Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Eprocure
Opening Date27 Nov 2021
Closing Date6 Dec 2021
Tender Amount₹ 3,35,800
Costs
EMD
₹ 33,580Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Construction Of Rain Water Harwesting
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_DOLBU_648121_4Bid Award Id
ViewTender No
225/Jalkal/E-T/2021-22Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Carting laying and jointing of the 110mm size pvc pipe including lowering them into the trenches
100
-
32.41
Fixing down pipe 110mm dia pipe excluding cost of pipe but including cost of laying and jointing material such as M
60
-
423.14
Construction of brick masonary collection chambers 45x45x60cm2
2
-
7000
Supply of perforated pipes 110mm dia x 6 kg/cm2 and end cap including and cartage upto store
62
-
335
Making bore hole 250mm dia by casing method in all type of soil as per drawing including supply of all material and t&P etc and cartage up to store including all taxes and
62
-
565
2469)Lowering the perforated pvc pipes in bore hole including supply of all material and t&p etc and cartage up to store including all taxes and duties and supply and pouring of pebbies 15 to 20 mm size between bore hole
62
-
65
Excavation in foundation in ordinary soil (loam clay or sand) including lift up to 1.50 m& lead up to 50m refilling watering and ramming of excavated earth into the trenches or space between the building and sides of foundation trenches or into the plinth and disposal of surplus earth up to the distance of 50m from the center of
31.62
-
165
concrete with 40mm gauge brick ballast local sand and cement in proportion in 12:6:1 in foundation including supply of all material labour t&p etc required
0.63
-
3875
1st class brick work in 1:4 cement and local mortar in foundation and plinth including supply of all material labour t&p etc required for proper complete
5.96
-
4800
R.C.C. work with cement coarse sand and 20mm gauge approved stone ballast in proportion of 1:1.5:3 in slabs excluding supply of reinforcement and its bending but indluding its fixing and binding the same with 0.50mm thick binding wire and the cost of binding wire and including necessary centening and shuttering supply of all material labour t&p etc required for proper completion
1.69
-
13144
M.S. or iron work in plain work such as R.C.C. or R.B. work (when not included in over all rates) brought to required shape as necessary including bending for proper completion of the work including supply of steel and its wastage.
1.58
-
7589
M.S. grill made of angle iron frame with square bars with locking arrangement including supply of all material labour t&p etc required for proper completion
1.5
-
8341
Supply and filling of following size of bebbles includins supply of all material labour t&p etc required for proper 25mm to 50mm
2.47
-
2601
15mm to 25mm
2.47
-
2601
6mm to 15mm
2.47
-
2400
Out side long walls (15mm to 25mm)
2.47
-
2601
Out side short walls (15mm to 25mm)
5.67
-
2601
Supply and filling of coarse sand including supply of all material labour t&p etc required for proper
4.12
-
2714
(1232 & 1233) painting or varnishing new work or new iron work in small areas with one priming coat and two coat of approved quality paint or varnish including supply of all material labour t&p etc required for peoper
1.2
-
174
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements