Moradabad Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Moradabad Development Authority Tender
Civil And Construction
Eprocure
Opening Date14 Aug 2019
Closing Date19 Aug 2019
Tender Amount₹ 25,28,000
Costs
EMD
₹ 51,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_MDA_371684_6Bid Award Id
ViewTender No
207(IV)/ MDA/ Udhyaan/2019 Dt. 09-06-2019 SBTender Authority
Moradabad Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
M-150 brick work in Superstructure 1:4 (one cement and four coarse sand) including necessary cutting and moulding of brick and requried thickness of walls not to be less than 1.5 brick. SI 307+309+310 2017-18
7.62
39014
5120
M-150 brick work in half brick thick wall insuper structure in 1:3 (one cement and three coarse sand mortor) supply of all materials, labours and T&P etc required for proper compltion of the work . S.I 307 + 309 +310(a) 2017-18
2.6
13494
5190
Concrete with 2cm. Guage stone ballast fine sand of 1.2:5 :M. and cement in proportion of 1:2:4 in foundation and under floors including supply of all meterials, labour and T&P etc. required for proper completion of work. SI No. 279-A 2017-18
3.2
19840
6200
Dismantling existing plaster including disposal of refuse as directed by the Engieer-in-charge with in a distance of 60 meter (200 feet). SI no. 706 SOR- 17-18
872.4
21810
25
12mm thick plaster with (1:4) One part of cement and Four part of approved fine sand including supply of alla material labour and completion of work . SI.No.- 584A 2017-18
1034
144760
140
Cleaning jungle including up rooting of rank vegetation grass, bush, wood tree annd sopling girth up to 30 Cms measured at the hight of 1 m above groune lavel and removed of rubbish upto a distance of 50 m outside the periphery of area cleared. (SOR) S.i.No -259-2017-18
4324
11891
2.75
Earth work filling including supply of all necessary quality good earth also including 8 Km. from the site of work. 2.5,2.6,2.7,2.8,2.9-86 SOR 2017-18
1945
558215
287
Finishing wall with three coat of water proufe cement paint snowecem of approved make and quality of new work with three coat to give and even shade inculding priparing surface by the throughly cleaning and send preparing and supply of all material laber and t&p etc. required for proper completion of the work. SI.No.(660+661)2017-18
872.4
57578
66
Rough dressing the trenched ground including breaking clods.item No. 2.5 DSR 2018
4050
5265
1.3
Uprooting weeds from the trenched area after 10 to 15 days of its floodingwith water including disposal of uprooted vegetation .DSR 2.6-2018
4050
17415
4.3
Fine dressing of the ground..item No. 2.7 DSR 2018
4050
13162
3.25
Supplying & Stacking of Selection No. 1/ grass at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc. and as per direction of officer in charge. item No. 2.35 DSR 2018
3784
192227
50.8
Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and /or good earth to be paid separately).item No. 2.8 DSR 2018
405
18690
46.15
Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge .item No. 2.9 DSR 2018
405
13000
32.1
Supplying of stacking of well decayed cattle manure at site including royalty and carriage upto 5 k. m. lead complete (cattle manure measured in stack will reduced by 8% for payment). Item No. 2.25 DSR-2018
95
21892
230.45
Supply of anti termite (methgl para thian) & used as per disection in charge of the work.
378
9450
25
Providing and Stacking of Clerodendrum inerme having ht. 25 cm to 30 cm multi branched in 20 cm size of earthen pot/plastic pot & as per direction of the officer-in-charge.item No. 6.6 DSR 2018
3494
35813
10.25
Grassing with selection No. 1/ grass including watering and maintenance of the lawn for 30 day or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplyng good earth, if needed (the grass and good earth shall be paid for separately).item No. 2.10 DSR 2018
3784
58841
15.55
P/L 60mm thick power black m. 30 in path area with 25mm five sand for cuting and filling joints top of paver. Item No.16.68 DSR 2018
540
385160
713.26
Supply and fixing benches made out 1" dia from tubler pipe 50X12 mm pipe and beautifully painted (A.R.) r As per drying Attched
16
65600
4100
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, hedge, flower beds, foliages, creepers etc. For one Year including hoeing, weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the Department & lawn mover and brush cutter with fuel, other T & P material / articles shall be provided by the contractor.) and as per direction of officer in charge.item No. 2.40.5 DSR 2018
3784
102168
2.25
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements