Minor Irrigation Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Minor Irrigation Department Tender
Civil And Construction
Excavation
Eprocure
Opening Date18 Oct 2023
Closing Date28 Oct 2023
Tender AmountRefer Documents
Costs
EMD
₹ 6,71,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPMID_852953_1Bid Award Id
ViewTender No
594(E-118/23-24)Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
EARTH WORK
-
-
-
... More
DEWATERING BEFORE AND DURING DIGGING
993
-
-
... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge
1.3
-
-
... More
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK.
20.1
-
-
... More
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.
3.68
-
-
... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
38.64
-
-
... More
PROVIDING & LAYING CEMENT CONCRETE 1:4:8 WITH (1:CEMENT AND 4:FINE SAND AND 40 MM GAUGE BRICK BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS
1
-
-
... More
PROVIDING & LAYING CEMENT CONCRETE 1:4:8 WITH (1:CEMENT AND 4:FINE SAND AND 40 MM GAUGE BRICK BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS.
4.05
-
-
... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge
24.8
-
-
... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
12
-
-
... More
S/F OF M.S IRON SIGN BOARD
1
-
-
... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
0.31
-
-
... More
CONSTRUCTION OF DESILTING CHAMBER
-
-
-
... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
43.2
-
-
... More
CONSTRUCTION OF FLAG HOSISTING WORK
-
-
-
... More
Dressing of E/W on Bund (100%)
2918.33
-
-
... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
12.36
-
-
... More
CONSTRUCTION OF OUTLET
-
-
-
... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
2.68
-
-
... More
Brick work in masonary in 1:4 cement & course sand mortar
20.6
-
-
... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
1.88
-
-
... More
Brick work in masonary in 1:4 cement & course sand mortar
2.75
-
-
... More
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.
48
-
-
... More
CONSTRUCTION OF INLET
-
-
-
... More
CEMENT CONCRETE WITH 4 CM GAUGE STONE GRIT IN C/SAND & CEMENT IN THE PROPORTION 1:2:4 INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC, REQUIRED FOR PROPER COMPLETION OF THE WORKS.
0.3
-
-
... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge
23.1
-
-
... More
Earth work in Excavation in Ordinary Soil with Poclain Machine including disposal of excavated earth up to 2 km. distance
821.91
-
-
... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
22.5
-
-
... More
M.S OR IRAN WORK OF SMALL SIZE AND SECTION I/C PROPER COMPLETION OF THE WORK (TOP COVER / ZAL AND TWO SIDE ZALI WITH OPENING ARRANGEMENT FACILITY )
6
-
-
... More
Excavation in slush and lahel including disposal of excavated slush / lahel up to 2 km. distance
30261.79
-
-
... More
EXCAVATION IN FOUNDATION IN ORDINARY SOIL I/C ALL COM.
67.5
-
-
... More
Brick work in masonary in 1:4 cement & course sand mortar
39.14
-
-
... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
0.74
-
-
... More
SUPPLY AND FIXING OF IRON ROD 63 MM SIZE FOR FLAG HOISTING,PAINTING WORK OF FLAG HOISTING PLATFARM ETC. I/C ALL COMPLETE
4
-
1
... More
Earth work in Excavation in Ordinary Soil with Poclain Machine and shifting of Excavated Soil with Tractor Trolly
7498.63
-
-
... More
Compaction of E/W on Bund (100%)
2918.33
-
-
... More
S/F 600 mm Dia hume pipe NP-3
5
-
-
... More
PHOTOGRAPHY AND VIDEO GRAPHY( 03 STAGE ) BEFORE, DURING AND AFTER COMLETION OF WORK
1
-
2
... More
CONSTRUCTION WORK OF RAMP
-
-
-
... More
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK
2.81
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements