Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date24 Dec 2024
Closing Date13 Jan 2025
Tender Amount₹ 15,73,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete with 4 cm gauge approved stone ballast, approved coarse sand, cement in the proportion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work.

3.04

4200

12768

... More
Random course Rubble massonary in 1:4 cemet and fine sand mortar in foundation nad plinth, plinth including supply of all materials, labour and toos and plants etc. Required for proper completion of the work.

88.16

3800

335008

... More
Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work

114

145

16530

... More
Cement concrete with 2 cm gauge approved stone ballast, approved coarse sand, cement in the proportion 3:1½:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work.

1.52

6000

9120

... More
Construction of granular sub-base by providing well graded material (Stone Dust) 0.15 Mtrs. compacted thickness spreading in uniform layers with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the desired density complete as per technical specification clause 401.

32

1216

38912

... More
Construction of granular sub-base by providing coarse graded material spreading in uniform layers with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with svibratory roller to achieve the desired density complete as per technical specification clause 401 (place method).

32

1932

61824

... More
Interlocking Concrete Block Pavement Providing and laying of Rubble mouled ZigZag Coloured Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification clause 1504

160

870

139200

... More
RCC work with cement approved coarse sand and 2cm (3/4’’) gauge approved stone ballast in the proportion 1:1½:3 in lintels of door and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I. wire and including necessary cantering and suttering etc and also including supply of all materials, labour and tool and plnats etc.required for proper completion of the work binding wire to be supplied by the contactor free of coast.

11.38

7500

85350

... More
Mild srteel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary of the work and including supply of steel, its wastage and hooks and authorized over lapping shall be measured.

10.72

5600

60032

... More
Supply of M.S. Angle iron door, windows ventilation frame made of approved M.S. angle iron wroght to required form including drilling hole, welding and recetting where necessary and also including supply of all material, such as steel hinges of required size, nut & bolts etc. and also including all taxes, wastage and one coat of red oxide paint complete in all respect as per direction of Engineer-in-charge for proper completion of work at site of work.

6

6600

39600

... More
Painting or venshing new iron work in small areas or new wood with one coat ( up to one sq. meter) of raedy mixed priming paint and three coat of approved superior quilty ready misxed paint or varnish including supply of all materials,labuor and tools plant etc.requred for proper completion of the work.paint to be used should confirm the ISI no-103-1950.

33.6

88

2956.8

... More
Painting with plastic paint including all material labour T&P etc. required for proper completion of the work as per direction of Engineer-in-charge.

76

140

10640

... More
Providing and laying red sand stone with its cutting, moulding, finishing including all material labour T&P etc. required for proper completion of the work as per direction of Engineer-in-charge.

44.8

1520

68096

... More
Supply and fixing of BRC Jali of 10x6 gauge 2.5 cmx 7.5cm size including cutting welding and wastage etc. as per direction of Engineer-in-charge including supply of all materials labour and T&P etc. complete.

28

700

19600

... More
Supply and fixing of Accralic letter with lightin including all matyerial labour T&P etc, required for proper completion of the work as per direction of Engineer-in-charge.

44

5000

220000

... More
Plantation work with supply of plants including all labour T&P etc. required for proper completion of the work as per direction of Engineer-in-charge.

1

10000

10000

... More
Supply and fixing of Inaguration BG stone including all material labour T&P etc. required for proper completion of works as per direction of Engineer-in-charge.

1

20000

20000

... More
Provision for Electrification Work

1

35666

35666

... More
Add GST

1

239870

239870



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.