If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Municipal Corporation - MMC Tender
Civil And Construction
Eprocure
Opening Date3 Jan 2025
Closing Soon10 Jan 2025
Tender Amount₹ 5,65,239
Costs
EMD
₹ 28,262Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Ward-87, Zakir Colony, South Fatehullahpur Road, Construction Work Of Drain And Road Through Cc From Abdul Qasims House To Shahnawaz And Anwars House To Samads House.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NNMEE_988508_50Tender No
6379/SNV-149T/2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://meerutnagarnigam.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work filling including 12Km lead
166.78
307
51283.31
... More
Concrete with 4 cm. gauge Brick Ballast fine sand of 1.25 F.M. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work SI no.273.
28.59
2930
83768.7
... More
M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work S.I No.305 a
25.94
4600
119315.72
... More
12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc. SI No.584 (A)
116.6
160
18656
... More
Cement Concrete with 2.0 cm. gaug;e Approved stone grid coarse sand & cement in the proportion of 4:2:1 including , T&P etc. S.I. 279 (a)
3.9
5650
22039.52
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Slab excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire.
1.33
7300
9723.6
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.
1.05
8728
9126.17
... More
Construction of un-reinforced, without dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and Dowel bar and also including complete shifting of matrials & Concrete etc.(M-30) but when thikness of CC is less then 20 cm. (without dowel Bar)
36.51
6800
248268
... More
S/ fixing sign board
1
3000
3000
... More
Deduction cost of old bricks
1014
-5
-5070
... More
Deduction cost of old bricks bats
5.12
-800
-4095.84
... More
Deduction cost of old bricks bats
1533.42
-3
-4600.26
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%