Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Paints and Enamels
Eprocure
Opening Date19 Jan 2024
Closing Date27 Jan 2024
Tender Amount₹ 25,04,794
Costs
EMD
₹ 2,50,479Document Cost
₹ 3,251Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DOLBU_871929_44Bid Award Id
ViewTender No
10_PWD_2023-24Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Grandular Sub-base with well Graded Material (Table 400.1) (A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis)
24.01
82594
3440
... More
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (PWD SOR 2022-23, Chepter-6, Item No. 6.10)
59.36
317576
5350
... More
RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1 )
3.38
27040
8000
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Above plinth level upto fifth floor lable (PWD SOR 2022-23, Chepter-5, Item No. 5.2(ii)
7.4
66600
9000
... More
RCC work Providing and laying in position specified grade of reinforced cement concrete,Slab including the cost of centering, shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1)
7.41
62985
8500
... More
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar for super structure above plinth level upto floor five level including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall more than12cm. (PWD SOR 2022-23, Chepter-6, Item No. 6.10+6.8A)
52.59
303707
5775
... More
12 mm thick cement plaster with cement mortar in proportion of 1:4 cement & fine sand (Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. (PWD SOR 2022-23 Chapter No-13 Item No. 13.1 spec. No. 13.1.1)
480.96
81763
170
... More
Proving and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work. (PWD SOR 2022-23 Chapter No-05 Item No. 4.1 spec. No. 4.1.3)
1.5
9750
6500
... More
M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate)
17.84
124166
6960
... More
Supply & Laying of I-Shaped & zig-zag precast interlocking tiles of thickness 80 mm ordinary Coloured (compressive strength not be less than 30 Mpa and weight 4.50 kg) including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work.(PWD SOR 2022-23 Chapter No-20 New Item)
117
105300
900
... More
Mild Steel Iron 'Z' section windows and ventilators excluding cost of glass panes of but including supply of all materials,its fabrication, nuts and bolts, holdfast, labour and T&P required for proper completion of work as per direction of Engineer-in-charge and also including cost of handles,stays etc, inall respect at site of work. (PWD SOR 2022-23, Chepter-10, SI No. 18 Item No. New )
1900
152000
80
... More
Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work. (PWD SOR 2022-23, Chepter-15, SI No. 31 Item No. New )
480.96
64929
135
... More
Finishing walls with water proofing cement paint of approved make such as Super snowcem, Durocem, Robiance, Guttucem, Supercem quality and of required shade on under coated wall surface (One coat) over and including one coat white cement primer to give and even shade after thoroughly after brushing the surface . . (PWD SOR 2022-23, Chepter-15, Item No.660+661)
480.96
40881
85
... More
Applying priming coat over new steel and other metal surface upto 10cm. In width or girth or small not exceeding 0.10 Sq.M. area after and including preparing the surface by thoroughly clearing oil, grease, dirt and other foreign matter and scoured with wire brushed, fine steel/wood. Scrapper, sand papering and knotting including cost of all materials, labour T&P etc. required for proper completion of work. . (PWD SOR 2022-23, Chepter-15, Item No.641 New)
85.32
2730
32
... More
Painting two coat over priming coat (but excluding cost of priming coat) on steel and other metal surfaces upto 10cm width or girth or small articles not exceeding 0.10 Sq.M. in area with superior synthetic enamel such as Luxol 3, Hi gloss Apcolite, Superlac, Dulux specified brushing to give and even shade and including the cleaning the surface of all dirt, dust and other foreign matter sand papering and scrapping including cost of all materials, labour, tools andplants etc. required for proper completion of work.. (PWD SOR 2022-23, Chepter-15, Item No. 2(19.29)+642)
85.32
6057
71
... More
Grassing of Selection No-1 grass by dibling method.
900
58500
65
... More
Provision of hf hedge plants (Cllerodendron Enemy) of ht 1" amd above well estabkishes in poly beg.
117
2340
20
... More
Supplying and Planting of different type trees/plants well developed per direction of the officer-in-charge. ………………… including all complete.
100
15000
150
... More
Single slide
1
56800
56800
... More
Dubble seesaw
1
36500
36500
... More
Dome climber
1
58900
58900
... More
Merry go round
1
20000
20000
... More
Supply & Fixing seating Benches
10
77400
7740
... More
Supply of Dustbin
4
31400
7850
... More
03 HP Submersible
-
-
-
... More
Supply of thr Following Material. For installation of Submersible pump set 3.00 HP at site and other related items of work for proper Completion work. a- submersible pump set ISI marked including cable starter etc. 03 HP Single Phase 120 Meter head Pluga Make
1
20210
20210
... More
b- 125mm dia PVC pipe. (10 kg/ cm2)
140
60536
432.4
... More
c- 32mm dia G.I Pipe ( Medium Class)
90
16226
180.29
... More
d- Bleaching powder.
1
80
80
... More
e- 125mm dia PVC end Cap
1
206
206.8
... More
f- Plastic net to cover the slots of PVC pipe
1
500
500
... More
g- Solution of jointing PVC pipe.
1
100
100
... More
h- 4mm2 Copper Cable for submersible pump.
110
10546
95.88
... More
Transporation of material. T&P etc. to the site of work loading unloading & proper stacking at the site, including return cartage of unused material equipment and T&P etc. to departmental store complete.
1
1500
1500
... More
Digging the pit for boring work including dismantling of C.C., earth filling and reinstetment of CC, supply af all labour, T&P with arrangment of water required including of all material labour T&P etc. all complete.
1
5000
5000
... More
Construction of 200 mm dia bore hole by local Rig machine in ordinary soil with kankar, bazri etc. including transportation of material, lacal cutter machine, errection of machine and its dismantling after completion of work including hiring charge of all T&P including of all material labour T&P etc. required for complection of work. 0-145 M BGL.
145
47197
325.5
... More
Lowering of pipe assembly in 200 mm bore hole including all labour T&P required for jointing the various components and lowering them in to the bore hole upto proper depth etc. complete. 0-140 M BGL.
140
1680
12
... More
Supply of Pee Gravel Shrouding and packing between the bore hole wall & PVC lowering 125mm dia 10kg/cm2
1.5
2608
1739
... More
Installation of 03 HP submersible pump motor pump with 32mm G.I. lowering (submersible cable 4mm2 , & installation of startar) including supply of labour, T&P etc. complete.
1
2000
2000
... More
Development of bore till the discharge is free from turbidity by compression including labour required for completion work.
1
2000
2000
... More
Construction of brick work 1:6 chamber of size 60cm x60cm x 1.0m ( inside) including its R.C.C. cover 1:2:4 of size 1.10mx 1.10m of thickness 10cm for safety of boring & submersible motor pump set including supply of all material labour T&P etc. complete.
1
5200
5200
... More
Add 18 % G.S.T
1
381981
381981.84
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements