If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Municipal Corporation Tender
Road Construction
Eprocure
Opening Date28 Jan 2025
Closing Date5 Feb 2025
Tender Amount₹ 3,56,992
Costs
EMD
₹ 3,56,992Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Improvement Of Foothpath By Interlocking Tiles Both Side Of New Constructed Hmp Road From I-2 -61 Sharda Medical Store To Bargad Chouraha And Keshav Vatika Road Dr V N Tripathi
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_NNKAN_998915_1Tender No
282/AA-6/2023-24Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Disposal of earth/malwa up-to 3.00 km cartage, in all cost complete
354.48
116
41459.98
... More
P.C.C. 1:6:12 (1 cement, 6 fine sand, 12 graded brick ballast 40 mm size), including supply of all material, labour and T&P etc. required for proper completion of work.
31.82
4275
136030.5
... More
First class brick work in 1:4 cement mortar with coarse sand F.M. 2.25 including supply of all material, labour and T & P etc. required for proper completion of work.
62.83
6366
399975.78
... More
12 mm thick plaster in 1:4 cement mortar with fine sand including supply of all material, labour and T&P required for proper completion of work
8.4
176
1478.4
... More
Construction of Granular sub base (G.S.B) by providing closed graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete in MORT& H specification 401.
153.6
3671
563865.6
... More
Providing and laying rubber molded reflective Zig Zag 80 mm thick interlocking tile of precast compressed C.C. passing minimum 30 mpa compressive strength I.S.I. marked, in grey based including joints filled and bedding 5 cm with local sand leveling, dressing of surface required level & slop and also including all material labour T&P loading, unloading, stacking, cartage and all taxes required for proper completion of work as per MORD specification No- 1500.
1920
870
1670400
... More
Providing and laying in cement concrete 4:2:1 of not less than strength of M 150 (4 stone ballast 20 mm nominal size: 2 approved coarse sand: 1 cement) and curing complete, including cost of
formwork in foundation and floor.
12.85
6643
85362.55
... More
R. C. C. slab in 1:1.5:3 (1 cement, 1.5 coarse sand & 3 stone grit 20 mm nominal size), including supply of all materials, labours and T&P etc. required for proper completion of work.
2.4
8527
20464.8
... More
Mild steel or iron in plain work such as reinforcement concrete, or reinforcement brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SCH. No-504,
1.88
7400
13912
... More
S/ fixing of sign board with pedestal
1
7400
7400
... More
ADD 18%GST
1
544564
544564.41