If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Road Construction
Eprocure
Opening Date30 Dec 2024
Closing Date15 Jan 2025
Tender Amount₹ 8,62,144
Costs
EMD
₹ 25,864Document Cost
₹ 1,357Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_987891_29Bid Award Id
ViewTender No
044/Nirman/2024-25 Date 26.12.2024Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Deduct the cost of old tiles etc A.R
22470
-4
-89880
... More
Earth Work in Embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkment to in 20 cm layers including remming and dressing the surface to required levels and slops also including 1.50 m lift and 30 m lead. The earth form cutting to be used in making in embekment or to be disposited and spoil banks with in 30 RMR
84.26
295
24865.13
... More
M-150 Brick work in 1:4 one cement and four course sand mortar in foundation and plinth Including suppy of all material labour,T&P etc required for proper completion of the work S.I No 305(a) SOR-2022
8.4
5170
43428
... More
S/L 12 mm thcik plaster (1:4) with cement & coarse sand including all materials,labour,tools, & plant etc all completed as per the direction of engineer -in - charge.SOR 2022 S.I N0-584 New item
67.2
200
13440
... More
S/L of 22.4 to 53 mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge.( As per PWD SOR 2020 RMR)
43.82
2151
94265.58
... More
Consolidation stone aggregates of 45-63mm/22.4-53mm size to water bound macadam,specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 KN static roller in stages to proper grade and camber applying and brooming crushable screening to fill-up the interstices of coarse aggregate,watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405.SOR 2022 Page N0-51 (752)
43.82
690
30235.8
... More
Construction of un-reinforced dowl jointed at expansion and construction join only plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 jmm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, approaches near to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using Curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause1501 S.I No-20.11 New item a
64.2
7675
492735
... More
P.C.C in 1:2:4 wiyh 2 cm gauge stone grit of instead of 4 cm gauge stone ballast etc all complete. S.I No-279(a) SOR 2022
4.42
7050
31161
... More
RCC work with cement, approved coarse sand and 2 cm gauge stone grit in proportions of 1:1.5:3 in slab wall etc excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG G.I.binding wire and including necessary centering and shuttering etc and supply of all materials, labour and tool & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. But for Slabs (As per S.I.No. 283 a) SOR-2022 New item
0.9
8640
7776
... More
S/F M:S (tor steel or plain) in plain work such as R:C:C or R:B work including bending for proper shape as necessary including bending for proper complition of the work and including supply of all steel & wasteage, bend, hooks, and authorised overlappinf shall be measured etc(Labour rate only but including cost of binding wire) all complete S.I.No. 502 SOR 2022
0.49
8166
4001.34
... More
Deduct the cost of old bricks S.I N0 1(A) SOR 2022
1546
-6
-9276
... More
Ded the cost of old bricks /batts S.I N0 1(F) SOR 2022
5.03
-800
-4027.92
... More
GST
18
730630
131513.55
Evaluation Notes How It Works ?