Municipal Corporation Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Municipal Corporation Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date28 Dec 2023
Closing DateCancelled
Tender Amount₹ 5,20,399
Costs
EMD
₹ 10,500Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_NNVAR_874940_5Tender No
1072/II/ZONE-4/JKNNV DATE-23.12.2023Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://nnvns.org.in:449/nnvns/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
03.01m – 04.50m B.G.L.
60
10890
181.5
... More
Bailing out or pumping out water / liquid mud during trench excavation. This includes providing necessary fuel, labour T&P etc. required for proper running of well point equipment of required capacity for lowering the water table during excavation and laying of sewers. Excavation of trenches only.
30
12783
426.11
... More
Providing and laying Granular bedding with carefully compacted graded hard crusher broken stone of 100% passing through 20mm sieve, 20-50% passing through 10mm sieve and 100% retained on 6mm sieve and Dimension are as per Approved Drawing for: 0.00 – 03.00m
15
43891
2926.11
... More
Providing and conveying to site RCC pipes with sulphate resistant cement of following class (with s/s ends) and diameter as per IS: 458 - 2003 (Amended up to date) including all taxes (Central and Local) with Rubber gaskets as per (EPDM/SBR) for sewer lines as per IS: 5382-1985 or (Amended up to date), including cost of Rubber gaskets, labour required, transportation, loading, unloading & stacking etc.(excluding cost of laying, jointing, testing and commissioning). The pipe shall be ISI marked.
450mm iternal diameter
30
63000
2100
... More
Carting of following size R.C.C. piep (NP3 class, socketed/spgoted) rubber ring joined and special from store to the work lowering the same into the trenches true to alignment including excavation of earth below invert level of pipe, cost of all jointing materials, testing, commissioning etc complete but excluding excavation and refilling of trenches from ground level to the invert level of pipe. 450 mm dia pipe.
30
18871
629.06
... More
Construction of brick masonry manhole in first class brick of following types and sizes in cement mortar 1:4, P.C.C. top slab with 1:2:4, foundation concrete 1:2:4, inside & outside plastering 12mm thick with cement mortar 1:3 finished with floating coat of neat cement and making channels in cement concrete with 1:2:4, finished with floating coat of neat cement complete with including CI steps (PVC encapsulated) staggered at 0.3 m interval, RCC arch above pipe including excavation, reinforcement and form work, RCC heavy duty frame and cover as per standard design and drawing.
Depth=3.01 to 3.50 and Type-C2
1
68096
68096
... More
Provision for interconnection in between proposed sewer line and existine disposal point including cost of all labour material and special T&P required for connection and re-instate the same complete in all respect.
450mm dia pipe.
2
20000
10000
... More
Provide and fix open timbering Covering 1/3rd of surface area by plank in trenches for the following depths below G.L consisting of 40mm thick approved country wood plank for poling board 125x75mm indian sal wood wallers and 100mm diameter sal wood ballies for shuttering at 1.50m c/c including removal after laying (will be btaken as one side for the purpose of payment and measurement l.e. area equals to length x depth of trenches). dismantled timbering material will be the property of the contractor. 00.00m-03.00m B.G.L.
240
94819
395.08
... More
Sand filling in plinth including Supply of necessary quantity of sand from a distance not exceeding 10km. from the site of work and including watering dressing etc. rate to include the cost of all materials, labour T&P etc. required for proper completion of work.
30
21000
700
... More
Carting and recarting of excavated earth where sufficient width of roads is not available for stacking of excavated earth average lead 250m.
30
3000
100
... More
Lighting work during work. (07 days 08 hrs.)
56
3136
56
... More
Traffice diversion during work with all labour T&P complete.
1
5000
5000
... More
Provision for site clearance after construction peroiod and unforseseen items.
30
540
18
... More
Repairing of water service connection damaged during laying of sewer line with material, labour, T&P, etc., all complete.
3
4231
1410.65
... More
Repairing of sewer service connection damaged during laying of sewer line with material, labour, T&P, etc., all complete.
2
4477
2238.5
... More
Repairing of Unforseen Item, power cable damaged during laying of sewer line with material, labour, T&P, etc., all complete.
1
10000
10000
... More
Providing and erecting temporary barricading at site as per drawing/direction of Enginner-in-Charge whick includes wiriting and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, the barricading provided shall be retained in positon at site continouously i/c shifting of barricading from one location to another location ads many times as required during the excavation of the entire work till its completion. the barricading shall not ber removed without prior apporval of engineer-in-charge.
30
300
10