Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Road Construction
Drainage Work
Eprocure
Opening Date14 Mar 2024
Closing Date20 Mar 2024
Tender Amount₹ 75,07,014
Costs
EMD
₹ 1,50,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Construction Of Road And Drain From Safiullah's House To Gudiya Pulia And In Various Streets In Ward No. 17
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_916735_1Bid Award Id
ViewTender No
TAY 17Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supply of labour for cleaning of silt in drain including etc. all complete of work
24
7920
330
Earth work Exavation in ordinary soil up to 1.5m lift & 30m lead with all complete work
157
18840
120
P.C.C 1:6:12 cement sand and 40mm brick ballast and all complete the work
79
316553
4007
M-150 Brick work (1:4) with all complete the work
248
1442616
5817
Providing & laying of 12 mm cement plaster of mix 1:4 (1 cement: 4 coarse sand)
679
107961
159
Cement concrete with cement, sand & 20mm gauge stone Grit with the proportion of (1:2:4) including all complete the work
10
81860
8186
Supply and laying of 125 micron polythene with all complete the work
2860
68640
24
Brick soling with straight over burnt brick laid flat and dry including all complete the work
1480
497280
336
Construction of Granular sub base(G.S.B.) 53-9.5 mm thick S/B up to 10cm loose layer including all complete the work
315
987288
3134.25
Consolidation of G.S.B. upto 10cm thick loose layer by Road roller including all complete the work
315
92925
295
Water allwance to be allowed on consolidation
315
10867
34.5
Providing and fixing of Road barracading with all complete the work
80
9440
118
Cement concrete with cement, sand & 20mm gauge stone Grit with the proportion of (1:1½:3) including all complete the work
343
3138450
9150
Providing & Laying of Rubber molded reflective Zig-Zag 80mm thick Interlocking Tiles of precast compressed C.C. passing Minimum 30mpa compressive strength I.S.I. marked. In gray based. Including joints filled and bedding 5cm. With local sand leveling dressing of surface required level & slop and also including all material labour T&P loading unloading stacking cartage and all taxes required for proper completion of work as per MORD specification No.-1500
540
455760
844
Cement concrete Grove by machanical machine including all complete of the work
816
57120
70
Providing and laying in position specified grade of reinforced cement concrete (R.C.C.) 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
4
36328
9082
M.S. iron work including cutting, bending and praper laying and all complete the work
3
23070
7690
Dedection of work
-
-
-
(A)Bricks
8648
-60536
7
(B)Brick bats
28
-39200
1400
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements