Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Eprocure
Opening Date3 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 40,81,602
Costs
EMD
₹ 4,08,160Document Cost
₹ 5,112Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_962015_38Bid Award Id
ViewTender No
07_PWD_2024-25Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate)
168.18
578707
3441
... More
RCC work raft Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) CHAPTER- 5 (Pwd SI.No.5.1)
28.46
227680
8000
... More
R.C.C work walls with cement, coarse sand and 2 cm (3/4") gauge approved stone grit in the promotion 1:1.5:3 excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessary centering and shuttering etc and also including supply of all materials labour and tools and plants etc. required to proper completion of the work. CHAPTER- 5 (DSR/ PWD SI No.5.2)
26.09
213938
8200
... More
M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (Sl No. 504)
42.82
298027
6960
... More
Providing and applying tack coat with bitumen (VG-10) at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per technicla specification clause-503 (As per Analysis)
3545
46439
13.1
... More
Providing and laying 50mm dense graded bituminous macadam with 100 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler,MORTH Specification clause 507complete in all respects.
88.63
989633
11165.9
... More
Providing and laying Bituminous concrete with 60-90 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggergates of specified graing, premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the mix to work site, laying with a hydrostatic paver finisher with senser control to the required grade, level and alignment, rolling with smooth wheeler, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. (As per Analysis)
53.18
679273
12773.1
... More
P/L of hot applied thermoplastic compund 2.5 mm thick including trorising glass beeds @ 250 gm per sam area. Thickess of 2.5 mm in exclusive of surface applied glass beeds etc . ………… Including cost of all material, labour, T&P etc. require for proper completion of work as direction by E/I.
102
52530
515
... More
CEMENT CONCRETE PAVEMENT(C.C ROAD) Construction of unreinforced cement concrete road with 1:1.5:3 with cement, coarse sand and stone grit and fixing of 125 micron thick polythene film, ..... …………….Complete CHAPTER- 20 (New Item)
14.3
102960
7200
... More
12 mm thick cement plaster in single coat on fair side of single or hair brick well for interior plastering upto floor two level including brick wall for plastering upto floor two level including internal rounded angles not exceeding 80 mm in girth, hamfers and finished even and Stooth. No. extra for mixing any 1 cement : 3 coarse sand (S.I. No. 17.58
397.76
73585
185
... More
Finishing walls with Putty approved brand and
manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work.
397.76
53697
135
... More
Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer applid @ 0.75Ltr / 10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work.for two coat.
397.76
52504
132
... More
Supply and fixing Manak board ……….. All Complete.(As per Analysis for rate)
1
4590
4590
... More
Construction of Inauguration / Silla patt board using brick work and granite stone ………….. All Complete.(As per Analysis for rate)
1
10380
10380
... More
Add 18 % G.S.T
1
622616
622616.47
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements