Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Eprocure
Opening Date3 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 86,83,600
Costs
EMD
₹ 6,34,180Document Cost
₹ 11,271Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_962015_24Bid Award Id
ViewTender No
07_PWD_2024-25Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
RCC work raft Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) CHAPTER- 5 (Pwd SI.No.5.1)
83.6
668800
8000
... More
R.C.C work walls with cement, coarse sand and 2 cm (3/4") gauge approved stone grit in the promotion 1:1.5:3 excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessary centering and shuttering etc and also including supply of all materials labour and tools and plants etc. required to proper completion of the work. CHAPTER- 5 (DSR/ PWD SI No.5.2)
91.2
747840
8200
... More
CEMENT CONCRETE PAVEMENT(C.C ROAD) Construction of unreinforced cement concrete road with 1:1.5:3 with cement, coarse sand and stone grit and fixing of 125 micron thick polythene film, ..... …………….Complete CHAPTER- 20 (New Item)
399.3
2874960
7200
... More
R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (PWDSOR 2022-23 Chapter No-05 Item No. 5.1spec. No. 5.1.3)
4.2
31290
7450
... More
M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (Sl No. 504)
112.41
782373
6960
... More
Supplying and Planting of trees well developed in poly bag of size 20cm as per direction of the officer-in-charge. ………………… including all complete.
30
4500
150
... More
Supply and fixing of MS / Iron Tree guard in (1200 mm height) size…………………….. All Complete. (As per analysis of rate)
30
54240
1808
... More
Supply and fixing Manak board ……….. All Complete.(As per Analysis for rate)
1
4590
4590
... More
Construction of Inauguration / Silla patt board using brick work and granite stone ………….. All Complete.(As per Analysis for rate)
1
10380
10380
... More
Add 18 % G.S.T
1
1324611
1324611.15
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements