Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Eprocure
Opening Date3 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 1,69,05,520 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate)

1140

3922740

3441

... More
Supply & Laying of I-Shaped & zig-zag precast interlocking tiles of thickness 100 mm ordinary Coloured (compressive strength not be less than 30 Mpa and weight 4.50 kg) including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work.(PWD SOR 2022-23 Chapter No-20 New Item)

4560

4674000

1025

... More
Supply & Laying of I-Shaped & zig-zag precast interlocking tiles of thickness 100 mm ordinary Grey (compressive strength not be less than 30 Mpa and weight 4.50 kg) including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. (PWD SOR 2022-23 Chapter No-20 New Item)

4560

4309200

945

... More
Proving and laying cement concrete in 1:2:4 with cement, coarse sand and 20mm guage stone aggregate, curing complete, including cost of form work.

28

182000

6500

... More
RCC work Providing and laying in position specified grade of reinforced cement concrete in raft foundation including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (CHAPTER-5 DSR/ PWD SI. No. 5.1)

6.3

46935

7450

... More
M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (Sl No. 504)

3.96

27561

6960

... More
Supplying and Planting of trees well developed in poly bag of size 20cm as per direction of the officer-in-charge. ………………… including all complete.

100

15000

150

... More
Supply and Fixing M.S Iron Tree Guard brought to required shape as necessary of the work ………………… including all complete. (As per Analysis)

100

180800

1808

... More
Supply and fixing Manak board ……….. All Complete.(As per Analysis for rate)

1

4590

4590

... More
Construction of Inauguration / Silla patt board using brick work and granite stone ………….. All Complete.(As per Analysis for rate)

1

10380

10380

... More
Add 18 % G.S.T

1

2578777

2578777.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.