Municipal Corporation Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Municipal Corporation - MMC Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date15 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 12,59,396
Costs
EMD
₹ 62,970Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NNMEE_964120_34Bid Award Id
ViewTender No
6041/SNV-459T LIST2/2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://meerutnagarnigam.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in filling including 12 KM lead
354.38
307
108970.31
... More
Concrete with 4 cm. gauge Brick Ballast fine sand of 1.25 F.M. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work SI no.273.
6.24
2930
18283.2
... More
M-150 brick work in 1:4one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work S.I No.305 a
15.9
4600
73140
... More
12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc. SI No.584 (A)
69.6
160
11136
... More
Cement Concrete with 2.0 cm. gaug;e Approved stone grid coarse sand & cement in the proportion of 4:2:1 including , T&P etc. S.I. 279 (a)
3.18
5650
17967
... More
RCC 1:1.5:3 in cement coarse sand and grit 2 cm. gauge. As SI 284 A
2.8
7300
20440
... More
Mild steel or iron such as in plane reinforcement concrete.
2.2
8728
19184.14
... More
providing laying and 53mm to 22.4mm size stone aggregate. compction
67.2
1991
133808.64
... More
Laying spreading and consolidation of 12 cm (loose) thick coat of stone ballast but excluding roller charge As per SI no 755 b
67.2
115
7728
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1½:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels.rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, dowel bars, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and Dowel bar and also including complete shifting of matrials & Concrete etc.(M-20)Same as above but when thikness of CC is less then 20 cm. (without dowel Bar)
126
6800
856800
... More
Supply & fixing of sign board at site proper completion of work
1
3000
3000
... More
Deduction for old Interloking tile +All comp of work
7938
-3
-23814
... More
Deduction cost of old bricks
1143
-5
-5715
... More
Deduction cost of old bricks bats
2.48
-800
-1987.2