Moradabad Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Moradabad Development Authority Tender

Works
Civil And Construction
Eprocure
Opening Date19 May 2018
Closing Date30 May 2018
Tender Amount₹ 1,15,63,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply & Laying of stone ballast 40-63mm size including staking all taxes all complete as per direction of E/I/

302

-

1820

... More
Supply and stacking of 22.4-53mm. Hard stone ballast at site proper complition of the work as per direction of E/I. P.S.

241.5

-

1847

... More
Supply and stacking of 5.6mm and below scrinning material for bindng of stone. Including supply of all material, T&P and labour for proper completion of work as per direction of engineer Incharge. P.S.

121

-

1901

... More
Consolitdation of stone ballast by 8-10 ton road roller including opening out stacks, sorting in to proper sizes. Repairing patches in existing road, spreasing the material, making madhi, carraige of mattel up to 30m, supply and maintenance of barriers, caution post, light at night, carraige of water up to 200m including all labour and T&P etc 15 cm thick. 755(a)/17-18

302

-

190

... More
Consolitdation of stone ballast by 8-10 ton road roller including opening out stacks, sorting in to proper sizes. Repairing patches in existing road, spreasing the material, making madhi, carraige of mattel up to 30m, supply and maintenance of barriers, caution post, light at night, carraige of water up to 200m including all labour and T&P etc 12 cm thick. 755(b)/2017-18

241.5

-

180

... More
Supply & Laying of 80 mm thick precast cement concrete I shaped paver block with a top layer of minimum 8mm thickness having plan dimension 200 x(160+120) of O.P. cement, smooth high gloss finish, skid reditant. Manufactured from rubber moulds threw vivro - compression machanism. The compressive strength of concrete paver blocks shall not be less than 30 MPa & 5 kg/no. confirming to IS:15658-2006 with a 4cm thick layer of fine sand including cost of all materials, labour T&P etc. required for proper completion of the work as per direction of E/I.(Red colour hingh quaility pigment/lanxess, bayer chemicals) New Item-5 on page 51 SOR 2017-18 (A) Gray Colour

1750

-

830

... More
(B) Red/Yellow Colour

260

-

900

... More
Prepartion of sub grade for laying 40mm gauge dry brick ballast including cutting, filling upto 10cm depth & dressing of surface and also including making of slopes as per direction of E/I. including all labour T&P etc. required for proper completion of the work. (A.R.)

650

-

4.5

... More
P/L of dry brick ballast with sand including all labour, Materials, taxes, cartage and T&P etc. complete of work as per direction of E/I. SOR 2017-18/New item 3 Page-23

65

-

1100

... More
Cement concrete with 2 cm. gauge approved stone grit, coarse sand and cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work.(SI.No.279A )/2017-18

52

-

6200

... More
Part- B Drain work

-

-

-

... More
Excavation in foundation in ordinary soil (loam,clay or sand ) including lift upto 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer In-charge upto a distance of 30 meters from the foundation trenches. (S.I NO. 251 ) UPPWD SOR-/2017-18

215

-

90

... More
Concrete with 4 cm. gauge stone ballast, fine sand of 1.25 F.M and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work.( S.I NO. 281)/2017-18

37.5

-

5200

... More
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in raft foundation, footings excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. S.I. 287+diff.//2017-18

31.5

-

6450

... More
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in coloumns & walls excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. S.I. 289//2017-18

45

-

8000

... More
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. S.I. 284A/2017-18

3.5

-

7650

... More
M.S ( Tor steel or plain ) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend hooks and authorised overlapping shall be measured. (S.I.No. 504)//2017-18

75.5

-

5600

... More
Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000 x 450 x 50mm, reinforced with 8mm dia four nos longitudinal & 9 nos cross sectional TMT hoop bars, including providing 50mm dia perforations @ 100 to 125 mm c/c including providing edge binding with M.S. flats of size 50mm x 1.6mm complete, all as per direction of Engineer-in-charge. DSR 2016/23.9

560

-

959.35

... More
Concrete with 2 cm. gauge stone grit, coarse sand of 2.75 F.M and cement in proportion of4:2:1 including supply of all material, labour, T&P etc. required for proper completion of the work. S.I. No. 279(a)/2017-18

1.5

-

6200

... More
PART-C- SEWER LINE

-

-

-

... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50M. And lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in=charge upto a distance of 30M fromthe foundation trenches.

-

-

-

... More
up to 1.50 m depth PWD-251

410

-

129

... More
1.50 m to 3.00 m depth PWD-254a

15

-

157

... More
Open timbering in trenches including strutting and shoring complete. (Measurement to be taken of the face area timbered)

-

-

-

... More
Depth 1.5 to 3.00 meter DSR 2.20.2

15

-

60

... More
Concrete with 4 cm. gauge stone ballast, coarse sand of 2.75 F.M and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work.(S.I NO. 281/2017-18)

43.6

-

5200

... More
Cement concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 1:2:4 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SOR 279/2017-18

76

-

6100

... More
Providing and laying 300mm dia Non pressure NP 3 class RCC pipe with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1cement : coarse sand ) including testing of joints etc. complete. (0.00-1.50m)

390

-

1130

... More
Construction of brick masonary house connection chamber of size 60 x60 x90 cms.(Internal). with M150 brick work in 1 : 4 cement and coarse sand mortar and plaster with 1 : 3 cement and coarse sand including 8 cms. thick cement concrete 1 : 5 :10 including 2.5 cms. thick plain cement concrete and precast R.C.C. cover in 1:2:4 8 cm. thick including supply of all material labour and T & P etc. required for proper completion of the work. (A/R)

15

-

5970

... More
Construction of brick masonary chamber of size 120x90x120 cms.(Internal). with M150 brick work in 1 : 4 cement and coarse sand mortar and plaster with 1 : 4 cement and coarse sand including 10 cms. thick cement concrete 1 : 5 :10 including 2.5 cms. thick plain cement concrete floor & cunit, 15 cm. thick precast R.C.C. cover in 1:2:4 including supply of all material labour and T & P etc. required for proper completion of the work. (A/R)

39

-

16440

... More
Regulation of Shafts i/c Supply of all materials, labour and T & P etc. required for proper completion of the work.

-

-

-

... More
(A) 60 x 60cm internal size shaft

2

-

4770

... More
(B) 120 x 90 cm internal size shaft

3

-

7165

... More
P/L 110mm dia PVC pipe for connecting draining water into mainhole/chamber or in exiting drains. (P.S.R.)

204

-

236.5

... More
PART-D- SEPTICK TANK & SOAK WELL

-

-

-

... More
Excavation in foundation in ordinary soil (loam,clay or sand ) including lift upto 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer In-charge upto a distance of 30 meters from the foundation trenches. (S.I NO. 251 ) UPPWD SOR-/2017-18

-

-

-

... More
(a) 0-1.50 mt

177.5

-

90

... More
(b) 1.50-3.00

163

-

102

... More
( c) 3.00-4.50

24

-

114

... More
Open timbering in trenches including strutting and shoring complete. (Measurement to be taken of the face area timbered)

-

-

-

... More
Depth 1.50 to 3.00 meter DSR 2.20.2/2016

64

-

60

... More
Close timbering

-

-

-

... More
(a) 1.5-3.00 mt. depth DSR 2.16.2/2016

47.1

-

115.05

... More
(b) 3.00-4.50. depth DSR 2.16.3/2016

9.42

-

129.8

... More
Concrete with 4 cm. gauge stone ballast, coarse sand of 2.75 F.M and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work.( S.I NO. 281/2017-18

11.5

-

5200

... More
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in raft foundation, footings excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. S.I. 287+diff./ 2017-18

18.5

-

6450

... More
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in columns & walls excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. S.I. 289/2017-18

42.5

-

8000

... More
M-150 brick work in 1:6(one part of cement and six part of coarse sand of 2.75.M ) cement mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of work. (S.I. No 307A )/2017-18

31.35

-

4650

... More
Supply & filling of over brun brick bats in soakwell.

48

-

770

... More
Supply & filling of 40mm gauge over brun brick ballast in soakwell.

