Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Eprocure
Opening Date4 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 11,55,737
Costs
EMD
₹ 1,15,574Document Cost
₹ 1,659Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_962338_1Bid Award Id
ViewTender No
06_PWD_2024-25Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate)
54
185814
3441
... More
RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1 )
13
104000
8000
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering,huttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (CHAPTER-5 DSR/ PWD SI. No. 5.2)
15.6
127920
8200
... More
CEMENT CONCRETE PAVEMENT(C.C ROAD) Construction of unreinforced cement concrete road with cement, coarse sand and stone grit and fixing of 125 micron thick polythene film, ..... …………….Complete CHAPTER- 20 (New Item)
52.32
376704
7200
... More
RCC work Providing and laying in position specified grade of reinforced cement concrete in raft foundation including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (CHAPTER-5 DSR/ PWD SI. No. 5.1)
0.34
2533
7450
... More
M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (Sl No. 504)
18.17
126463
6960
... More
Supply and fixing Manak board ……….. All Complete.(As per Analysis for rate)
1
4590
4590
... More
Construction of Inauguration / Silla patt board using brick work and granite stone ………….. All Complete.(As per Analysis for rate)
1
10380
10380
... More
Add 18 % G.S.T
1
176298
176298.8