Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date25 Mar 2023
Closing Date3 Apr 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Class 150 brick work in foundation upto plinth in cement mortar 1.3 including supply of all materials labours , tools and plants required for proper Complation of the work As per PWD SOR item no.307

114.05

659117

5779.2

... More
Providing and laying 25mm thick damp proof course with cement conerete 1:2:4 including supply of all material labour , T&P etc. requrired for proper completion of work (As Per PWD SOR Basti item No.361)

9.6

69888

7280

... More
Laying R.C.C. work with 1:1.5:3 with core sand & 20mm stone gritt & all etc.Sl No.284A

33.47

329505

9844.8

... More
Mild steel or Iron work in R.C.C. including cutting at 1.25% of R.C.C. QTY Sl No 504

32.85

198676

6048

... More
12mm thick plaster 1:3 cement mortar & all etc. complete in walls Sl No 582

478.31

74999

156.8

... More
Earth work filling for flinth area cartage earth with 5 km Sl No.253

157.5

43306

274.96

... More
Supply & fixing of w.c. 450x600 mm toilet seat as per market rates

6

33600

5600

... More
Supply & fixing of boring and handpump as per market rates

1

8960

8960

... More
S/F of Aluminium/Fiber Doors & Windows with all necessary item.

7

43120

6160

... More
Ventilator

10

11200

1120

... More
Windows

2

8960

4480

... More
S/F of 1000 ltr. Over head watertank

1

7840

7840

... More
S/F 1 HP water pump

1

10080

10080

... More
S/F of Urinal set

2

5600

2800

... More
S/F of wash Basin

2

8960

4480

... More
P/L flat soling

44.4

14669

330.4

... More
Flooring cement concrete flooring in 1:2:4 laid in one layer finsihed with a floating cout neat cement over .80 mm thickness base concrete Sl No 601a

120

71904

599.2

... More
P/L 8mm thick wall tile and floor tils size 300mm x 300mm with base of cement marble 1:4 laid over joint with gray vement slurry mixed with pigmet to match the shade of slabincluding rubbung & polishing complete.Is 15622 CPWD 11:39

270

344736

1276.8

... More
Providing & applying white cement and two coat oil paint of average thickness 1mm & all complete etc.Sl No 23 NBO 18:57

478.31

42856

89.6

... More
S/F of iron gate

7

54880

7840

... More
Add water supply , sanitary , contingency , misgexpress instalation including cost of construction of septic estimated cost.

1

28000

28000

... More
S/F of sing board

1

11200

11200

... More
Add for Electrification including fans & all etc. complete 8% at estimated cost.

1

107374

107374.52



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.