48

-

990

... More
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in plinth beams or lighter beams excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work.S.I. 285+diff./2017-18

3.75

-

7850

... More
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. S.I. 284A/2017-18

15.5

-

7650

... More
M.S ( Tor steel or plain ) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend hooks and authorised overlapping shall be measured. (S.I.No. 504)/2017-18

94

-

5600

... More
S/F of precast RCC main hole covers 560mm internal dia With frame etc complete in all respect. DSR 19.19.4/2016

8

-

1655.2

... More
S/F of PVC coatted foot rest DSR 19.16/2016

18

-

327.9

... More
PART-E- WATER LINE

-

-

-

... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift up to 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into plinth and removal and disposal of surplus earth as directed by Engineer incharge upto a distance of 30 meters from the foundation trenches (S.I. No. 251)/2017-18

265

-

90

... More
S/F of 110mm dia PVC ISI make pipe joints including cost of pipe coupling sockets sales taxes excise duty insurance and transportation upto desinated place P.V.C. pipe with shocket and tested for 6.00 kg/cmsq I.S.I marked.

-

-

-

... More
A- 110mm dia

120

-

236.5

... More
B- 80mm dia

264

-

150

... More
Providing & fixing 25 mm dia C.P.V.C. Pipe ISI marked complete with C.P.V.C.specials such as bends, tee, socket, cross, clamps etc, Earth work i/c. filling the trenches etc, required for the proper completion of the work. the rate also includes concealed C.P.V.C. fitting where required, cutting &making good the walls etc. including supply of all materials , labours, T&P. etc DSR- 18.9.3/2016

-

-

-

... More
A-25mm dia DSR 2016/18.9.3

75

-

191.65

... More
Supply of following P.V.C. fittling I.S.I marked of 10kg/cmSq bearing pressure inlcuding sales tax excise duty etc.

-

-

-

... More
A (i)- TEE 160x160x110mm

2

-

325

... More
(ii) TEE 160x160x80mm

3

-

275

... More
B-(i) Reducer 110x80mm

2

-

39

... More
C- END CAP(i) - 80MM

5

-

35

... More
D- BEND(i)- 80MM

2

-

55

... More
Supply of following size sluice valve I.S.I marked.

-

-

-

... More
A- 110mm dia

2

-

2350

... More
B- 80mm dia

3

-

1950

... More
Supply of 80mm dia fire hydrant I.S.I marked

3

-

1000

... More
Supply of Air valve as per direction of engineer in charge.

4

-

1000

... More
Fixing of Air valve with necessary nuts and bolts as per direction of E/I

4

-

75

... More
Fixing of fire hydrent & sluice valve with necessary nuts and bolts as per directin of E/I

5

-

100

... More
Construction of brick masonary house connection chamber of size 900x900x1000 mm.(Internal). with M150 brick work in 1 : 4 (1 cement and 4 coarse sand) for sluice valve, with C.I. surface box 100mm top dia, 160mm bottom dia & a180mm deep (inside) with chainded lid and RCC top slab 1:2:4 mix i/c necessary excavation, foundation concrete 1:5:10 (1cement 5 fine sand 10 graded stone aggregate 40mm nominal size) and inside plastering with cement mortar 1:3 (1cement 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design. DSR 2016/18.34.1

5

-

11842.75

... More
Construction of brick masonary house connection chamber of size 60x60x75 cm (Internal). with M150 brick work in 1 : 4 (1 cement and 4 coarse sand) fire hydrants/air valves, with C.I. surface box 100mm top dia, 160mm bottom dia & a180mm deep (inside) with chainded lid and RCC top slab 1:2:4 mix i/c necessary excavation, foundation concrete 1:5:10 (1cement 5 fine sand 10 graded stone aggregate 40mm nominal size) and inside plastering with cement mortar 1:3 (1cement 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design. DSR 2016/18.36.1

7

-

6529.7

... More
Supply of solvent for jointing of PVC pipe.

