Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Nov 2024
Closing Date18 Nov 2024
Tender Amount₹ 3,68,191 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Taking out existing c.c interlocking paver block form foothpath centeral varge to be including removal of rubbish etc as per pwd sor 2022 page no 36 si no 13.11 new item

71.25

100

7157.06

... More
Deduct cost of old tile

1246.88

-5

-6234.4

... More
Earth work Excavation in ordinary soil includng lifting and lead upto 30 m and including filling watering and ramming of excavation of earth into the trench into the plinth and removal and disposal of material Pwd sor 2022 item no -4.1.1

20.9

110

2299

... More
Disposla of refusing material malba distance up to 8km lead all complete as the direction of engineer in charge (as per pwd sor 2022 /231(a)

24.56

195

4791.66

... More
S/L of 4cm gauge brick ballast ballast in p.c.c. 1:6:12 with 40 cm aguge brick ballast fine sand of 1.25 fm and cement in foundation and under florr including all material labour,tools & plant etc required for proper completion of the work As per pwd sor 2022 paage no 36 si no - 13.11 new item

4.18

4000

16720

... More
R.c.c in 1:1.5:3 with approved coarse sabd &2cm gauge approved stone grit in proportions of excluding supply of reinforcement and its bending but including its fixing andf binding wire including necessory cantering (As per pwd sor 2020@283(A)

11.83

8640

102211.2

... More
M.S work in rcc work including straightening cutting bneding placing in positiion and binding all complete upto plinth level mild stell and medium tensile stell bars DSR 2023 iyem no-5.22.1

6.5

8166

53079

... More
S/l of 22.4 to 53 mm gauge stone ballast stacking for measurement etc all complete as per the direction of engineer charge (As per pwd sor 2020 RMR)

9.5

2151

20436.4

... More
Consolidation of stone aggregate of 45 - 63 mm & 22.4 to 53 m,m gauge stone size to water bound macadam specification including spreading in uniform thicknesds si no 20.02 item no 752 pwd sor 2022

9.5

690

6555

... More
Supply and laying of 80 mm thick precast cement concrete I shape interlocking tile paver block grey colour with top layer of minimum 8mm thick having plan dimension 200x (160+120mm)of o.p cement smoothing gloss finished M30 and weight 5kg per no confirming to is 15658-2006 including cost of material labour t&p etc required for proper completion of the work as per direction by engineer in charge M30 grade as per pwd sor 2022

118.75

764

90725

... More
cement Concrete with sand of 1.25 F.M and cement in proportion of 1:2:4 with 2cm gauge stone grit instead of 4cm gauge stone ballast As per pwd sor 2022 279 (a)

1.09

7050

7684.5

18

312026

56164.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.