Municipal Corporation Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Municipal Corporation Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date28 Dec 2023
Closing DateCancelled
Tender Amount₹ 59,88,664 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bailing out or pumping out water / liquid mud during trench excavation. This includes providing necessary fuel, labour T&P etc. required for proper running of well point equipment of required capacity for lowering the water table during excavation and laying of sewers. Excavation of trenches only.

470

200271

426.11

... More
Dismantling of old existing sewer, and removal of material by mechanical transport up to a lead of 100m from site of work including all material labour T&P etc complete.

470

60700

129.15

... More
Providing and laying Granular bedding with carefully compacted graded hard crusher broken stone of 100% passing through 20mm sieve, 20-50% passing through 10mm sieve and 100% retained on 6mm sieve and Dimension are as per Approved Drawing for: 0.00 – 03.00m

23.5

68763

2926.11

... More
Providing and conveying to site RCC pipes with sulphate resistant cement of following class (with s/s ends) and diameter as per IS: 458 - 2003 (Amended up to date) including all taxes (Central and Local) with Rubber gaskets as per (EPDM/SBR) for sewer lines as per IS: 5382-1985 or (Amended up to date), including cost of Rubber gaskets, labour required, transportation, loading, unloading & stacking etc.(excluding cost of laying, jointing, testing and commissioning). The pipe shall be ISI marked. 250mm iternal diameter

470

357200

760

... More
Carting of following size R.C.C. piep (NP3 class, socketed/spigoted) rubber ring joined and special & from store to the work lowering the same into the trenches true to alignment including excavation of earth below invert level of pipe, cost of all jointing materials, testing, commissioning etc complete but excluding excavation and refilling of trenches from ground level to the invert level of pipe. 250 mm dia pipe.

470

209765

446.31

... More
Construction of brick masonry manhole in first class brick of following types and sizes in cement mortar 1:4, P.C.C. top slab with 1:2:4, foundation concrete 1:2:4, inside & outside plastering 12mm thick with cement mortar 1:3 finished with floating coat of neat cement and making channels in cement concrete with 1:2:4, finished with floating coat of neat cement complete with including CI steps (PVC encapsulated) staggered at 0.3 m interval, RCC arch above pipe including excavation, reinforcement and form work, RCC heavy duty frame and cover as per standard design and drawing. Depth=0.60 to 1.20 and Type-A1

8

100416

12552

... More
Depth=1.21 to 1.50 and Type-A2

7

136997

19571

... More
Depth=1.51 to 1.65 and Type-A3

5

103100

20620

... More
Depth=1.66 to 2.00 and Type-B1

5

142395

28479

... More
Depth=2.01 to 2.30 and Type-B2

3

106824

35608

... More
Depth=2.31 to 3.00 and Type-C1

2

127818

63909

... More
Provision for interconnection in between proposed sewer line and existing disposal point including cost of all labour material and special T&P required for connection and re-instate the same complete in all respect. 250mm dia pipe.

5

15000

3000

... More
Provide and fix open timbering (covering 1/3 rd of surface area by plank in trenches for the following depths below G.L. consisting of 40mm thick approved country wood plank for poling board 125x75mm indian sal wood wallers and 100mm diameter sal wood ballies for shuttering at 1.50m c/c including removal after laying (will be taken as one side for the purpose of payment and measurement l.e. area equals to length x depth of trenches). dismantled timbering material will be the property of the contractor.

1200

474096

395.08

... More
Sand filling in plinth including Supply of necessary quantity of sand from a distance not exceeding 10km. from the site of work and including watering dressing etc. rate to include the cost of all materials, labour T&P etc. required for proper completion of work.

141

98700

700

... More
Carting and recarting of excavated earth where sufficient width of roads is not available for stacking of excavated earth average lead 250m.

470

47000

100

... More
Lighting work during work. (60 night)

480

26880

56

... More
House hold sewer line connection work with material

30

90000

3000

... More
Provision for site clearance after construction peroiod and unforseseen items.

470

8460

18

... More
Repairing of water service connection damaged during laying of sewer line with material, labour, T&P, etc., all complete.

30

42319

1410.65

... More
Repairing of sewer service connection damaged during laying of sewer line with material, labour, T&P, etc., all complete.

20

44770

2238.5

... More
Repairing of Unforseen Item, power cable damaged during laying of sewer line with material, labour, T&P, etc., all complete.

1

50000

50000

... More
Providing and erecting temporary barricading at site as per drawing/direction of Enginner-in-Charge whick includes wiriting and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, the barricading provided shall be retained in positon at site continouously i/c shifting of barricading from one location to another location as many times as required during the excavation of the entire work till its completion. the barricading shall not be removed without prior apporval of engineer-in-charge. (both side)

940

9400

10

... More
Reinstatement of dismantled roads after filling and proper compaction as per P.W.D. specification. Tar road (Bituminous)

470

2182680

4644



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.