5

-

150

... More
Making water Connection of G.I. pipe line with G.I. mains (25 to 40mm) dia by providing and fixing brass ferruel 25mm dia G.I. Union and G.I. nipple including cutting and threading the pipe inspection testing cutting and makin good the road excluding bond with nagar palika fixing of pipe line upto the point near the building complete work including supply of all materials labour t&p etc. required for proper completion of the work. DSR 18.13.1/2016

176

-

394.15

... More
PART-F- PARK WORK

-

-

-

... More
Excavation in foundation in ordinary soil (loam,clay or sand ) including lift upto 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer In-charge upto a distance of 30 meters from the foundation trenches. (S.I NO. 251 ) UPPWD SOR-/2017-18

31

-

90

... More
Concrete with 4 cm. gauge stone ballast, coarse sand of 2.75 F.M and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work.( S.I NO. 281)/2017-18

3.5

-

5200

... More
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in raft foundation, footings excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. S.I. 287+diff./2017-18

14

-

6450

... More
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in coloumns & walls excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. S.I. 289/2017-18

2.75

-

8000

... More
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in plinth beams or lighter beams excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. S.I. 285+diff./2017-18

5

-

7850

... More
M.S ( Tor steel or plain ) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend hooks and authorised overlapping shall be measured. (S.I.No. 504)S.I. 289/2017-18

30

-

5600

... More
Mild steel or iron work in heavy sizes as window and door frame including cost of hinges and including supply of all material, labour, T&P required for proper completion of work.(SI.No. 502 (c)/UPPWD SOR-2017-18

5.7

-

5900

... More
6 mm. thick plaster with 1 : 3 (one part cement & three parts of coarse sand of 2.75 F.M. ) over RCC surface minimum thickness not to be less than 5mm & Including supply of all material , labour , T & P etc. required for proper completion of the work.DSR 13.16.1/20016

52

-

143.8

... More
Painting two coat on Plaster surface and steel with superior synthetic enamel paint of standard make brussing to give even shade and finished and including cleaning the surface all dust and other foreing matter sand preparing and stripping including cost of material and scoured with wire burshes fine steel/wood scrubed sand preparing and including coat of all and supply of all materials, labour and T&P etc. Required for proper completion of the work (1a+2+4(3) New item chapter 15 Page 41-42/2017-18

16

-

65

... More
Finishing walls with superior quality water proof cement paint of approved make and quality on new work with two coats of give even shade i/c priming coat, preparing surface with appling putty the througly cleaning and sand preparing and supply of all materials, labour and T&P etc. requried for proper completion of the work .(SI.No. 660+661/UPPWD SOR-2017-18

52

-

66

... More
PART-G- Boundry Wall Repairing & Construction

-

-

-

... More
Excavation in foundation in ordinary soil (loam,clay or sand ) including lift upto 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer In-charge upto a distance of 30 meters from the foundation trenches. (S.I NO. 281 ) UPPWD SOR-/2017-18

47

-

90

... More
Concrete with 4 cm. gauge stone ballast, fine sand of 1.25 F.M and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work.( S.I NO. 281)/2017-18

8

-

5200

... More
M-150 brick work in 1:4(one part of cement and four part of coarse sand of 2.75.M ) cement mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of work. (S.I. No 307A)/2017-18

60

-

4650

... More
Cement concrete with 2 cm. gauge approved stone grit, coarse sand and cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work.(SI.No.279A )/2017-18

12.5

-

6200

... More
M-150 brick work in 1:4(one part of cement and Four part of coarse sand of 2.75.M ) cement mortar in Super sturucture and plinth including supply of all material, labour, T&P etc. required for proper completion of work. (S.I. No. 307A+309+310)/2017-18

105

-

5120

... More
12 mm. thick plaster with 1 : 4 (one part cement & four parts of coarse sand of 2.75 F.M. ) over brick work minimum thickness not to be less than 1 cm & Including supply of all material , labour , T & P etc. required for proper completion of the work. ( S.I.No.583)/2017-18

1220

-

170

... More
Extra for labour & material for rough face plaster. S.I. No. 596/2017-18

403

-

13

... More
Finishing walls with superior quality water proof cement paint/snowcem of approved make and quality of new work with two coats of give even shade i/c preparing surface by the througly cleaning and sand preparing and supply of all materials] labour and T&P etc. requried for proper completion of the work. (S.I.No. 660+661/UPPWD SOR-2017-18)

1220

-

66

... More
Finishing walls with one coat of water proof cement paint/snowcem of approved make and quality on previouly old treated surface with this paint to give and even shade including supply of all materials labour and T&P etc. requried for proper completion of the work. (S.I.No.662/UPPWD SOR-2017-18)

50

-

26



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.