Minor Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Minor Irrigation Department - UPMID Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date20 Jun 2023
Closing Date30 Jun 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in slush and lahel including disposal of excavated slush / lahel up to 2 km. distance

19529.55

-

-

... More
Dressing of E/W on Bund (100%)

4701.38

-

-

... More
Compaction of E/W on Bund (100%)

4701.38

-

-

... More
CONSTRUCTION OF INLET

-

-

-

... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge

18.6

-

-

... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

9.27

-

-

... More
Brick work in masonary in 1:4 cement & course sand mortar

15.45

-

-

... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

28.98

-

-

... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

1.41

-

-

... More
S/F 600 mm Dia hume pipe NP-3

22.5

-

-

... More
CONSTRUCTION OF OUTLET

-

-

-

... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge

1.3

-

-

... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

2.68

-

-

... More
Brick work in masonary in 1:4 cement & course sand mortar

2.75

-

-

... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

12

-

-

... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

0.31

-

-

... More
S/F 600 mm Dia hume pipe NP-3

7.5

-

-

... More
CONSTRUCTION WORK OF RAMP

-

-

-

... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge

11.55

-

-

... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

11.25

-

-

... More
Brick work in masonary in 1:4 cement & course sand mortar

19.57

-

-

... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

21.6

-

-

... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

0.37

-

-

... More
CONSTRUCTION OF DESILTING CHAMBER

-

-

-

... More
EXCAVATION IN FOUNDATION IN ORDINARY SOIL I/C ALL COM.

45

-

-

... More
PROVIDING & LAYING CEMENT CONCRETE 1:4:8 WITH (1:CEMENT AND 4:FINE SAND AND 40 MM GAUGE BRICK BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS.

2.7

-

-

... More
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK.

13.4

-

-

... More
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.

32

-

-

... More
CEMENT CONCRETE WITH 4 CM GAUGE STONE GRIT IN C/SAND & CEMENT IN THE PROPORTION 1:2:4 INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC, REQUIRED FOR PROPER COMPLETION OF THE WORKS.

0.76

-

-

... More
M.S OR IRAN WORK OF SMALL SIZE AND SECTION I/C PROPER COMPLETION OF THE WORK (TOP COVER / ZAL AND TWO SIDE ZALI WITH OPENING ARRANGEMENT FACILITY )

4

-

-

... More
Painting roofs or othar iron work in large areas with one coat priming and one coat of approved (above one Sq.Metre) paint (British antesol or equivalent) including supply of all materials labour Tools & plants etc. required for proper completion of the work. Paint to be used ISI Marked. as per

24.02

-

-

... More
CONSTRUCTION OF FLAG HOSISTING WORK

-

-

-

... More
PROVIDING & LAYING CEMENT CONCRETE 1:4:8 WITH (1:CEMENT AND 4:FINE SAND AND 40 MM GAUGE BRICK BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS

1

-

-

... More
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK

2.81

-

-

... More
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.

3.68

-

-

... More
CEMENT CONCRETE WITH 4 CM GAUGE STONE GRIT IN C/SAND & CEMENT IN THE PROPORTION 1:2:4 INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC, REQUIRED FOR PROPER COMPLETION OF THE WORKS.

0.3

-

-

... More
SUPPLY AND FIXING OF IRON ROD 63 MM SIZE FOR FLAG HOISTING,PAINTING WORK OF FLAG HOISTING PLATFARM ETC. I/C ALL COMPLETE

4

-

-

... More
DEWATERING BEFORE AND DURING DIGGING

1022

-

-

... More
PHOTOGRAPHY AND VIDEO GRAPHY ( 03 STAGE ) BEFORE, DURING AND AFTER COMLETION OF WORK

1

-

-

... More
S/F OF M.S IRON SIGN BOARD

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.