If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Moradabad Development Authority Tender
Civil And Construction
Road Construction
Eprocure
Opening Date19 Jul 2024
Closing Date7 Aug 2024
Tender Amount₹ 4,45,83,625
Costs
EMD
₹ 8,91,700Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MDA_939387_1Bid Award Id
ViewTender No
03/MDA/CE/2024-25Tender Authority
Moradabad Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and applying Primer Coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
8250
269115
32.62
Providing and laying Dense Graded Bituminous Macadam with higher capicity batch type HMP using crushed aggregates of specified grading, premixed with 60/70 (VG-30) bituminous binder @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects.
619
6624538
10702
Providing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg/sqm on prepared bituminous surface cleaned with mechenical broom
8250
94875
11.5
Providing and laying Bituminous Concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with 60/70 (VG-30) bituminous binder @ 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507 complete in all respects
413
4839121
11717
Providing and applying 2.5 mm thick road marking strips retroreflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. DSR-2021/16.62
413
218984
530.23
Supply & Laying of Cat's eye complete
250
81000
324
M-150 brick work in 1:4 (one cement and four coarse sand of 2.25 F.M. mortar) in foundation and including supply of all material and T &P etc. required for proper completion of work. (S.I. 307A)
273
1351350
4950
12 mm. thick plaster with 1 : 4 (one part cement & Four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cms. Including supply of all material , labour , T & P etc. required for proper completion of the work. ( S.I.No.584)
770
146300
190
Applying primer coat on plaster surface and paintng first two coat over prime coat with superiour synthatic enamel paint of stantdard make brushing to give an even shade and finished and including cleaning the surface all dirt, dust and foreign matter sand papring and strippping including cost matter and scoured with wire brushed fine steel/wood scappers sand parering and knotting including coat of all and supply of all meterial, labour and T&P S.I. No New Item 1(B)+2+4(iii)
1045
85690
82
Supply & Laying of 80mm thick Interlocking Tile I-Shape interlocking pavar block a with top layar of minimum 8mm thikness having plan dimension 200x(160+120mm) of O.P. cement, Smooth high class finish skid reditant manufactured rubber moulds through vibro-compression machanism. The compreddive strength of concrete pavar block shall not be less than 30 MPa (M-30) and wight 5kg per no confirming to IS: 15658-2006 including cost of material, labour T&P etc. required for proper completion of the work as directed by Engineer-in-charge. including laveling and dressing of surface to required lavel and slope, filling joints with local sand including the cost of all labour T&P etc. (1) Grey color (2) Red color complete but excluding. but excluding UP. VAT: Additional S.I. No. 51/P51 SOR 2022
3520
3168000
900
P/L in Cement Concrete4:2:1 of not less than strength of M-150 stone ballast (20mm normal size) :2 approved coarse sand:1 cement ) and curing complete including cost of form work supply of all material lab T&P etc all complete.(SI.No-279 A.)
7
46900
6700
Drain work
Concrete with 4 cm. gauge stone ballast, coarse sand and cement in proportion of 1:4:8 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work.( S.I NO. 281/CH-5/2022
110
632500
5750
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge approved crushed stone grit in proportion of 1:1.5:3 in footing & raft excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. ( S.I NO. 287 SI. 283A-283/22
132
950400
7200
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in Wall (Considering lighter beam) excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. ( S.I NO. 285 CH-5/22)
159
1335600
8400
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. S.I. 284A/2022
10
83000
8300
M.S ( Tor steel or plain ) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend hooks and authorised overlapping shall be measured. ( S.I NO. 504 CH-10)/2022
307
2517400
8200