If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Minor Irrigation Department - UPMID Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date28 Jan 2023
Closing Date8 Feb 2023
Tender AmountRefer Documents
Costs
EMD
₹ 26,000Document Cost
₹ 204Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPMID_770072_1Bid Award Id
ViewTender No
622(E-7/2022-23)Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
150 mm dia boring drilling charges etc. i/c all comp.
-
-
-
0-5 M
10
-
-
5-10 M
10
-
-
10-15 M
10
-
-
15-20 M
10
-
-
20-24 M
8
-
-
110 mm 6 kgf PVC plain pipe
24
-
-
110 mm 6 kgf PVC perforated/slotted pipe
24
-
-
110 mm PVC end cap & top cap
2
-
-
Nylon cloth tubeler Bag
8
-
-
Supply & Installation 150 mm dia B Class MS pipe for air vent (M.R)
2
-
-
CONSTRUCTION OF PIPE LINE
-
-
-
Dismantelling of interlocking tile I/C All Completc.
54
-
-
Dismantelling of C.C I/C All Completc.
1.35
-
-
Laying of Interlocking tiles (Labour Only)
54
-
-
Providing and laying of P.C.C. 1:6:12 in cement ,Fine sand & 20 mm Brick Ballast including labour & T&P etc.
4.02
-
-
Providing and laying of C.C. 1:2:4 in cement sand & 20 to 40 mm ston ballast including labour & T&P etc.
1.2
-
-
Supply of P.V.C. 110 MM Dia & 6Kg/Sqm (ISI MARKED) I/C All Completc
150
-
-
Carting, laying, jointing , fixing and testing of 110 mm dia P.V.C pipe with specials and fittings including cutting, fixing clamps wherever necessary etc. complete.
150
-
-
Earth work in Excavation in Foundation in Dry ordinary soil including lift upto 1.5 m and upto 30 m
49.5
-
-
Construction of Inlet Chamber With First class brick work in 1:4 cement, Sand, mortar. I/C All Completc
5.38
-
-
RCC Work in slab of Inlet Chamber with 1:2:4 cement ,send and 10 to20mm stone grit with Main hole making including all. But excluding reinforcment.
0.26
-
-
Tor steel or MS Iron work, in RCC work of slab with Main hole ,Including cost of steel ,binding of wire etc. complete.
0.24
-
-
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
60.6
-
-
Painting of Recharge and Filter Tanks and All Chambers
1
-
-
Roof Repairing and Damaged Completion Work and Installation of Jali at Top & Down Pipes and Minor Repairs etc. i/c all comp.
1
-
-
CONSTRUCTION OF FILTER TANKS / RECHARGE TANKS
-
-
-
Earth work in Excavation in Foundation in Dry ordinary soil including lift upto 1.5 m and upto 30 m
11.09
-
-
Earth work in Excavation in Foundation in Dry ordinary soil including lift upto 1.5 m and upto 30 m
12.94
-
-
Providing and laying of P.C.C. 1:4:8 in cement ,Fine sand & 40 mm Brick Ballast including labour & T&P etc.
1.11
-
-
Providing and laying of C.C. 1:2:4 in cement sand & 20 to 40 mm ston ballast including labour & T&P etc.
0.31
-
-
M 150 Brick Work in 1:4 cement, Sand, mortar. I/C All Completc.
8.49
-
-
RCC Work in Slab In 1:2:4 cement ,send and 10 to20mm stone grit with Main hole making including all. But excluding reinforcment.
1.11
-
-
Tor steel or MS Iron work, in RCC work of slab with,Including cost of steel ,binding of wire etc. complete.
1.04
-
-
12 MM Thick Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
36.6
-
-
Supply and Laying of 25 MM Gauge Brick Ballast i/c all comp.
0.39
-
-
Supply and Laying of 2-4 MM Pea Gravel i/c all comp.
0.59
-
-
Supply and Laying of Coarse/Sand i/c all comp.
0.39
-
-
Making Provision Of Overflow System Complete In all Respect Including Cost of all Materials.
1
-
-
S/F OF M.S Iron Sign Board and Photography ( 03 Stage ) Befroe, During and After Comletion of Work
1
-
-