Municipal Corporation Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Municipal Corporation - MMC Tender
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jan 2025
Closing Date10 Jan 2025
Tender Amount₹ 2,78,618
Costs
EMD
₹ 13,931Document Cost
₹ 354Tender Fee
Refer Documents
Summary
Road Construction Work By Upgrading The Damaged Road From Mohammad Alis House To Haji Islams House And From Sirajs House To Kaddus House On Ward-72, Rahmatpura Lock Factory Road By Drain And Cc.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NNMEE_988508_33Bid Award Id
ViewTender No
6379/SNV-149T/2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://meerutnagarnigam.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
16.23
2930
47553.9
... More
M-150 brick work in 1:4 one cement and four coarse sand mortar in foundation and plinth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
16.29
4600
74954.24
... More
12 mm thick plaster 1:4 with Cement and four course sand including supply of all materials, labour, Tools & plants etc.
40.7
160
6512
... More
Cement Concrete with 2.0 cm. gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc.
3.08
5650
17413.3
... More
RCC work with cement, approved coarse sand & 2 cm guage approved stone grit in proportion of 1:1.5:3 in slab.
1.1
7300
8030
... More
Mild steel (tor steel or plain) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend , hooks, and authorised overlapping shall be measured and including cost of binding wire.
0.86
8728
7536.63
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1½:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and Dowel bar and also including complete shifting of matrials & Concrete etc.(M-30)
15.3
6800
104040
... More
Supply & fixing of sign bord at site proper completion of work
1
3000
3000
... More
Deduction cost of old bricks
854
-5
-4270
... More
Deduction cost of old bricks bats
2.77
-800
-2219.04
... More
Deduction cost of old Interlocking Tile If Found
522
-3
-1566
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements