Minor Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Minor Irrigation Department Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date21 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 16,18,000
Costs
EMD
₹ 1,35,000Document Cost
₹ 944Tender Fee
Refer Documents
Summary
Under Cmlsy Construction Of 05 No. Rooftop Rain Water Harvesting System In Tahsil Sadar, District- Lucknow.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPMID_967125_3Bid Award Id
ViewTender No
17/EE/2024-25Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing & laying in cement concrete of specifide grade excluding the cost of centering and shuttering all work up to plinth lavel. 1:6:12 cement, Course Sand 40 mm, gauge Brick ballast including complete work. S.I.No. PWD (SCH)-273 L=(8.21-2*0.6/2)
17.64
4553
80314.92
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) as PER DAR No.4.1.3
7.25
6990
50677.5
... More
M-150 brick work with common burnt clay brick in foundation and plinth in 1:4 cement & C sand S.I. No. 6.1.1 L=(8.21-2*0.46/2)
42.79
6715
287334.85
... More
M-150 brick work with common burnt clay brick in super structure above plinth level in 1:4 cement & C sand S.I. No. 6.4.1
5.55
7469
41452.95
... More
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform as per DAR No.5.9.3
43.41
368
15974.88
... More
Providing & laying in position specifide grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing & reinforcement all work up to plinth lavel. In ratio 1:2:4 ( cement, C Sand, graded stone aggregate 20 mm nominal size ) S.I.No. 5.1.3
7.21
7340
52921.4
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and bending all complete up to plinth level S.I. No. 5.22.6
566.34
74
41951.46
... More
Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets,gates and similar works(Iron Chamber at top of Filter Tank) as per DAR no 10.25.2
98.55
95
9362.25
... More
12 mm thick cement plaster of mix. In Ratio 1:4 (1 cement and 4 coarse sand ) S.I. No. 13.4.1
240.88
186
44803.68
... More
Neat Cement Punning as PER DAR NO 13.18
132.75
39
5177.25
... More
Painting and slogan on filter chamber platform
5
2500
12500
... More
Filling Of Brick ballast
3.74
1450
5428.8
... More
Filling Of gravel/stone grit of size range 5mm to 10mm
3.74
3034
11347.16
... More
Filling Of Coarse sand of size range 1.5mm to 2 mm
3.74
2978
11137.72
... More
Laying of brick on flat with M150 brick
12.52
357
4475.9
... More
Cartage of extra earth work remove from site up to 3 km (as per analysis of rate)
57.83
252
14588.4
... More
Photography & sign board
5
5000
25000
... More
Laying of 110 mm PVC pipe in Tranch with proper completion of work as per engineer incharge ( 30% of pvc Pipe rate)
1
6055
6055.2
... More
Laying of 110 mm PVC pipe in Tranch with proper completion of work as per engineer incharge ( 30% of pvc Pipe rate)
1
12528
12528
... More
Laying of 110 mm PVC pipe in Tranch with proper completion of work as per engineer incharge ( 30% of pvc Pipe rate)
1
10440
10440
... More
Laying of 110 mm PVC pipe in Tranch with proper completion of work as per engineer incharge ( 30% of pvc Pipe rate)
1
6055
6055.2
... More
Laying of 110 mm PVC pipe in Tranch with proper completion of work as per engineer incharge ( 30% of pvc Pipe rate)
1
18165
18165.6
... More
Supply& Fixing of 110mm P.V.C pipe 6kgf/cm²
765
232
177480
... More
Supply of 110 mm P.V.C Socket
83
32
2656
... More
Supply of 110 mm P.V.C Elbow
117
65
7605
... More
Supply & Fixing of Micron nylone filter (as Per MR)
37.56
50
1878
... More
Supply & Fixing of 110 mm P.V.C support clip with gulli & screw (as Per MR)
83
25
2075
... More
Supply of P.V.C jointing solution ( tube)
15
260
3900
... More
Supply & Fixing of 110 mm P.V.C Tee (as Per MR)
46
68
3128
... More
Supply of C.I Jali 100X100mm
27
72
1944
... More
Sifting of Mechanised boring machine to work site
5
3000
15000
... More
Digging of pit for water collecting (Pit size = 3.0mX3.0mX1.00m = 9.00 m3) as per PWD DAR NO 2.6.1
45
161
7245
... More
14" Dia Drilling,Reamming & Assy. Lowering by small rig
165
547
90255
... More
Tractor Charges
50
470
23500
... More
Tankar charges
10
190
1900
... More
Labour Charges for filling of pea gravel
20
325
6500
... More
Development charge by compressor 365 C.F.M. (100 PSI)
30
1840
55200
... More
Supply of 150 mm dia Plain PVC pipe 06 kgf/cm2 with coupler AS PER PWD MAT Chap-1 Sr.No.17(29)
90
500
45000
... More
Supply of 150 mm dia perforated PVC pipe 06 kgf/cm2 AS PER PWD MAT Chap-1 Sr.No.17(29)
60
500
30000
... More
supply of 16 No & 30 No Nylon mesh Tubelar bag 3.0m X 0 .45 m (as per MR)
60
70
4200
... More
Supply of 150 mm dia PVC End cap (as Per MR)
5
175
875
... More
Pea Gravel as per Deptt Rate
12.95
6080
78736
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements