Moradabad Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Moradabad Development Authority Tender
Civil And Construction
Eprocure
Opening Date3 Jan 2022
Closing Date8 Jan 2022
Tender Amount₹ 29,16,562
Costs
EMD
₹ 58,400Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MDA_670025_1Bid Award Id
ViewTender No
42/MDA/CE/21-22Tender Authority
Moradabad Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and applying Tack coat with bitumen 80/100 (V-10) on prepared surface of granular Base including cleaning of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.
1280
-
54.5
Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with 80/100 (VG-10) bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (Bitumen@ 3.3 per cent of mix)
64
-
8385
Providing and applying Tack coat with bitumen 80/100 (V-10) on prepared surface of bituminious/granular Base including clearing of road surface and spraying primer at the rate of 0.30 kg/sqm using mechanical means.
1280
-
17.6
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with 60/70 (VG-30) bituminous binder @ 5.00 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
51.2
-
11229
Brck edging on both sides of the road of first class(M150) BRICK ON EDGE laid with mud mortar including labour and supply of bricks finshed to the required templete and in proper alingement and also including dressing and rammingtheexcavated earth as directed by the ingineer incharge. SI No. 765/Chapter 20 SOR-2020
640
-
59.5
PART- B (CONSTRUCTION OF CULVERT)
Excavation in foundation in ordinary soil (
Loam, clay or sand) including lift upto 1.50M. And lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M fromthe foundation trenches. S.I. No. 251/SOR-2020
21.6
-
110
Concrete with 4 cm. gauge stone ballast, fine sand and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work.( S.I NO. 281 CH-5)/SOR-2020
5.4
-
5500
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge approved crushed stone grit in proportion of 1:1.5:3 in footing & raft excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. ( S.I NO. 287 CH-5)/SOR-2020
4.68
-
6500
R.C.C. work with cement approved coarse sand & 2cms(3/4") gauge stone grit in proportion of 1:1.5:3 in beem & WALLS excluding supply of reinforcement and its bending but including its fixing & binding the same with 24BWGGI Binding wire & including necessary centering & shuttering etc. & and also including supply of all material labour T&P etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. ( S.I NO. 289 CH-5)/SOR-2020
7.2
-
7800
RCC work with cement approved coarse sand and 2cm (3/4")gauge approved stone ballast in the proportion 1:1½:3 (1 cement : 4½ aggregates) in slabs including necessary centering & shuttering excluding supply of reinforcement and its bending the same with 24 BWG GI binding wire and necessary centering & shuttering excluding supply of reinforcement and complete. ( S.I NO. 284(a) CH-5)/SOR-2020
6.24
-
7700
M.S ( Tor steel or plain ) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend hooks and authorised overlapping shall be measured. ( S.I NO. 504 CH-10)/SOR-2020
14.22
-
6100