Minor Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Minor Irrigation Department - UPMID Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date30 Jan 2023
Closing Date8 Feb 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
150 mm dia boring drilling charges etc. i/c all comp.

-

-

-

... More
0-5 M

10

-

-

... More
5-10 M

10

-

-

... More
10-15 M

10

-

-

... More
15-20 M

10

-

-

... More
20-24 M

8

-

-

... More
110 mm 6 kgf PVC plain pipe

24

-

-

... More
110 mm 6 kgf PVC perforated/slotted pipe

24

-

-

... More
110 mm PVC end cap & top cap

2

-

-

... More
Nylon cloth tubeler Bag

8

-

-

... More
Supply & Installation 150 mm dia B Class MS pipe for air vent (M.R)

2

-

-

... More
CONSTRUCTION OF PIPE LINE

-

-

-

... More
Dismantelling of interlocking tile I/C All Completc.

63

-

-

... More
Dismantelling of C.C I/C All Completc.

0.68

-

-

... More
Laying of Interlocking tiles (Labour Only)

63

-

-

... More
Providing and laying of P.C.C. 1:6:12 in cement ,Fine sand & 20 mm Brick Ballast including labour & T&P etc.

4.02

-

-

... More
Providing and laying of C.C. 1:2:4 in cement sand & 20 to 40 mm ston ballast including labour & T&P etc.

0.98

-

-

... More
Supply of P.V.C. 110 MM Dia & 6Kg/Sqm (ISI MARKED) I/C All Completc

150

-

-

... More
Carting, laying, jointing , fixing and testing of 110 mm dia P.V.C pipe with specials and fittings including cutting, fixing clamps wherever necessary etc. complete.

150

-

-

... More
Earth work in Excavation in Foundation in Dry ordinary soil including lift upto 1.5 m and upto 30 m

49.5

-

-

... More
Construction of Inlet Chamber With First class brick work in 1:4 cement, Sand, mortar. I/C All Completc

5.38

-

-

... More
RCC Work in slab of Inlet Chamber with 1:2:4 cement ,send and 10 to20mm stone grit with Main hole making including all. But excluding reinforcment.

0.26

-

-

... More
Tor steel or MS Iron work, in RCC work of slab with Main hole ,Including cost of steel ,binding of wire etc. complete.

0.24

-

-

... More
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.

60.6

-

-

... More
Painting of Recharge and Filter Tanks and All Chambers

1

-

-

... More
Roof Repairing and Damaged Completion Work and Installation of Jali at Top & Down Pipes and Minor Repairs etc. i/c all comp.

1

-

-

... More
CONSTRUCTION OF FILTER TANKS / RECHARGE TANKS

-

-

-

... More
Earth work in Excavation in Foundation in Dry ordinary soil including lift upto 1.5 m and upto 30 m

11.09

-

-

... More
Earth work in Excavation in Foundation in Dry ordinary soil including lift upto 1.5 m and upto 30 m

12.94

-

-

... More
Providing and laying of P.C.C. 1:4:8 in cement ,Fine sand & 40 mm Brick Ballast including labour & T&P etc.

1.11

-

-

... More
Providing and laying of C.C. 1:2:4 in cement sand & 20 to 40 mm ston ballast including labour & T&P etc.

0.31

-

-

... More
M 150 Brick Work in 1:4 cement, Sand, mortar. I/C All Completc.

8.49

-

-

... More
RCC Work in Slab In 1:2:4 cement ,send and 10 to20mm stone grit with Main hole making including all. But excluding reinforcment.

1.11

-

-

... More
Tor steel or MS Iron work, in RCC work of slab with,Including cost of steel ,binding of wire etc. complete.

1.04

-

-

... More
12 MM Thick Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.

36.6

-

-

... More
Supply and Laying of 25 MM Gauge Brick Ballast i/c all comp.

0.39

-

-

... More
Supply and Laying of 2-4 MM Pea Gravel i/c all comp.

0.59

-

-

... More
Supply and Laying of Coarse/Sand i/c all comp.

0.39

-

-

... More
Making Provision Of Overflow System Complete In all Respect Including Cost of all Materials.

1

-

-

... More
S/F OF M.S Iron Sign Board and Photography ( 03 Stage ) Befroe, During and After Comletion of Work

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.