Minor Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Minor Irrigation Department Tender
Civil And Construction
Eprocure
Opening Date30 Dec 2023
Closing Date8 Jan 2024
Tender Amount₹ 2,65,000
Costs
EMD
₹ 5,300Document Cost
₹ 650Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPMID_875381_1Bid Award Id
ViewTender No
1466/MI/B/RWHS/SITAPUR/LOT7Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Package Tenders
1466/MI/B/RWHS/SITAPUR/LOT31466/MI/B/RWHS/SITAPUR/LOT101466/MI/B/RWHS/SITAPUR/LOT4...more
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
E/W excavation for boaring pit/reacharge pit in ordinary soil as per ID SOR CH-5 S.N.-5A
22.72
2533
111.53
C.C. in 1:4:8 (1 cement:4 fine sand:8 40 mm OBB normal size) and curing complete i/c cost of formwork in foundation and floors as ID SOR ch. VI, SL.1B
4.05
16276
4018.93
Class M-150 B/W in 1:4 (cement and coarse sand) mortar in reacharge pit and small chamber at 0.35 m thick wall.
1.58
10729
6790.79
Same as item no-4 but in one brick wall.
2.52
17802
7064.29
Same as item no-4 but in less than 12 cm brick wall.
0.75
5312
7082.88
20 mm thick cement plaster in 1:4 with cement, coarse sand mortar two coat 17 mm and finished coat 3 mm thick for neat cement ID SOR ch.IX, SL.No.3
33.81
8638
255.51
R.C.C. work in 1:2:4 with cement, coarse sand and 20mm stone ballast for cover slab of reacharge pit, small chamber.
1.26
12746
10115.88
MS Iron work in RCC as in item no-5
0.99
7696
7774.72
Supply and laying 40 mm OBB for filter media
0.55
894
1625.73
Supply and laying of bricks M-150 Flat soiling in recharge pit
2.75
995
361.88
Supply and laying of Pea-gravel (size 2mm-4mm) of recharge pit
0.65
4141
6372.23
Supply and laying of coarse sand in recharge pit
1.08
4598
4258.03
Supply of Nylon Filter 1.18-1.40 micron mesh in recharge pit
12.69
761
60
Supply and laying of 110 mm dia Plain PVC pipe 6 kgf/cm2 i/c all fitting work and as per directed by engineer incharge.
192
56659
295.1
Supply of 110 mm PVC Tee 6 kgf/cm2
2
320
160
Supply of 110 mm PVC SOCKET 6 kgf/cm2
12
600
50
Supply of 110 mm PVC Elbow 6 kgf/cm2
30
3600
120
Supply of solvent cement
1
300
300
Supply of C.I.Jali 110x110 mm
30
1050
35
C.C. work in 1:2:4 with cement, coarse sand and 20mm stone ballast i/c all complete.
3.44
34798
10115.88
Laying of brick on edge soling with S.O.B. (dismatled) bricks SCH PWD-CHAPT NO-20 SI NO-2 762(b)
9
990
110
Supply of 110 mm PVC support clamp
48
1680
35
Supplying and fixing of display board i/c photography
1
4200
4200
Sifting of Mechanised boring machine to work site
1
3000
3000
Digging of pit for water collecting (Pit size = 3.0mX3.0mX1.00m = 9.00 m3)
9
1003
111.53
Drilling of 200mmx350mm boring by small mechanised rig machine i/c lowering all complete
33
18051
547
Tractor Charges
10
4700
470
Tankar charges
2
380
190
Labour Charges in mislenious work other than drilling.
5
1150
230
Development charge by compressor 365 C.F.M. (100 PSI)
5
9200
1840
Supply of 150 mm dia Plain PVC pipe 06 kgf/cm2 with coupler
21
7875
375
Supply of 150 mm dia perforated PVC pipe 06 kgf/cm2
12
4500
375
supply of 16 No & 30 No Nylon mesh Tubelar bag 3.0m X 0 .45 m
4
236
59
Supply of PVC Strip (16 m)
2
8
4
Supply of 150 mm dia PVC End cap
2
350
175
Supply of solvent cement
0.2
60
300
Pea Gravel
2.59
16504
6372.23
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements