Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 Sep 2024
Closing Date30 Sep 2024
Tender Amount₹ 1,28,40,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation in cutting & embankment in ordinary soil with manual labour/ machine and shifting of excavated soil with tractor trolly for 1.5-3.0m depth

6639.83

-

317.64

... More
Dewatering before digging the pond

4906

-

112.48

... More
Quantity of filling in earth pitching

672.75

-

90

... More
Extra for compaction of earthwork in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density).

672.75

-

20.55

... More
Construction of Inlet

-

-

-

... More
EARTHWORK IN EXCAVATION IN ORDINARY SOIL INCLUDING LIFT UPTO 2.0M. & LEAD UPTO 30Mtr. & INCLUDING FILLING, WATERING AND RAMMING OF EXCAVATED EARTH

2.34

-

252.17

... More
PROVIDING AND LAYING CEMENT CONCRETE IN 1:4:8 ( 1 CEMENT : 4 COURSE SAND : 8 40 mm. BRICK BALLAST) AND CURING COMPLETE

4.16

-

4102.4

... More
BRICK WORK IN MASONARY IN 1:4 CEMENT & COURSE SAND MORTAR

4.74

-

5237.46

... More
12 MM PLASTERING ON BRICK WORK WITH CEMENT MORTAR IN 1:4 CEMENT AND COURSE SAND

25.82

-

169.15

... More
RCC Hume Pipe NP3 SS 900mm

5

-

4000

... More
Construction of Outlet

-

-

-

... More
EARTHWORK IN EXCAVATION IN ORDINARY SOIL INCLUDING LIFT UPTO 2.0M. & LEAD UPTO 30Mtr. & INCLUDING FILLING, WATERING AND RAMMING OF EXCAVATED EARTH

30

-

252.17

... More
PROVIDING AND LAYING CEMENT CONCRETE IN 1:4:8 ( 1 CEMENT : 4 COURSE SAND : 8 40 mm. BRICK BALLAST) AND CURING COMPLETE

7.58

-

4102.4

... More
BRICK WORK IN MASONARY IN 1:4 CEMENT & COURSE SAND MORTAR

11.31

-

5237.46

... More
12 MM PLASTERING ON BRICK WORK WITH CEMENT MORTAR IN 1:4 CEMENT AND COURSE SAND

11.58

-

169.15

... More
RCC Hume Pipe NP3 SS 900mm

10

-

4000

... More
Construction of earthen bund

-

-

-

... More
Construction of Earthen Bund to separate merged Pond by using earthen begs including supply of earth, filling begs, all labor and T&P for proper completion of the work.

1510

-

500

... More
Treatment Process (Bio cum Phyto remediation)

-

-

-

... More
RCC Channel 2.0 x 1.20 m for Phyto Remediation

-

-

-

... More
Excavation in foundation in ordinary soil (loam, clay and sand) including lift up to 1.5 m & lead upto 50 m refilling, watering and ramming of excavated earth into trenches or into the space between the building and sides of foundation trenches or into the plinth and disposal of surplus earth upto a distance of 50 m from the centre of foundation trenches.

336

-

252.17

... More
Providing & laying in position cement concrete in 1:4:8 with cement, coarse sand and 40 mm graded stone aggregate in wall footing and trenches including supply of materials and labour T&P etc. complete.

67.2

-

4102.4

... More
R.C.C. work with cement, coarse sand and 20 mm gauge stone grit in proportion of 1: 1½ : 3 in slabs excluding of supply of reinforcement & its bending but including its fixing, binding wire and supply of all materials, labour T&P etc complete. supply of all materials, labour, T & P etc. required for proper completion of the work.

74.39

-

9727.44

... More
Mild steel or iron work in R.C.C. work in drain including cutting and bending of the same for proper completion of work.

43.8

-

9479

... More
Disposal of surplus earth, silt etc by mechanical transport upto 5 kms. From the site of work.

285.6

-

633.27

... More
Making of earthen bund across the existing drain for diversion of flow for carrying out repair/remodelling works.

13.13

-

1200

... More
Pumping out of water from drain to facilitate disilting, repairing and reconstruction of drain by pumps including supply of all T&P and labour etc.

15

-

5000

... More
Supply of 20-25mm size coarse aggregate

36

-

1550

... More
Supply and plantation of plants in channel

1

-

25000

... More
Construction of RCC Collection/ Stabilization Tank

-

-

-

... More
Earth work in excavation including disposal of excavated earth, lead upto 50 mt. and lift mentioned below. (3002)

-

-

-

... More
(a) 0 -1.50 ms B.G.L.

24

-

252.17

... More
(b) 1.5 - 3.00 ms B.G.L.

24

-

317.64

... More
Providing & laying in position cement concrete in 1:4:8 with cement, coarse sand and 40 mm graded stone aggregate in wall footing and trenches including supply of materials and labour T&P etc. complete. (1017)

4.8

-

4102.4

... More
R.C.C. work with cement, coarse sand and 20 mm gauge stone grit in proportion of 1: 1½ : 3 in slabs excluding of supply of reinforcement & its bending but including its fixing, binding wire and supply of all materials, labour T&P etc complete.

15.59

-

9727.44

... More
Mild steel or iron work in R.C.C. work in drain including cutting and bending of the same for proper completion of work.

9.18

-

9479

... More
Construction of Multi Purpose Utility Room (Dosing Station/ Control Room/ Chowkidar Hut)

-

-

-

... More
Excavation in foundation in ordinary soil (loam, clay and sand) including lift up to 1.5 m & lead upto 50 m refilling, watering and ramming of excavated earth into trenches or into the space between the building and sides of foundation trenches or into the plinth and disposal of surplus earth upto a distance of 50 m from the centre of foundation trenches.

11.43

-

193.69

... More
Concrete with 40mm guage brick ballast, local sand & cement in proportion of 8:4:1 in foundation, including supply of all materials, labour, T & P etc. required for proper completion of the work.

2.53

-

4102.4

... More
Ist class brick work in 1:6 cement and local sand mortar in foundation and plinth including supply of all materials, labour, T & P etc. required for proper completion of the work.

7.51

-

5101.42

... More
R.C.C. Work with cement, coarse sand & 20 mm gauge approved stone ballast in proportion of 1:1.5:3 in plinth beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 0.50 mm thick binding wire and the cost of binding wire and including necessary centering and shuttering supply of all materials, labour, T & P etc. required for proper completion of the work.

1.14

-

9727.44

... More
M.S. or iron work in plain work such as R.C.C. work (when not included in over all rates) brought to required shape as necessary including bending for proper completion of the work including supply of steel and its wastage.

0.67

-

9479

... More
Ist class brick work in 1:6 cement & local sand mortar in super structure in plant room including supply of all materials, labour, T & P etc. required for proper completion of the work.

8.66

-

5466.29

... More
Supply and fixing of M.S. angle iron chaukhats of 40x40x5 mm with M.S. sheet door shutter simple moulding straight work as in chaukhats and ventilators and also supply of all materials, labour, T&P etc. required for proper completion of the work.

2.3

-

10363.74

... More
Fixing of hold fast of doors & window chaukhats already moulded on chaukhats and ventilator in P.C.C. 1:2:4 etc. required in all respect to complete the work

18

-

120

... More
R.C.C. Work with cement, coarse sand & 20 mm gauge approved stone ballast in proportion of 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 0.50 mm thick binding wire and the cost of binding wire and including necessary centering and shuttering supply of all materials, labour, T & P etc. required for proper completion of the work.

2.6

-

9727.44

... More
M.S. or iron work in plain work such as R.C.C. work (when not included in over all rates) brought to required shape as necessary including bending for proper completion of the work including supply of steel and its wastage.

1.53

-

9479

... More
12mm thick plaster with cement and local sand mortar 1:6 over brick work minimum thickness not to be less than 10mm including supply of all material, labour T&P etc. required for proper completion of work.

84.82

-

169.15

... More
Same as item no. 06 but in 1:4 cement sand mortar but over ceiling including supply of all material, labour T&P etc. requiredc for proper completion of work.

21.63

-

204.81

... More
25mm thick 1:2:4 P.C.C. floor with cement and coarse sand & 20mm gauge approved stone ballast laid in pannels finished with 3 mm floating coat of neat cement without base concrete including supply of all material, labour T&P etc.required fo proper completion of work.

20.05

-

377.61

... More
Painting or varnishing on new iron work in small areas or new wood work with one coat priming & one coat paint or varnish.

9.4

-

111.21

... More
White washing three coat including supply of all material, labour T&P etc. required for proper completion of work.

84.82

-

25.55

... More
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all material, labour T&P etc. required for proper completion of work.

84.82

-

130

... More
Supply & Fix 100 mm dia P.V.C. down pipes complete with rose & bend and gratings with M.S. Clamps 25 X3 mm Fixed on walls and supply of 150mm long, 6 mm dia nails complete.

3.5

-

350

... More
20mm thick cement plaster in dado or skirting in 1:2 cement and sand mortar including supply of all materials, labour, T&P etc required for proper complition of work

1.83

-

528.29

... More
Providing & Laying of 80mm thick rubber moulded interlocking tiles with base concrete

40

-

1200.19

... More
Supply & Fixing of. Bar Screen for floating waste in water

2

-

50000

... More
Construction of Temporary Check Dams.

1

-

20000

... More
Supply and fixing of Site board

1

-

10000

... More
Supply and fixing of V-Notch for flow measurement

1

-

10000

... More
Construction of Platform for PVC Tank 3.0 x 2.0 m

1

-

50000

... More
Construction of 2 HP Submersible

-

-

-

... More
Supply of 2.0 HP Submersible Pump ISI Marked or approved quality as Texmo, Crompton, CRI etc.

1

-

15000

... More
Supply of ISI marked (Crompton) Automatic starter with panel Board

1

-

5000

... More
Supply of 6m length PVC 110mm dia strainer with nylon jali, thread with 1.0m blined pipe.

6

-

500

... More
Supply & erection of automatic water level control unit.

1

-

5000

... More
Supply of 2sqmm 3 core copper cable for automatic water level control sensor connection

20

-

42

... More
Supply of ISI Marked PVC pipe 110mm dia x 6kg-f

42

-

282.24

... More
Supply of ISI Marked PVC Column Pipe 32mm dia ISI Mark

30

-

140

... More
Cartage of material & all T&P etc. require for proper completion of work including loading unloading & proper stacking

1

-

2000

... More
Boaring of 150mm dia by Palm & Pressure method

-

-

-

... More
0-30 mtr BGL

30

-

550

... More
31-50 mtr. BGL

15

-

608.67

... More
Installtion of submercible pump & jointing with panel board as per direction of E.I.C

1

-

2000

... More
Supply of 4sqmm 3 core copper submercible cable ISI Mark

50

-

60

... More
Supply of supporting wire (steel wire)

32

-

15

... More
Coarse Sand filling arround the housing pipe

1

-

1000

... More
Supply of Bentonite Powder

4

-

300

... More
Water arrangement for boring

3

-

500

... More
Supply and fixing of GI fitting, gate valve, Boring cap, clamp, Adapter etc. ISI Mark

1

-

2000

... More
Lowering of PVC pipe 110mm dia assembly into bore hole

39

-

20.78

... More
Supply of cable for electric connection ISI Mark

50

-

80

... More
Switch board with 15amp and 5amp socket ISI Mark

1

-

400

... More
Making of submersible brick masonary type Chamber with manhole cover (SIZE 0.45x 0.45 mtr.)

1

-

2000

... More
Plumbing and Other Misc. Works

-

-

-

... More
Providing and fixing of G.I. pipes complete with G.I. fitting and clamps

-

-

-

... More
25mm dia nominal bore for inlet, outlet and overflow

30

-

235

... More
15mm dia nominal bore

24

-

170

... More
PVC/HDPE Tank 1000 Ltr Capacity

2

-

10000

... More
15mm dia brass dropper

2

-

500

... More
Gate valve 15mm

4

-

300

... More
Gate valve 25mm

2

-

600

... More
Colour Painting

1

-

1000

... More
Safety lock (interlock)

2

-

500

... More
Lobour for fitting charge to inlet pipe and outlet pipe all work

1

-

5000

... More
Wiring & Electrification work with all materials and labour

1

-

10000

... More
Spray machines are using for manual spraying of the activated dosing solution in the drain water

2

-

5000

... More
Initial cleaning of drain and transport solid waste material to dumping yard

1

-

50000

... More
Supply & Erection of electronic type 0-6 LPH Capacity dosing pump

2

-

30000

... More
Supply & installation of 1 KW UPS inverter with battery for power backup & non-interrupted dosing

1

-

15000

... More
Installation of Sewage Pumps Aeration Fountain and E&M Works

-

-

-

... More
Supply and Installation of Sewage Submersible Pump 5 HP including required cable

