Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 9,97,560 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Class-150 (Non Modular) brick work in 1:4 Cement and Fine sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (Fine sand not less than in 1.25 FM) (PWD SOR 2022-23 Chapter No-06 Item No. 6.1 A spec. No. 6.1.1 A)

4.14

20907

5050

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate)

66.5

228826

3441

... More
RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1 )

1.93

15440

8000

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering,huttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (CHAPTER-5 DSR/ PWD SI. No. 5.2)

2.1

17220

8200

... More
CEMENT CONCRETE PAVEMENT(C.C ROAD) Construction of unreinforced cement concrete road with cement, coarse sand and stone grit and fixing of 125 micron thick polythene film, ..... …………….Complete CHAPTER- 20 (New Item)

78.6

565920

7200

... More
R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (PWDSOR 2022-23 Chapter No-05 Item No. 5.1spec. No. 5.1.3)

0.66

4917

7450

... More
M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (Sl No. 504)

2.4

16704

6960

... More
Supply and fixing Manak board ……….. All Complete.(As per Analysis for rate)

1

4590

4590

... More
Construction of Inauguration / Silla patt board using brick work and granite stone ………….. All Complete.(As per Analysis for rate)

1

10380

10380

... More
Add 18 % G.S.T

1

152130

152130.12



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.