Municipal Corporation Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Municipal Corporation - MMC Tender
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jan 2025
Closing Soon10 Jan 2025
Tender Amount₹ 8,29,087
Costs
EMD
₹ 41,454Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
In Ward 67 Preet Vihar, Work Of Road From Satpals House To Sumits House And Somveers Street, Drain And Cc.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NNMEE_988508_149Tender No
6379/SNV-149T/2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://meerutnagarnigam.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work S.I No.305 a
18.42
4600
84724.64
... More
12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc. SI No.584 (A)
121.26
160
19402.24
... More
Cement Concrete with 2.0 cm. gaug;e Approved stone grid coarse sand & cement in the proportion of 4:2:1 including , T&P etc. S.I. 279 (a)
5.19
5650
29296.36
... More
Supply and stacking of hard stone 22.4 -53 mm gauge stone ballast i/c All comp work
6.46
1991
12865.06
... More
Consolidation of hard stone ballast by hand rammer including opening out stacks sorting hard stone ballast into three sizes, repairing patches in existing road suface with hard stone ballast making medhi to retain water and ramming and also including carriage of metal upto 30 meters (100 ft.) carriage of water 200 metre supply and maintenance of barriers and all tools and plants required for proper completion of work, hard stone ballast to be supplied to the contractor free at site.but 12cm (loose) thick coat of stone ballast excluding roller charges +all comp. work
6.46
115
743.01
... More
Consinction of un-reinforced dowel jointed at expansion and constuction joint only plan cement concrete pavement thickness as per disign over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1.5:3) coarse and fine aggregates confirming to lS 383 maximum size of coarse aggegate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capicity and appropriate weight batcher using approvd mix design laid in approved fixed side form work (steel channal laying and fixing of 125 micron thick polythene film wedges steel plates including levelling the formwork as per drawing) sprading the concrete with shovels, rakes compacled using needle screed and plate vibrators and finished in constinous operating including provision of contraction and expansion construction joints as per norms applying debonding strips primer sealent dowel bars,near approaches to bridges /culvert and consruction ,joints admixtures , as approved curing of concrete slabs for fourteen days ,curing compound,(where specified) and water finishing to lines and grade as per drawing and technical spercification clause 1501 i/c cost of polyethene sheets and dowel bars and also including complete shifting of material and concrete etc (M-30)(wuthout dowel bars) when thickness of cc is less than 20 cm ( wuthout dowel bars) m-30
96.91
6800
659017.92
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.
0.72
7300
5256
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.
0.57
8728
4933.07
... More
Deduction cost of old brick
1452
-5
-7260
... More
Deduction cost of old brick bat
4.74
-800
-3788.93
... More
Deduction cost of old C.C. Tiles
8480.01
-3
-25440.03
... More
Supply and Fixing Sign Board at site.+all comp.of work.
1
3000
3000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%