2

-

45000

... More
Supply and erection of Starter of suitable capacity

2

-

15000

... More
Supply and laying jointing of DI D/F Pipe 150mm, K-7

27.5

-

2000

... More
CI Special required for the proper installation of sewage pumps

1

-

50000

... More
Supply and Erection of CI D/F Flow Meter 150mm

2

-

35000

... More
M.S. D/F Column Pipe 150mm

6

-

2500

... More
CI D/F Non-Return Valve 150mm

2

-

25000

... More
1 Tonne Capacity chain Pully

4

-

20000

... More
Ground Earthing of all equipment with 58mm x 3 m long Copper Electrode, 50 kg Chemical, 25mm x 3mm G.I. strip, 6mm copper wire, 30X30X30 cm cover Chamber including supply of all material, labor, and T&P, etc complete for proper complition of work.

4

-

4066

... More
Supply & Fixing of aeration fountain in pond

3

-

225000

... More
Development Work

-

-

-

... More
Construction of Jogging Park

-

-

-

... More
EARTHWORK IN EXCAVATION IN ORDINARY SOIL INCLUDING LIFT UPTO 2.0M. & LEAD UPTO 30Mtr. & INCLUDING FILLING, WATERING AND RAMMING OF EXCAVATED EARTH

62.1

-

252.17

... More
PROVIDING AND LAYING CEMENT CONCRETE IN 1:4:8 ( 1 CEMENT : 4 COURSE SAND : 8 40 mm. BRICK BALLAST) AND CURING COMPLETE

20.7

-

4102.4

... More
BRICK WORK IN MASONRY IN 1:6 CEMENT & COURSE SAND MORTAR IN FOUNDATION

47.61

-

5101.42

... More
12 MM PLASTERING ON BRICK WORK WITH CEMENT MORTAR IN 1:4 CEMENT AND COURSE SAND

331.2

-

169.15

... More
Laying of 80 mm thick CC per rubber moulded interlocking paver tiles including 30 mm thick fine sand bed over (280mm thick compacted base of two layer of GSB & WMM, paid seperately and also including earth work in excavation in proper slope & camber including all labour, T&P etc. required for proper completion of work.

690

-

1200.19

... More
INSTALLATION OF LED LIGHTS IN PARK

-

-

-

... More
Supply & fixing of 7 mtr GI Octagonal Pole of approved make (top dia 70mm, Bottom dia 130mm and base plate 12mm thik) having 3mm thikness with single arm bracket (1 mtr length) on RCC foundation including the cost of foundation, foundation bolts, excavation & back filling and required T & P complete in all respect.

15

-

16500

... More
Supply and fixing of LED street light fitting having die cast aluminium body and diffuser with driver set suitable for 110 to 130 watt. Confirming to IP66 protection complete in all respect. (CAT-AAA)

60

-

10500

... More
Supply and fixing Aluminium unarmored cables (16x3 Core)

400

-

107

... More
Messenger/ Supporting Wire as per requirement

400

-

11

... More
S&F earthing of poles including cost of all required material

15

-

2000

... More
S&F of 25 Amp. Automatic on/off Switch

15

-

740

... More
Supply of 1.5mm multi stand copper wire.

100

-

16.64

... More
Insulater with clamp bolt

15

-

950

... More
Tree Plantation and Lanscaping work

-

-

-

... More
Plantation of Trees

100

-

500

... More
Landscaping of Park Area

1000

-

120

... More
Supply & Fixing of Recycled plastic outdoor three seater Bench

10

-

9000

... More
Construction of Boundary Wall made with Fencing wire & RCC Pracast post and MS Railing around the pond

-

-

-

... More
Supply and fixing of precast RCC fencing post 9 feet long

130

-

300

... More
Supply of Galvanized Iron Barbed Fencing Wire, 6mm

3500

-

15.5

... More
Fixing of Galvanized Iron Barbed Fencing Wire, 6mm in 7 rows and in cross

3500

-

68.32

... More
Fabrication and fixing of MS Grill made with 40x40x6mm MS Angle, 12 x 12mm square bar, and 30mm x 6mm MS Flat around the Pond for safety purposes including Supply of all material, labour and T&P etc.

150

-

9479

... More
Painting or varnishing on new iron work in small areas with two coat priming & two coat paint or varnishing including Supply of all material, labour and T&P etc.

1260

-

177.67



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.