Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies Tender
Eprocure
Opening Date23 Jun 2018
Closing Date2 Jul 2018
Tender Amount₹ 8,51,000
Costs
EMD
₹ 17,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_DOLBU_220496_1Bid Award Id
ViewTender No
154/NP/2018-19 Dt. 20/06/18Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of Interlocking tiles and drain from Narayan Singh House to Naurangilal house at Ward No. 8 in Nagla Biriya
Construction of Interlocking tiles and drain from Narayan Singh House to Naurangilal house at Ward No. 8 in Nagla Biriya
BOQ Items
... More
Collection of Stone Ballast of 22.4-53 mm gauge Stone Ballast of approved Quarry i/c cost of material, cartage upto site of work duly stacked at site, royality octroi, also including trade tax.
37.8
75222
1990
... More
same as above Item no 3 & 4 above but Screening Matreial. @ 19%
14.36
26637
1855
... More
Consolidation of 45-63 mm gauge stone ballast including filling in pot holes, Patches & side of edges, and Top coat ramming by road roller i/c hire charges, its fuel etc. i/c opening out stacks i/c carriage of material up to 30 m carriage of water upto 200m. Supply and maintenance of barrier and all T&P etc. required for proper completion of the work. S.I.No. 755(c)
37.8
12474
330
... More
Consolidation of 22.4-53 mm gauge stone ballast including filling in pot holes, Patches & side of edges, and Top coat ramming by road roller i/c hire charges, its fuel etc. i/c opening out stacks i/c carriage of material up to 30 m carriage of water upto 200m. Supply and maintenance of barrier and all T&P etc. required for proper completion of the work. S.I.No. 755(c)
37.8
12474
330
... More
Earth work in excavation in foundation in ordinary soil i/c all material labour T&P etc. complete.
60.1
7512
125
... More
M-150 Bric work in 1:4 cement and coarse sand mortar i/c all material labour T&P etc. complete S.I.No. 305
66.34
301847
4550
... More
12mm thick Plaster in 1 : 4 with cement and coarse sand mortar i/c all material labour T&P etc. complete
116
16820
145
... More
Providing and laying DPC 2.5cm thick with cement concrete consisting of one part cement 1.5 part of coarse sand and three part of approved 13mm grade stone grit. i/c all mateiral labour T&P etc. complete. S.I.No. .361(a)
73.6
18768
255
... More
Cement concrete with 2cm gauge stone grit coarse sand & cement in 1:2:4
1.5
9450
6300
... More
Providing & laying Interlocking C.C. Tiles 80mm thick of approved quality over 50mm thick local sand. (Rubber Moulded) S.I.No. 21 New Item
120
105600
880
... More
Supply and fixing of Sing Board.
1
10000
10000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements