge stone grit, approved coarse sand, cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. SI No. 279a

2

11500

5750

... More
12 mm thick plaster with cement and coarse sand 1:4 over brick with minimum thickness not to be less than 1 cm including supply of all materials, labour, tools and plants etc. required for proper completion of the work. SI No. 584a

717

118305

165

... More
Add for extra labour & materials for plaster over rough face of one brick wall. SI No. 596

359

7180

20

... More
Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. (S.I No. 660+661)

717

59511

83

... More
M.S or iron work in MS grills/ staircase railings/ tursses/gates/ racks etc. including rivetting or welding where necessary, positioning or wrought to required form and position including supply of steel and its wastage including cost of bolts, nuts it required for and welding, grinding and making holes as required for completion of the work. SI No. 50A

4300

264450

61.5

... More
Painting or varnishing work in small areas or new wood/steel work with one coat (up to one square meter) ready mixed priming paint and one coat or approved superior quality ready mixed paint or varnish including supply of all materials, labour, tools and plants etc. required for proper completion of the work. Paint to be used ISI marked. SI No. 641+642

222

23088

104



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.