Directorate Of Urban Local Bodies Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Directorate Of Urban Local Bodies - DOLBU Tender
Civil And Construction
Road Construction
Eprocure
Opening Date28 Sep 2024
Closing Date5 Oct 2024
Tender Amount₹ 14,90,000
Costs
EMD
₹ 1,49,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Road construction work by RCC drain and interlocking in the street
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOLBU_959404_1Bid Award Id
ViewTender No
2397(112)/NNA/2024-25Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level :(a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
36.28
297496
8200
Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and including the supply of steel and its wastage Bend, hooks and authorized over lapping shall be measured upto floor to level. 8 mm dia bar
2563.04
226034
88.19
Providing and laying cement concrete in 1:5:10 (1 Cement : 5 Fine sand : 10 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work.
In Foundation and floors.
37.82
196664
5200
CEMENT CONCRETE PAVEMENT(C.C ROAD)
construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) (1:1.5:3) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel laying and fixing of 125 micron thick plastic sheet, wedges steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continuous opration including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501.including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification (approved Quarri grit)
58.82
452914
7700
Construction of padestral Grainite stone etc complete
1
6500
6500
Cleaning of site / site photo etc complete
1
2000
2000
Add 18% GST
1
227361
227361
The Total value of Schedule4
-
1490482
-