Municipal Corporation Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Municipal Corporation Tender
Civil And Construction
Drainage Work
Pipe Line Project
Eprocure
Opening Date7 Feb 2024
Closing DateCancelled
Tender Amount₹ 7,28,579
Costs
EMD
₹ 15,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_NNVAR_853305_5Tender No
882/EE(c)/JKNNV DATED-16.10.2023Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://nnvns.org.in:449/nnvns/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Dismantling of old existing sewer, and removal of material by mechanical transport up to a lead of 100m from site of work including all material labour T&P etc complete
120
15498
129.15
... More
Providing and laying Granular(JSB) bedding with carefully compacted graded hard crusher broken stone of 100% passing through 20mm sieve, 20-50% passing through 10mm sieve and 100% retained on 6mm sieve. 01.50 – 03.00m Increase 3%
6
17556
2926.11
... More
Providing and conveying to site RCC pipes with sulphate resistant cement of following class (with s/s ends) and diameter as per IS: 458 - 2003 (Amended up to date) including all taxes (Central and Local) with Rubber gaskets as per (EPDM/SBR) for sewer lines as per IS: 5382-1985 or (Amended up to date), including cost of Rubber gaskets, labour required, transportation, loading, unloading & stacking etc.(excluding cost of laying, jointing, testing and commissioning). The pipe shall be ISI marked.
250mm internal diameter.
120
91200
760
... More
Carting of following size R.C.C. piep NP3 class, socketed/spgoted) rubber ring joined and special from store to the work lowering the same into the trenches true to alignment including excavation of earth below invert level of pipe, cost of all jointing materials, testing, commissioning etc complete but excluding excavation and refilling of trenches from ground level to the invert level of pipe.
250mm dia Pipe.
120
53557
446.31
... More
Construction of brick masonry manhole in first class brick of following types and sizes in cement mortar 1:4, P.C.C. top slab with 1:2:4, foundation concrete 1:2:4, inside & outside plastering 12mm thick with cement mortar 1:3 finished with floating coat of neat cement and making channels in cement concrete with 1:2:4, finished with floating coat of neat cement complete with including CI steps (PVC encapsulated) staggered at 0.3 m interval, RCC arch above pipe including excavation, reinforcement and form work, RCC heavy duty frame and cover. Depth=1.21 to 1.50 and Type-A2
11
215281
19571
... More
Providing for interconnection in between proposed sewer line and existine disposal point including cost of all labour material and special T&P required for connection and re-instate the same complete in all respect.
250mm dia pipe.
3
9000
3000
... More
Provide and fix open timbering (covering 1/3rd of surface area by plank in trenches for the following depths below G.L. consisting of 40mm thick approved country wood plank for poling board 125x75mm Indian Sal wood wallers and 100mm diameter Sal wood ballies for shuttering at 1.50m c/c including removal after laying ( will be taken as one side for the purpose of payment and measurement i.e. area equals to length x depth of trenches). dismantled timbering material will be the property of the contractor. 00.00m - 03.00m B.G.L.
40
25200
630
... More
Sand filling in plinth includin supply of necessary quantity of sand from a dstance not exceeding 10km. Faraom athe site of work and including watering, dressing, etc. rate to include the cost of all materials, labour, T&P etc complete.
30
21000
700
... More
Carting & recarting of excavated earth where sufficient width of road is not available for stacking of excavated earth averae lead 250m.
120
12000
100
... More
Lighting during laying of sewer line at site with all labor, material T&P etc complete. work.
48
2688
56
... More
House hold Sewerline connection work with material.
3
9000
3000
... More
Provision for site clearance after construction peroiod and unforseseen items.
120
2160
18
... More
Repairing of water service connection damaged during laying of sewer line with material, labour, T&P, etc., all complete.
6
8463
1410.65
... More
Repairing of sewer service connection damaged during laying of sewer line with material, labour, T&P, etc., all complete.
10
22385
2238.5
... More
Repairing of Unforseen Item, power cable,water line ,communication cable damaged during laying of sewer line with material, labour, T&P, etc., all complete.
2
10000
5000
... More
Providing and erecting temporary barricading at site as per drawing/direction of Enginner-in-Charge whick includes wiriting and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, the barricading provided shall be retained in positon at site continouously i/c shifting of barricading from one location to another location ads many times as required during the excavation of the entire work till its completion. the barricading shall not ber removed without prior apporval of engineer-in-charge.
240
2400
10
... More
Reinstatement of dismantled roads after filling and proper compaction as per P.W.D. specification.
Stone Patiya/Interlocking.
120
37194
309.95
Evaluation Notes How It Works ?