Municipal Corporation Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Municipal Corporation - MMC Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date15 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 5,83,286 
Notes
Download

Costs

Summary

Repair Of Drain And Construction Of Road By Cc In The Street Of Tyagi Residence And Councilor Residence In Ward-43, Brihampuri.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work.

9.2

4600

42320

... More
12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc.

40

160

6400

... More
Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

1.84

5650

10396

... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Slab excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire.

3.6

7300

26280

... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.

2.83

8728

24665.33

... More
Supply and stacking 53mm to 22.5mm size stone aggregate

36

1991

71683.2

... More
Laying spreading and consolidation but upto 10cm. (loose) thick coat. but excluding roller charges.

36

115

4140

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and Dowel bar and also including complete shifting of matrials & Concrete etc.(M-30) but when thikness of CC is less then 20 cm. (without dowel Bar)

54

6800

367200

... More
S/ fixing shine board at site +all comp of work

1

3000

3000

... More
Deduction cost of old interlocking tile

3024

-3

-9072



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.