Minor Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Minor Irrigation Department Tender
Civil And Construction
Building Construction
Eprocure
Opening Date1 Jul 2023
Closing Date10 Jul 2023
Tender AmountRefer Documents
Costs
EMD
₹ 10,214Document Cost
₹ 725Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPMID_816941_1Bid Award Id
ViewTender No
389/MIDSITAPUR/RWH/LOT2Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Package Tenders
389/MIDSITAPUR/RWH/LOT7389/MIDSITAPUR/RWH/LOT4389/MIDSITAPUR/RWH/LOT8...more
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
C.C. in 1:4:8 (1 cement:4 fine sand:8 40 mm OBB normal size) and curing complete i/c cost of formwork in foundation and floors as ID SOR ch. VI, SL.1B
5.66
22747
4018.93
Class M-150 B/W in 1:4 (cement and coarse sand) mortar in reacharge pit and small chamber at 0.35 m thick wall.
2.34
16083
6873.37
Same as item no-4 but in one brick wall.
3.74
26729
7146.88
Same as item no-4 but in less than 12 cm brick wall.
2.04
14617
7165.47
20 mm thick cement plaster in 1:4 with cement, coarse sand mortar two coat 17 mm and finished coat 3 mm thick for neat cement ID SOR ch.IX, SL.No.3
63.47
16503
260.02
R.C.C. work in 1:2:4 with cement, coarse sand and 20mm stone ballast for cover slab of reacharge pit, small chamber.
2.08
21904
10531.18
MS Iron work in RCC as in item no-5
1.63
12672
7774.72
Supply and laying 40 mm OBB for filter media
0.45
731
1625.73
Supply and laying of bricks M-150 Flat soiling in 2 number of recharge pit
2.25
814
361.88
Supply and laying of Pea-gravel (size 2mm-4mm) in Reacharge pit 2 number of recharge pit
0.54
3208
5942.13
Supply and laying of coarse sand in reacharge pit
1.01
4603
4558.33
Supply of Nylon Filter 1.18-1.40 micron mesh in 2 number of recharge pit
11.25
675
60
Supply and laying of 110 mm dia Plain PVC pipe 6 kgf/cm2 i/c all fitting work and as per directed by engineer incharge
192.1
56688
295.1
Supply and of 110 mm PVC Tee 6 kgf/cm2
32
5120
160
Supply of 110 mm PVC SOCKET 6 kgf/cm2
28
1400
50
Supply of 110 mm PVC Elbow 6 kgf/cm2
28
3360
120
Supply of solvent cement
1
300
300
C.C. work in 1:2:4 with cement, coarse sand and 20mm stone ballast i/c all complete.
6.79
71506
10531.18
Provision of sign board & photography other mis. Work
1
4200
4200
Sifting of Mechanised boring machine to work site(for 2 number of recharge pit)
2
6000
3000
Digging of pit for water collecting (Pit size = 3.0mX3.0mX1.00m = 9.00 m3)(for 2 number of recharge pit)
18
2007
111.53
Drilling of 200mmx350mm boring by small mechanised rig machine i/c lowering all complete (for 2 number of recharge pit)
72
39384
547
Tractor Charges(for 2 number of recharge pit)
20
9400
470
Tankar charges(for 2 number of recharge pit)
4
760
190
Labour Charges in mislenious work other than drilling.(for 2 number of recharge pit)
10
2130
213
Development charge by compressor 365 C.F.M. (100 PSI)(for 2 number of recharge pit)
10
18400
1840
Supply of 150 mm dia Plain PVC pipe 06 kgf/cm2 with coupler(for 2 number of recharge pit)
48
18000
375
Supply of 150 mm dia perforated PVC pipe 06 kgf/cm2(for 2 number of recharge pit)
24
9000
375
supply of 16 No & 30 No Nylon mesh Tubelar bag 3.0m X 0 .45 m (for 2 number of recharge pit)
8
472
59
Supply of PVC Strip (16 m) (for 2 number of recharge pit)
4
16
4
Supply of 150 mm dia PVC End cap (for 2 number of recharge pit)
4
700
175
Supply of solvent cement (for 2 number of recharge pit)
0.4
120
300
Pea Gravel (for 2 number of recharge pit)
5.66
36066
6372.23
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements