Municipal Corporation Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Municipal Corporation - MMC Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date3 Jan 2025
Closing Soon10 Jan 2025
Tender Amount₹ 11,37,858
Costs
EMD
₹ 56,893Document Cost
₹ 2,360Tender Fee
Refer Documents
Summary
Construction Work Of Drain And Road By Cc In The Streets Of Haji Siraj, Haji Tavarez, Haji Savir, Haji Saeed In Ward 80, Dhwai Nagar Street No. 4.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NNMEE_988508_41Tender No
6379/SNV-149T/2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://meerutnagarnigam.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work
23.19
2930
67952.56
... More
M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including suopply of all material labour, T &P etc. required for proper completion of the work.
57.31
4600
263630.6
... More
Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I.
9.23
5650
52161.93
... More
12 mm thick plaster with cement and approved coarse sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work.
236.38
160
37820.8
... More
S/stacking of 22-4 -53 mm size stone ballast
42.82
1991
85255.22
... More
Consalidation of stone ballast excluding of roller charges
42.82
115
4923.84
... More
construction of un reinforced. with out Dowel jointed at expansion and construction joint only, plain cement concrete pavement,thickness as per design,over a prepared sub base with 43grade cement or any other type as per clause 1501.2.2 coarse and Fineaggregates confirming to IS 383 maximum size of coarseaggregate not exceeding 25 mm,mixed in a concrete mixer og not less then 0.2 cum capacity and appropriate weinght batcher using approved mix desing, laid in approved fixed side form work ( steel channel,laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrele with shovels. rake compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraclion and expansion, construction jointsas per norms, applying debonding strips primer, sealant,dowel bars, near approaaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14 day, curing compound ( where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 including cost of polythene sheet and dowel bar and also including complete shifting of matrials @concrete when thikness of cc is less then 20 cm(without dowel bar) m-30
80.28
6800
545904
... More
R.C.C. 1:1.5:3 in cement corse sand and ston grit. As SIN 284(A)
4.2
7300
30660
... More
M. s.(Tor steel or plain) in plain work such as R c c or R B work in cluding bending.
3.3
8728
28776.22
... More
S/ fixing sign board all Camplete
1
3000
3000
... More
Deduction Cost of old Interlocking Tiles
5459.04
-3
-16377.12
... More
Deduct cost of old bricks S.I.N,1(A)
2264.97
-5
-11324.83
... More
Deducti cost of old brick bats S.I.N 1(F)
11.49
-800
-9191.17
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%