Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date25 Oct 2024
Tender Amount₹ 4,57,286 
Notes
Download

Costs

Summary

Ward 4 Kamboj Gali Construction Of Cc Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ded the cost of old bricks/batts

0.86

-516

600

... More
Demolishing cement consrete manually by mechanical means including disposal of material within 50meters lead as per directin of engineer in charge nominal concrete 1:4:8 or leaner mix (ic equivalent design mix) (1239.60x-19%=1004.07)

9.8

9800

1000

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer incharge upto a distance of 30M from the foundation trenches.

20.6

1854

90

... More
Disposal of earth upto 8.00km from site including etc all complete work.

19.57

4503

230.1

... More
cement concretre with 4cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all matetials labour tools & plant etc requrad for proper completion of the work

6.76

32786

4850

... More
Cast cement concrete door sills chaukhats boundary posts shelves and similar small work with cement approved coarse sand and 2cm gauge stone grit in proportions of 1:2:4 excluding its fixing and binding the same with 24BW GGI bindin wire moulds all materials labour tools & plants etc required for proper completion of the work. the rate excludes making of drip course which shall be paid extra.

19.04

119571

6280

... More
Supply & laying spreading and compacting 53mm to 22.4mm size stone aggregate of specified sizes tio WBM specification in uniform thickness hand picking rolling with 3 wheled road/vibratory roller 8-10tonne capacity in stages to proper grade and camber app

17.5

60809

3474.84

... More
Construction of un-renforcement dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43grade cement or any other type as per clause 1501.2.2 (1:1.5:3) course and fine aggregates confirming to IS 383 maximum size in a concrete mixer of not exceeding 25mm mised in a concrete mixer of not then 0.2 cum capacity and approprate weight batcher using approved mix design laid in arpproved fixed side form work (steel channel laying and fixing of 125 micron thick polythene film wedges steel plates including leveling the formwork as per drawing) spreading the concrete with shovels rakes compacted using needle screed and plate vibrators and finished in continuous operation including provision of contraction and expansion construction joints as per norms applying debonding strips primer sealant dowel bars near approaches to bridgs/culvert and construction joints admixtures as approved curring of concrete slabs for 14days curing compound (where specified) and water finished to lines and grade as per drawing and technical specification clause 1501 including cost of polythene sheet and dowel bar and also including complete shifing of matrials & concrete etc (M-20)

17.5

127750

7300

... More
steel work welded in built up sections/framed work, including cutting hoisting fixing in position and applying a primer coat of approved steel primer using structural steel etc as required in gratings frames guard bar ladder railings brackets ates and similar (142.30x-19%=115.26)

200

23050

115.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.