Municipal Corporation Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Municipal Corporation - MMC Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date3 Jan 2025
Closing Soon10 Jan 2025
Tender Amount₹ 5,26,008
Costs
EMD
₹ 26,300Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Ward-60, Nehru Nagar, Construction Work Of Drain And Road By Cc In Street No. 10 Girish Bahadur And Street No. 03 Pritam.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NNMEE_988508_112Tender No
6379/SNV-149T/2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://meerutnagarnigam.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
9.75
2930
28567.5
... More
M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work S.I No.305 a
30.76
4600
141496
... More
12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc. SI No.584 (A)
106
160
16960
... More
Cement Concrete with 2.0 cm. gaug;e Approved stone grid coarse sand & cement in the proportion of 4:2:1 including , T&P etc. S.I. 279 (a)
3.42
5650
19303.47
... More
Supply and stacking of hard stone 22.4 -53 mm gauge stone ballast i/c All comp work
7.94
1991
15818.09
... More
Consolidation of hard stone ballast by hand rammer including opening out stacks sorting hard stone ballast into three sizes, repairing patches in existing road suface with hard stone ballast making medhi to retain water and ramming and also including carriage of metal upto 30 meters (100 ft.) carriage of water 200 metre supply and maintenance of barriers and all tools and plants required for proper completion of work, hard stone ballast to be supplied to the contractor free at site.but 12cm (loose) thick coat of stone ballast excluding roller charges +all comp. work
7.94
115
913.56
... More
Consinction of un-reinforced dowel jointed at expansion and constuction joint only plan cement concrete pavement thickness as per disign over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1.5:3) coarse and fine aggregates confirming to lS 383 maximum size of coarse aggegate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capicity and appropriate weight batcher using approvd mix design laid in approved fixed side form work (steel channal laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the formwork as per drawing) sprading the concrete with shovels, rakes compacled using needle screed and plate vibrators and finished in constinous operating including provision of contraction and expansion construction joints as per norms applying debonding strips primer sealent dowel bars,near approaches to bridges /culvert and consruction ,joints admixtures , as approved curing of concrete slabs for fourteen days ,curing compound,(where specified) and water finishing to lines and grade as per drawing and technical spercification clause 1501 i/c cost of polyethene sheets and dowel bars and also including complete shifting of material and concrete etc (M-30)
39.72
6800
270096
... More
RCC 1:1.5:3 in cement coarse sand and grit 2 cm. gauge.
1.8
7300
13140
... More
Mild steel or iron such as in plane reinforcement concrete.
1.41
8728
12332.66
... More
Deduction cost of old brick
1270
-5
-6350
... More
Deduction cost of old brick bat
4.14
-800
-3312
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%