If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Municipal Corporation - MMC Tender
Civil And Construction
Road Construction
Eprocure
Opening Date15 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 12,70,912
Costs
EMD
₹ 63,546Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Road Construction Work Through Drain And Cc From Manoj Paniwale To Brahmapuri Road In Ward-62, Indranagar.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NNMEE_964120_78Bid Award Id
ViewTender No
6041/SNV-459T LIST2/2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://meerutnagarnigam.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in filling including 12 KM lead
196.35
307
60377.63
... More
Concrete with 4 cm. gauge Brick Ballast fine sand of 1.25 F.M. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work.
18.23
2930
53421.23
... More
M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work.
45.76
4600
210490.94
... More
12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc.
205.7
160
32912
... More
Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
7.93
5650
44797.72
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Slab excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire.
1.76
7300
12848
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.
1.38
8728
12058.6
... More
Supply and stacking 53mm to 22.5mm size stone aggregate
65.92
1991
131254.93
... More
Laying spreading and consolidation but upto 10cm. (loose) thick coat. but excluding roller charges.
65.92
115
7580.51
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and Dowel bar and also including complete shifting of matrials & Concrete etc.(M-30) but when thikness of CC is less then 20 cm. (without dowel Bar)
105.47
6800
717182.4
... More
S/ fixing shine board at site +all comp of work
1
3000
3000
... More
Deduction cost of old bricks
1788
-5
-8940
... More
Deduction cost of old bricks bats
9.03
-800
-7225.68
... More
Deduction cost of old interlocking tile
7382.76
-3
-22148.28