Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Software and IT Solutions
Eprocure
Opening Date21 Feb 2024
Closing Date18 Jul 2024
Tender Amount₹ 85,75,70,808
Costs
EMD
₹ 1,97,02,648Document Cost
₹ 50,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_901991_1Bid Award Id
ViewTender No
28/Nirman/2023-24 date 20.02.2024Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
PTZ Joystick Controller
4
-
-
... More
6 Mtr Pole with Cantilever for Fixed Box Camera with Foundation
134
-
-
... More
Std Pole for PTZ Camera Mounting with Foundation
41
-
-
... More
Industrial grade manageable 8 port poe Switch
82
-
-
... More
Junction Box
82
-
-
... More
1 KVA online UPS with 30min Backup
41
-
-
... More
Site Infra (Civil Work i.e Trenching, Cable Laying, Cat6 Cable, Power Cable, GI/HDPE Pipe, Fiber)
41
-
-
... More
Electricity Meter (58-41= 17 surplus)
41
-
-
... More
Extra Item If need in this work (Only for providing rate for the items, not including in this work)
1
-
-
... More
ATCS (30 three Arm Junction & 11 four arm Junction) - with using existing Traffic lights/Poles (As per RFP Specification)
-
-
-
... More
ATCS Controller
41
-
-
... More
Vehicle Detection DENSITY
134
-
-
... More
Countdown timer (EN Certified) - Used Existing (1 per arm) QTY134
-
-
-
... More
Galvanized Cantilever poles - Used Existing (1 per arm) QTY 134
-
-
-
... More
Galvanized Standard Poles - Used Existing (2 per arm) QTY 134
-
-
-
... More
Traffic Light Aspects -Red - Used Existing (3 per arm) QTY 402
-
-
-
... More
Traffic Light Aspects - Green-Straight Arrow - Used Existing (3 per arm) QTY 402
-
-
-
... More
Traffic Light Aspect - Green Left Arrow - Used Existing (3 per arm) QTY 402
-
-
-
... More
Traffic Light Aspects - Green Right Arrow - Used Existing (3 per arm) QTY 402
-
-
-
... More
Traffic Light Aspects? Amber -Used Existing (3 per arm) QTY 402
-
-
-
... More
Pedestrian lamp heads? Stop Man - Used Existing (2 per arm) QTY 268
-
-
-
... More
Pedestrian lamp heads? Walk Man - Used Existing (2 per arm) QTY 268
-
-
-
... More
Junction Box - Used Existing (Per Junction) QTY 41
-
-
-
... More
Power Cable for Traffic Lights lumsum - Used Existing (Per Junction) QTY 41
-
-
-
... More
1 KVA online UPS with 30 min Backup for ATCS Junction - Used Existing (1 Per Junction) QTY 41
-
-
-
... More
Traffic Enforcement - ITMS Hardware
-
-
-
... More
RLVD System per lane ( Camera & Application)
134
-
-
... More
ANPR system per lane (Camera, Application with IR illuminator ) Standard in city assume 2 Lane at each arm
268
-
-
... More
LPU
1
-
-
... More
Speed solution device based at Highways intersection i.e. Entry/ exist point - Total 16 Location as identified by User/ Ghaziabad Police Department
-
-
-
... More
Speed Monitoring system with device
16
-
-
... More
ANPR Camera with Application (assume 3 Lane)
48
-
-
... More
Pole with cantilever along Switch, UPS with Junction Box
16
-
-
... More
LPU
1
-
-
... More
PA & ECB System
-
-
-
... More
IP based PA System;
Switchable, Multi Zone, PA Speakers, voip/Amplifier with Built-in Digital signal Processor (PA system location assuming higher side at 3 arm junction-30, later may be reduce or interchange as per actual input by user/ police)
41
-
-
... More
ECB System (Emergency Call Box)
5
-
-
... More
Cat 6 Cable
1
-
-
... More
Power Cable
1
-
-
... More
System software and Application licenses - Analytics for surveillance, Traffic (including AI)
-
-
-
... More
DB License & Virtualization
2
-
-
... More
Network Management System (NMS) or Enterprise Management System Software (Total Node Sensor Approx 3000+)
1
-
-
... More
Video Management Software
1
-
-
... More
Video Management Software with failover
298
-
-
... More
Video Traffic Analytics Software (including AI)
1420
-
-
... More
(nohelmet, Triple Riding, Wrong Way, No Parking, Red-Speed ) These use case will be deployed on each ANPR Lane
-
-
-
... More
Video Surveillance Analytics Software (including AI)
507
-
-
... More
(Animal Detection, Smoke /Fire, Crowd Detection, littering, Help detection) Any three use cased will be deployed on each Surveillance Camera and Solid Waste surveillance Camera) (use case may vary)
&
ATCS Software - Central
1
-
-
... More
RLVD License -Central
1
-
-
... More
ANPR license – Central
1
-
-
... More
Speed Detection Software(software+ License) - Central
1
-
-
... More
E-Challan Application ?Central with NIC portal
1
-
-
... More
Traffic Monitoring and Management System - Central
1
-
-
... More
DB License & Virtualization
2
-
-
... More
Video Summarization System (VSS)
1
-
-
... More
Facial Recognition System (FRS)
150
-
-
... More
Intelligent Video Analytics (IVA)
150
-
-
... More
SOLID WASTE MANAGEMENT -ICT Enabled Solid Waste Management
-
-
-
... More
Solid Waste Management Application Software Development and Commissioning of Integrated SWM Application (web/mobile Compatible), SMS integration, Geocoding/ Geofencing/ Survey of sites (Offices/ dumping grounds/stations/ bins), asset tracking including cameras, weigh bridge and MSI application for Project health checkup/audit and complain Redressal system. This is Master view for Staff and Administrators.
