Moradabad Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Moradabad Development Authority Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date11 May 2022
Closing Date19 May 2022
Tender Amount₹ 41,97,815 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC work with cement approved coarse sand and 2cm (3/4")gauge approved stone ballast in the proportion 1:1½:3 (1 cement : 4½ aggregates) including necessary centering & shuttering excluding supply of reinforcement and its bending the same with 24 BWG GI binding wire and necessary centering & shuttering excluding supply of reinforcement and complete. (FOR COLUMN)

44

-

8050

... More
R.C.C work with cement,approved coarse sand & 2 cms. gauge approved crushed stone grit in proportion of 1 :1.5 :3 in lighter beam excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. (S.I. No.285+rate diff./UPPWD SOR-2020)

39

-

7800

... More
M-150 brick work in 1:4(one part of cement and four part of fine sand of 2.2.M) cement mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of work. (S.I. No 307/2020

40

-

4800

... More
M-150 Class brick work in 1 : 4 (one part cement & four part of coarse sand of 2.75 F.M.) mortar in super structure including necessary cutting & moulding of bricks as required thickness of walls 4.5" (one brick) including supply of all materials,labour, T&P required for proper completion of the work. S.I. 307(A)+309/UPPWD SOR-2020

123

-

5315

... More
M-150 Class brick work in 1 : 4 (one part cement & four part of coarse sand of 2.75 F.M.) mortar in super structure including necessary cutting & moulding of bricks as required thickness of walls 4.5" (Half brick) including supply of all materials,labour, T&P required for proper completion of the work. S.I. 307(A)+309+310(a)/UPPWD SOR-2020

25

-

5415

... More
12 mm. thick plaster with 1 : 4 (one part cement & Four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cms. Including supply of all material , labour , T & P etc. required for proper completion of the work. ( S.I.No.584)/2020

2302

-

180

... More
M.S (Tor steel or plain) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend hooks and authorised overlapping shall be measured.(S.I. No. 504/UPPWD SOR-2020

193

-

6100

... More
Mild steel or iron work in heavy sizes as window and door frame including cost of hinges and including supply of all material, labour, T&P required for proper completion of work.(SI.No. 502 B)/UPPWD SOR-2020

19

-

6500

... More
Dismentling brick work or stone work in lime in cement mortor & including stacking of material as directed by E/I. with a distance 60mt. (200fit).

145

-

75

... More
Finishing walls with superior quality water proof cement paint of approved make and quality on new work with two coats of give even shade i/c priming coat, preparing surface with appling putty the througly cleaning and sand preparing and supply of all materials, labour and T&P etc. requried for proper completion of the work . (P.S. rate)

2570

-

73

... More
Painting two coats over one priming coat on wood or steel and other metal surface with superior synthetic enamel paint of standarad make brushing to give an even shade and finish and including cleaning the surface of all dirt dust and other foreign matter, sand papering and stripping including cost of all materials, labour,T&P etc. required for proper completion of work.[CH-15 p.35,36 S.I. 1A+2+4(3)/UPPWD SOR-2020

65

-

80



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.