1
-
-
... More
Dust bin tag/sensor RFID (Location /Qty may be change as per end-user input)
140
-
-
... More
Dust bin Tracking System Web portal
1
-
-
... More
Other Accessories (Electric and Network Cabling Infrastructure)
140
-
-
... More
Integration with existing Weighbridge
1
-
-
... More
Integration with all the solution in ICCC
1
-
-
... More
Surveillance Camera (Bullet) for Weighing Points
10
-
-
... More
Surveillance Camera (Bullet) for MRF
10
-
-
... More
Surveillance Camera (Bullet) for Transfer Points
6
-
-
... More
Std. Pole for Reader & camera with switch (8Port) & Junction box & UPS
26
-
-
... More
Installation and Commissioning of above solution
1
-
-
... More
Training Charges for Above Solution
1
-
-
... More
Environmental Sensor
-
-
-
... More
Environmental Sensor
1
-
-
... More
EMS System web portal
1
-
-
... More
Variable Messaging Board with Pole & Structure
1
-
-
... More
Command Control Room (Hardware Component)
-
-
-
... More
70" (diagonally) with LED Light Source complete configuration - Main Control Room (4X3) Cube (12 screen)
2
-
-
... More
Video Wall Controller & Application
1
-
-
... More
Workstations
10
-
-
... More
IP Based MFP Printer
2
-
-
... More
LED Screen
20
-
-
... More
Video Conferencing System
1
-
-
... More
Surveillance System (Camera) for Control Room for 8 CCTV with NVR solution
1
-
-
... More
Biometric access control system
4
-
-
... More
IP PBX with required license & System, ACD and Call
&
Recording license with system, IP Phones with 5 head set
1
-
-
... More
UPS with 1 Hr Battery backup - 20 KVA
2
-
-
... More
IP PA Console
1
-
-
... More
Network Component (Servers in City Control Room)
-
-
-
... More
L3 Switch 24port –Manageable
3
-
-
... More
Routers
3
-
-
... More
Core Switches
3
-
-
... More
Firewall and IPS/IDS
2
-
-
... More
24 Core rack mounted LIU with all accessories including fibber, patch card etc.
3
-
-
... More
Central antivirus security
1
-
-
... More
Patch Cord (1 Mtr.)
1
-
-
... More
Patch Cord (3 Mtr.)
1
-
-
... More
24 Port Patch Panel (Fully Loaded)
12
-
-
... More
42U Network Rack
3
-
-
... More
Load balancer and ddos
1
-
-
... More
Next Generation Firewall
2
-
-
... More
KVM Switch
2
-
-
... More
Cloud Infra
1
-
-
... More
L3 Switch 24port –Manageable
3
-
-
... More
Routers
3
-
-
... More
ICCC Component
-
-
-
... More
Integration (Surveillance, Solid-waste, ITMS, Environment & other internal application)
1
-
-
... More
Application ICCC Integrated command and Control Center Application as per the RFP requirement
1
-
-
... More
Hardware (Including Server + IT Infrastructure+Non-IT Infrastructure + Utilities etc.)
1
-
-
... More
Control Room Infra & Network Connectivity
-
-
-
... More
Furniture for Operator Desks
8
-
-
... More
Furniture for Manager's Desk
1
-
-
... More
Furniture for Meeting Table and Chairs
1
-
-
... More
Furniture for Contact Center Operator Desks
2
-
-
... More
Furniture for Security Room Desks
1
-
-
... More
Furniture for 'Technical Support Team Desks
2
-
-
... More
Furniture for War Room
1
-
-
... More
VESDA/ Fire Alarm & Suppression System
1
-
-
... More
Network Connectivity (Junction, Entry /Exit, and solid waste location network connectivity)
-
-
-
... More
Network connectivity from field to CC ( Junction, Entry /Exit, and solid waste location)- Setup Cost
84
-
-
... More
Internet Bandwidth at CC@30 Mbps for multi purpose use. Setup Cost
1
-
-
... More
Row, Incremental Fiber Cost - Customer Scope
-
-
-
... More
Onsite ( 5 Years)
1
-
-
... More
O & M(5Yrs) Project Manpower (ITMS Expert, Surveillance Expert, Pantry Staff, Electrical and Plumbing Team)
1
-
-
... More
Manpower Cost
-
-
-
... More
Project Manager (5 Yrs)
1
-
-
... More
CCC Manager (5 Yrs)
1
-
-
... More
Solution Support Personnel at CCC (5 Yrs)
2
-
-
... More
Operators (5+4+3) In three Shift (5 Yrs)
12
-
-
... More
Initial Project Implementation Manpower (5 Yrs)
1
-
-
... More
Disaster Recovery Centre (For 1 year) The Data will be directly stored on Cloud Server
-
-
-
... More
Storage (only 100% for E- Challan)
12
-
-
... More
Storage for Other Apps
2
-
-
... More
Cloud Installation & Set-up (One time)
1
-
-
... More
Network Cost for 5 Yrs
-
-
-
... More
Network connectivity from field to CC ( Junction, Entry /Exit, and solid waste location)- for 5 yrs
83
-
-
... More
Internet Bandwidth at CC@30 Mbps for multipurpose use - 5 Yrs
1
-
-
... More
Extra Item If need in this work (Only for providing rate for the items, not including in this work)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements